CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN
Transcripción
CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN
CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN State Road 944/Hialeah Drive/NW 54 Street Roadway Project From East 4 Avenue to East 10 Avenue Carretera Estatal 944/Hialeah Drive/Calle 54 del NW Proyecto de Carretera Desde la Avenida 4 del este hasta la Avenida 10 del este www.fdotmiamidade.com FIN No.: 418239-1-52-01 Project Overview Begins: October 2010 Descripción del Proyecto On Monday, Oct. 4, the Florida Department of Transportation (FDOT) is scheduled to begin a roadway project along State Road (S.R.) 944/Hialeah Drive/NW 54 Street from East 4 Avenue to East 10 Avenue. This project includes: Repaving and restriping the roadway Leveling driveways and sidewalks to match the road Installing curb and gutter Installing medians Installing concrete islands next to sidewalks at several locations Adding sod on medians This project will last about six months and cost an estimated $817,035. Traffic Flow To complete this work safely, it will be necessary to close traffic lanes and sidewalks at times. Tasks will be done in stages to minimize the effects on the community. At least one lane will be open at all times. Bus stops will not be affected. Please note that this schedule may change due to bad weather or other unexpected conditions. For more information on lane closures and other project details, log onto the FDOT District Six website at www.fdotmiamidade.com. (Over) El día lunes, 4 de octubre, el Departamento de Transporte de la Florida (FDOT) tiene programado comenzar un Proyecto de Carretera a lo largo de la Carretera Estatal (S.R.) 944/Hialeah Drive/Calle 54 del NW desde la Avenida 4 del este hasta la Avenida 10 del este. Este proyecto incluye: Repavimentar y aplicar de nuevo las franjas en la carretera Nivelar las entradas de estacionamiento, y la aceras para empatarlas con la carretera Instalar bordes y cunetas Instalar islas separadoras de tráfico Instalar islas separadoras de concreto en ciertas localizaciones al lado de las aceras Añadir áreas verdes El proyecto durará alrededor de seis meses y su costo esta estimado en aproximadamente $817,035. Circulación Vehicular Para completar este trabajo con seguridad, será necesario cerrar carriles de tráfico y aceras en ciertos momentos. El trabajo será construido en etapas para disminuir los efectos de la construcción en la comunidad. Siempre se mantendrá al menos un carril abierto. Las paradas de autobuses no serán afectadas. Estas fechas pueden cambiar según las condiciones del tiempo y otras condiciones imprevistas. Para más información sobre los cierres de carriles y otros detalles sobre el proyecto, visite la página web del FDOT Distrito Seis www.fdotmiamidade.com. (Voltear) Florida Department of Transportation District Six Construction Office 1000 NW 111 Street Miami, FL 33172 www.fdotmiamidade.com Always Put Safety First For your safety and the safety of others, please use caution when driving, walking or biking around any construction area. The department does its best to lessen the effects of construction; however, you might experience one or more of the following while driving, walking or biking through the project area: Lane closures Driveway closures Sidewalk closures Increased dust and noise Heavy equipment and personnel moving around work zones Helpful Tips Dial 511 or visit fl511.com for real-time traffic information. Wearing a safety belt is the single most effective way to protect people and reduce fatalities in motor vehicle crashes. Give yourself a little extra time to reach your destination. Obey all signs posted within the construction zone. Watch for portable message boards that provide timely information about upcoming detours and lane closures. Construction Zone S.R. 944/Hialeah Drive/NW 54 Street from East 4 Avenue to East 10 Avenue For more information, please contact the FDOT Project Administrator Franche Perdomo at 305-654-7018 or the Public Information Specialist Heather Leslie at 305-499-2391 or [email protected]. Ponga Siempre la Seguridad Primero Para su seguridad y la de los demás, por favor sea precavido al conducir su vehículo o al caminar o andar en bicicleta por la zona de construcción. Aunque el departamento de transporte se esfuerza por disminuir los efectos relacionados con la construcción, es posible que usted sea sujeto a uno o más de los siguientes inconvenientes al manejar, caminar o andar en bicicleta por la zona del proyecto: Cierres de carriles Cierres de entradas de estacionamientos Cierres de aceras Aumento de polvareda y ruidos Equipo pesado y cuadrillas de obreros desplazándose dentro y fuera de las zonas de trabajo Sugerencias Útiles Marque 511 o visite www.fl511.com para obtener información actualizada del tráfico. Usar el cinturón de seguridad es la manera más efectiva de proteger a sus pasajeros y reducir las fatalidades en accidentes de automóviles. Salga un poco antes para llegar a su destino a tiempo. Obedezca todos las señales y letreros colocados en la zona de la construcción. Busque los letreros de mensajes electrónicos que proveen información Zona De Construcción S.R. 944/Hialeah Drive/Calle 54 del NW entre la Avenida 4 del este y la Avenida 10 del este Para obtener más información, por favor comuníquese con el Administrador del Proyecto, Franche Perdomo, al 305-654-7018 o con la Especialista de Información Pública, Heather Leslie, al 305-499-2391 o por correo electrónico a: [email protected].
Documentos relacionados
CONSTRUCTION AHEAD / SE APROXIMA CONSTRUCCIÓN
carriles de tráfico y aceras. La construcción se realizará durante el día. El trabajo será construido en etapas para disminuir los efectos de la construcción en la comunidad.
Más detalles