CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN

Transcripción

CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN
CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN
State Road 944/Hialeah Drive/NW 54 Street
Roadway Project
From East 4 Avenue to East 10 Avenue
Carretera Estatal 944/Hialeah Drive/Calle 54 del NW
Proyecto de Carretera
Desde la Avenida 4 del este hasta la Avenida 10 del este
www.fdotmiamidade.com
FIN No.: 418239-1-52-01
Project Overview
Begins: October 2010
Descripción del Proyecto
On Monday, Oct. 4, the Florida Department of
Transportation (FDOT) is scheduled to begin a roadway
project along State Road (S.R.) 944/Hialeah Drive/NW
54 Street from East 4 Avenue to East 10 Avenue.
This project includes:
Repaving and restriping the roadway
Leveling driveways and sidewalks to match the road
Installing curb and gutter
Installing medians
Installing concrete islands next to sidewalks at
several locations
Adding sod on medians
This project will last about six months and cost an
estimated $817,035.
Traffic Flow
To complete this work safely, it will be necessary to close
traffic lanes and sidewalks at times. Tasks will be done in
stages to minimize the effects on the community.
At least one lane will be open at all times. Bus stops will
not be affected.
Please note that this schedule may change due to
bad weather or other unexpected conditions.
For more information on lane closures and other
project details, log onto the FDOT District Six
website at www.fdotmiamidade.com.
(Over)
El día lunes, 4 de octubre, el Departamento de Transporte
de la Florida (FDOT) tiene programado comenzar un
Proyecto de Carretera a lo largo de la Carretera Estatal
(S.R.) 944/Hialeah Drive/Calle 54 del NW desde la Avenida
4 del este hasta la Avenida 10 del este.
Este proyecto incluye:
Repavimentar y aplicar de nuevo las franjas en la
carretera
Nivelar las entradas de estacionamiento, y la aceras
para empatarlas con la carretera
Instalar bordes y cunetas
Instalar islas separadoras de tráfico
Instalar islas separadoras de concreto en ciertas
localizaciones al lado de las aceras
Añadir áreas verdes
El proyecto durará alrededor de seis meses y su costo esta
estimado en aproximadamente $817,035.
Circulación Vehicular
Para completar este trabajo con seguridad, será necesario
cerrar carriles de tráfico y aceras en ciertos momentos. El
trabajo será construido en etapas para disminuir los efectos
de la construcción en la comunidad.
Siempre se mantendrá al menos un carril abierto. Las
paradas de autobuses no serán afectadas.
Estas fechas pueden cambiar según las condiciones
del tiempo y otras condiciones imprevistas.
Para más información sobre los cierres de carriles y
otros detalles sobre el proyecto,
visite la página web del FDOT Distrito Seis
www.fdotmiamidade.com.
(Voltear)
Florida Department of Transportation
District Six Construction Office
1000 NW 111 Street
Miami, FL 33172
www.fdotmiamidade.com
Always Put Safety First
For your safety and the safety of others, please use caution when
driving, walking or biking around any construction area.
The department does its best to lessen the effects of construction;
however, you might experience one or more of the following while
driving, walking or biking through the project area:
Lane closures
Driveway closures
Sidewalk closures
Increased dust and noise
Heavy equipment and personnel moving around work zones
Helpful Tips
Dial 511 or visit fl511.com for real-time traffic information.
Wearing a safety belt is the single most effective way to protect
people and reduce fatalities in motor vehicle crashes.
Give yourself a little extra time to reach your destination.
Obey all signs posted within the construction zone.
Watch for portable message boards that provide timely
information about upcoming detours and lane closures.
Construction Zone
S.R. 944/Hialeah Drive/NW 54 Street
from East 4 Avenue
to East 10 Avenue
For more information,
please contact the FDOT Project Administrator
Franche Perdomo at
305-654-7018 or the Public Information
Specialist Heather Leslie at 305-499-2391 or
[email protected].
Ponga Siempre la Seguridad Primero
Para su seguridad y la de los demás, por favor sea precavido al conducir su
vehículo o al caminar o andar en bicicleta por la zona de construcción.
Aunque el departamento de transporte se esfuerza por disminuir los efectos
relacionados con la construcción, es posible que usted sea sujeto a uno o más
de los siguientes inconvenientes al manejar, caminar o andar en bicicleta por la
zona del proyecto:
Cierres de carriles
Cierres de entradas de estacionamientos
Cierres de aceras
Aumento de polvareda y ruidos
Equipo pesado y cuadrillas de obreros desplazándose dentro y
fuera de las zonas de trabajo
Sugerencias Útiles
Marque 511 o visite www.fl511.com para obtener información actualizada
del tráfico.
Usar el cinturón de seguridad es la manera más efectiva de proteger a sus
pasajeros y reducir las fatalidades en accidentes de automóviles.
Salga un poco antes para llegar a su destino a tiempo.
Obedezca todos las señales y letreros colocados en la zona de la
construcción.
Busque los letreros de mensajes electrónicos que proveen información
Zona De Construcción
S.R. 944/Hialeah Drive/Calle 54 del NW
entre la Avenida 4 del este
y la Avenida 10 del este
Para obtener más información,
por favor comuníquese con el Administrador del
Proyecto, Franche Perdomo, al 305-654-7018 o
con la Especialista de Información Pública,
Heather Leslie, al 305-499-2391
o por correo electrónico a:
[email protected].

Documentos relacionados

CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN

CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN carriles de tráfico y aceras. La construcción se realizará durante el día. El trabajo será construido en etapas para disminuir los efectos de la construcción en la comunidad.

Más detalles