(1) FYM M (S America) Santiag

Transcripción

(1) FYM M (S America) Santiag
Santiago Metro (Chile)
Proyect:
Scope:
Property:
Client:
Year:
G R U P O
TERRATEST
Santigo de Chile Metro - Line 4 Development
Anchored walls for “Vicente Valdes” Station
Metro S.A.
PILOTES
TERRATEST
Execute by
Metro Stations
Anchors and Soil Nailing
Description:
To achieve the diaphragm wall stabilization when performing the station's excavation works, temporary anchors with soil nailing
have been provided to reach tensile forces of up to 100 ton.
Summary of site characteristics
- 4.027,60 ml of temporary anchors
- 101 tons maximum tensile force applied
- 3.810 Nailing systems.
Vista general de la Obra
Planta y elevación
Miguel Yuste, 45 Bis Tel.: 914 23 75 00 Fax: 914 23 75 01 E28037 Madrid E-mail: [email protected] www.terratest.com
(1) FYM M (S America) Santiago Chile AN SN Linea 4
Vista ejecución perforaciones

Documentos relacionados