BRIEF OUTLINE
Run-of river hydroelectric power plant. Total installed
capacity of 31.5 MW, using La Herradura river flow, and including
two subprojects in a chain, at two points: upstream and
downstream the river. .
PROMOTER
OWNER
EMISSIONS
REDUCTIONS
POTENTIAL (2008 2012)
EMISSIONS REDUCTION POTENTIAL
DURING CREDITING PERIOD
(Ton CO2e )
(number of years)
PROJECT LATEST
DOCUMENT
PROJECT STATUS
NATIONAL
INTERNATIONAL
EEPPM
EEPPM
275,180
481,566
7
PDD
LoA
R
110,040
192,570
7
PDD
LoA
R
2
Run-of-river small hydroelectric plant that uses Rio Piedras flow to
Agua Fresca
generate electricity with a pelton turbine of 7.4 MW capacity. It is
Multipurpose and
located downstream the Rio Piedras reservoir (which means that
environmental services
the project reuses the water from that hydro plant) and takes
project
advantage of a 327m head
AGUAS DE LA
CABAÑA
GENERADORA UNIÓN
3
Cañaveral:
Run-of-river hydroelectric project of 68 MW . The technology
environmental services includes two Pelton turbines of 34MW each and receive the flow
project
from the Arma river in Sonsosn and Aguadas municipalities.
GENERADORA
UNIÓN
Not clear
1,737,143
3,040,000
7
PIN
NOL
4
Encimadas:
Run-of-river hydroelectric project of 94MW. The technology
environmental services includes two Pelton turbines of 47 MW each that receive the flow
project
from the Arma River in Sons on and Aguadas municipalities.
GENERADORA
UNIÓN
Not clear
2,000,000
3,500,000
7
PIN
NOL
5
Manso river
hydroelectric project
Run-of-river hydroelectric project of 27 MW. It uses the river
Manso flow before it is discharged to the Amani dam in La MIel I
hydropower plant.
ISAGEN
ISAGEN
356,312
623,616
7
PIN
NOL
6
Santa Ana
Hydroelectric project
Small hydroelectric project of 13.43 MW. Bogotá's main water
supply system provides the hydro head.
EAAB-CAEMA
EMPRESA DE
ACUEDUCTO Y
ALCANTARILLADO DE
BOGOTÁ S.A. E.S.P.
103,210
206,424
10
PIN - PDD
LoA
7
Amoya: environmental
services project
Run-of river project in Amoya River. The technology include 2
Pelton Turbines of 39.8 MW each.
ISAGEN-WORLD
BANK
ISAGEN
1,802,000
3,153,000
7
PIN - PDD - ERPA
LoA
GENERADORA
UNIÓN
GENERADORA UNIÓN
785,660
1,374,908
7
PIN
LoA/p
GENERADORA
UNIÓN
GENERADORA UNIÓN
366,417
1,797,768
7
PIN
LoA/p
AREVA T&D y ONF
International
158,112
131,760
10
PIN
LoI
EEPPM
EEPPM
72,176
126,308
7
PIN - PDD - ERPA
LoA
IPSE
IPSE
61,000
427,000
7
PIN
LoI
IPSE
IPSE
4,385
26,315
10
PIN
LoI
744,000
1,240,000
10
PIN
NOL
8
9
10
Ambeima:
Run-of-river project of 45 MW in Ambeima river. The technology
environmental services
includes two Pelton turbines.
project
Chili river:
Run-of-river project of 60 MW in Chili river. The technology
environmental services
includes two Pelton turbines of 30 MW each
project
Electricity generation Construction of two biomass electricity plants of 4 and 8 MW using AREVA T&D y
with Biomass
rice husk as fuel from rice mills in Meta and Huila Regions
ONF International
Wind park located in the northern region of Colombia. Installed
capacity of 19.5 MW. 15 wind turbines of 1.3 MW, 3 bladed and
horizontal axis.
Hydroelectric project of 12.5 MW in Rio Brazo seco. The main
purpose is to improve living conditions of Iscuandé, Guapi and
Timbiqui communities, by replacing equipments currently using
fossil fuels.
11
Jepirachi wind power
project
12
Guapi: small
hydroelectric plant
project
13
Mitú Hydroelectric
project
Small hydro power plant in Colombia with an installed capacity of 2
MW in Vaupes river.
Wind energy park
Jouktai
Wind park of 32MW in northern Colombia, in Wayuu communities
territories: Teruasaru, it is expected to use 2MW turbines with a WAYUU S.A ESP
hub height of 67 m
14
WAYUU S.A ESP
15
Amaime Minor
Hydroelectric run-of.river power plant, with a total installed capacity
Empresa de Energía del
Hydroelectric Power of 18 MW in Amaime river. The technology includes two Francis UNIÓN FENOSA
Pacífico- EPSA
Plant
turbines of 9 MW.
22,388
78,358
7
PIN- PDD
LoA/p
16
Bugalagrande small Hydroelectric run-of.river power plant, with a total installed capacity
Empresa de Energía del
hydroelectric power
of 43 MW in Bugalagrande river. The technology includes three UNIÓN FENOSA
Pacífico- EPSA
plant
Pelton turbines.
314,448
78,612
7
PIN
NOL
Plan to increase installed capacity and to increase combined cycle Termobarranquilla
Termobarranquilla S.A.
efficiency through design improvement and new installations and
S.A. E.S.P. –
E.S.P. – TEBSA
equipment.
TEBSA
751,808
1,315,664
7
PIN
NOL
411,537
10
PIN
LoA/p
5,000,000
10
PIN
NOL
17
Energy efficiency
project in
Termobarranquilla
18
Montañitas
Hydroelectric project
Hydroelectric run-of.river power plant of 25MW in Rio Grande river
section located in Don Matias and Santa Rosa de Osos
GENERADORA
municipalities,. It has been designed to receive a flow of 7 m3/s
UNIÓN
and net head of 416 m. The technology includes two Pelton
turbines of 12.9 MW each.
GENERADORA UNIÓN
146,978
19
Second
interconnection
Colombia- Ecuador
230 kV
The project's objective is to carry out the second interconnection
between Colombia and Ecuador. The length of this connection will
Empresa de
Empresa de Energía de
be about 370 km with a electric line of 230 kV. The lines will be: Energía de Bogotá
Bogotá - Transelectric
Betania - Altamira, Altamia-Mocoa, Mocoa - Jamondino, Jamondi - - Transelectric
Pomasqui.
2,500,000
22
Small hydroelectric
project: Rio Negro Puerto Salgar (9,6
MW)
The purpose of the project is to restart the electricity generation of EMPRESA DE
EMPRESA DE
ENERGÍA DE
the Rio Negro small hydroelectric plant (9.6 MW) which will be
ENERGÍA DE
connected to the grid, and includes the retrofitting of the existing CUNDINAMARCA CUNDINAMARCA S.A.
E.S.P.
plant.
S.A. E.S.P.
94,328
165,074
7
PIN
NOL
23
La Cascada 2.3
MWHydroelectric
project
La Cascada is a run-of- river renewable small hydroelectric
generating plant, with a capacity of 2.3 MW. The project will
have a total head of 100 m and a design flow rate of 3.0
m3/s. The hydroelectric power station has a horizontal axis
Francis type turbine connected to the generator.
MGM
PRESTADORA DE
SERVICIOS PÚBLICOS
LA CASCADA S.A.
E.S.P.
20,400
51,390
10
PIN - PDD
LoA
27
Carbones del Cerrejon
Wind park
Wind energy park of 10 MW. The electricity generated will be for
the user in coal mining operations. The technology includes 12
turbines
Carbones del
Cerrejón Limited
Carbones del Cerrejón
Limited
52,500
175,000
10
PIN
NOL/p
Hidroeléctrica Río
Mulatos S.A.
E.S.P.
Hidroeléctrica Río
Mulatos S.A. E.S.P.
57,000
190,000
10
PIN
NOL/p
OPTIM Consult
Ltda.
Hidroeléctrica Coconuco
S.A. E.S.P.
13,032
30,408
7
PIN
NOL
GENELEC S.A. ESP
20,000
100,000
7
PIN
LoI
28
Hydroelectric project Run-of-river hydroelectric project of 8.7 MW. Flow: 3.4 m3/s, head:
Mulatos river
301 m.
29
Coconuco
hydroelectric project
30
The project intends to continue the second stage of Patico
Patico Hydroelectric Hydroelectric project which currently has an installed capacity of GENELEC S.A.
Project
1.4 MW. The second stage is expected to increase that capacity in
ESP
12.5 MW and provide electricity for the region.
31
Hydroelectric project:
San Andrés
Run-of-river small hydro plant in San Andrés River. The total
installed capacity is 20 MW and is expected to receive a flow of
6.24 m3/s. .
Hidroturbinas
Delta S.A.
Generadora San Andrés
S.A ESP
116,280
406,960
7
PIN
LoI
32
Small hydroelectric
project: Zuca I
Run-of.river small hydro power plant in Santa Inés. Total installed
capacity of 8 MW. Average flo is 1.7 m3/s.
Hidroturbinas
Delta S.A.
PCH Luzma S.A.
41.259
144.408
7
PIN
LoI
33
Small hydroelectric
project Luzma I
Run-of.river small hydro power plant in Riachón river, The installed
capacity is expected to be 20 MW, designed to receive a flow of
6m3/s.
Hidroturbinas
Delta S.A.
Hidroturbinas Delta S.A
106,400
372,400
7
PIN
LoI
34
Small hydroelectric
project Luzma I
Run-of.river small hydro power plant in Riachón river, The installed
capacity is expected to be 16.2 MW, designed to receive a flow of
6m3/s.
Hidroturbinas
Delta S.A.
Hidroturbinas Delta S.A
43,700
305,900
7
PIN
LoI
Increase 3.2 MW of installed capacity at Cococnuco hydropower
plant. The technology includes a Francis turbine designed to
receive 4m3/s flow.
R
R
R