I-70 East EIS - February 2016 Public Hearings
Transcripción
I-70 East EIS - February 2016 Public Hearings
More details can be found in Puede encontrar más detalles Attachment A en el Anexo A of the Final EIS del EIS Final Build Alternatives Alternativas de Construcción COLORADO BLVD Colorado Boulevard – Central Park Boulevard 48TH AVE 48TH AVE UE BE C ST FOREST ST 47TH AVE DR WILLOW ST R KD REE DC SAN TRENTON ST 48TH AVE Q THE SHOPS AT NORTHFIELD STAPLETON S 46TH AVE DR A N D C R K IVY ST E LEYDEN ST E 46TH AVE YOSEMITE ST YOSEMITE ST DAHLIA ST Safeway Distribution Center AIR LA W N RD SA SMITH ND QUEBEC ST ONEIDA ST HOLLY ST MONACO ST SMITH RD CR EEK RD GENEVA ST HAVANA ST IRONTON ST CENTRAL PAR Central Park Boulevard – I-225 45TH AVE 45TH AVE 45TH AVE PEORIA ST 45TH AVE AVE CA RS ON S T 44TH 42ND 40TH AVE AVE 40TH AVE LIMA ST UP RR SP UR 40TH AVE WHEELING ST 39TH AVE Proposed highway and ramps Proposed street configuration Proposed sidewalk and median Autopista y rampas propuestas Configuración de calles propuesta Aceras y camellones propuestos General-purpose lanes Managed lanes Striped buffer Carriles de uso general Carriles administrados Drainage Construction limits Parcel boundaries Zona neutral señalizada Drenaje Límites de la construcción Límites de la parcela These maps are graphical representations of the alternatives evaluated in the Final EIS intended for illustration purposes only. The alternatives are preliminary in design, and details are subject to change through final design and construction. Estos mapas son representaciones gráficas de las alternativas evaluadas en el EIS Final que solo tienen el propósito de ilustrar. Estos diseños de las alternativas son preliminares y los detalles están sujetos a cambios durante el diseño final y la construcción www.i-70east.com • 303.757.9413 02/2016