1 La Vuelta y la Herradura Hydroelectric project Run
Transcripción
1 La Vuelta y la Herradura Hydroelectric project Run
PROJECT NUMBER 1 PROJECT NAME La Vuelta y la Herradura Hydroelectric project BRIEF OUTLINE Run-of river hydroelectric power plant. Total installed capacity of 31.5 MW, using La Herradura river flow, and including two subprojects in a chain, at two points: upstream and downstream the river. . PROMOTER OWNER EMISSIONS REDUCTIONS POTENTIAL (2008 2012) EMISSIONS REDUCTION POTENTIAL DURING CREDITING PERIOD (Ton CO2e ) (number of years) PROJECT LATEST DOCUMENT PROJECT STATUS NATIONAL INTERNATIONAL EEPPM EEPPM 275,180 481,566 7 PDD LoA R 110,040 192,570 7 PDD LoA R 2 Run-of-river small hydroelectric plant that uses Rio Piedras flow to Agua Fresca generate electricity with a pelton turbine of 7.4 MW capacity. It is Multipurpose and located downstream the Rio Piedras reservoir (which means that environmental services the project reuses the water from that hydro plant) and takes project advantage of a 327m head AGUAS DE LA CABAÑA GENERADORA UNIÓN 3 Cañaveral: Run-of-river hydroelectric project of 68 MW . The technology environmental services includes two Pelton turbines of 34MW each and receive the flow project from the Arma river in Sonsosn and Aguadas municipalities. GENERADORA UNIÓN Not clear 1,737,143 3,040,000 7 PIN NOL 4 Encimadas: Run-of-river hydroelectric project of 94MW. The technology environmental services includes two Pelton turbines of 47 MW each that receive the flow project from the Arma River in Sons on and Aguadas municipalities. GENERADORA UNIÓN Not clear 2,000,000 3,500,000 7 PIN NOL 5 Manso river hydroelectric project Run-of-river hydroelectric project of 27 MW. It uses the river Manso flow before it is discharged to the Amani dam in La MIel I hydropower plant. ISAGEN ISAGEN 356,312 623,616 7 PIN NOL 6 Santa Ana Hydroelectric project Small hydroelectric project of 13.43 MW. Bogotá's main water supply system provides the hydro head. EAAB-CAEMA EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTÁ S.A. E.S.P. 103,210 206,424 10 PIN - PDD LoA 7 Amoya: environmental services project Run-of river project in Amoya River. The technology include 2 Pelton Turbines of 39.8 MW each. ISAGEN-WORLD BANK ISAGEN 1,802,000 3,153,000 7 PIN - PDD - ERPA LoA GENERADORA UNIÓN GENERADORA UNIÓN 785,660 1,374,908 7 PIN LoA/p GENERADORA UNIÓN GENERADORA UNIÓN 366,417 1,797,768 7 PIN LoA/p AREVA T&D y ONF International 158,112 131,760 10 PIN LoI EEPPM EEPPM 72,176 126,308 7 PIN - PDD - ERPA LoA IPSE IPSE 61,000 427,000 7 PIN LoI IPSE IPSE 4,385 26,315 10 PIN LoI 744,000 1,240,000 10 PIN NOL 8 9 10 Ambeima: Run-of-river project of 45 MW in Ambeima river. The technology environmental services includes two Pelton turbines. project Chili river: Run-of-river project of 60 MW in Chili river. The technology environmental services includes two Pelton turbines of 30 MW each project Electricity generation Construction of two biomass electricity plants of 4 and 8 MW using AREVA T&D y with Biomass rice husk as fuel from rice mills in Meta and Huila Regions ONF International Wind park located in the northern region of Colombia. Installed capacity of 19.5 MW. 15 wind turbines of 1.3 MW, 3 bladed and horizontal axis. Hydroelectric project of 12.5 MW in Rio Brazo seco. The main purpose is to improve living conditions of Iscuandé, Guapi and Timbiqui communities, by replacing equipments currently using fossil fuels. 11 Jepirachi wind power project 12 Guapi: small hydroelectric plant project 13 Mitú Hydroelectric project Small hydro power plant in Colombia with an installed capacity of 2 MW in Vaupes river. Wind energy park Jouktai Wind park of 32MW in northern Colombia, in Wayuu communities territories: Teruasaru, it is expected to use 2MW turbines with a WAYUU S.A ESP hub height of 67 m 14 WAYUU S.A ESP 15 Amaime Minor Hydroelectric run-of.river power plant, with a total installed capacity Empresa de Energía del Hydroelectric Power of 18 MW in Amaime river. The technology includes two Francis UNIÓN FENOSA Pacífico- EPSA Plant turbines of 9 MW. 22,388 78,358 7 PIN- PDD LoA/p 16 Bugalagrande small Hydroelectric run-of.river power plant, with a total installed capacity Empresa de Energía del hydroelectric power of 43 MW in Bugalagrande river. The technology includes three UNIÓN FENOSA Pacífico- EPSA plant Pelton turbines. 314,448 78,612 7 PIN NOL Plan to increase installed capacity and to increase combined cycle Termobarranquilla Termobarranquilla S.A. efficiency through design improvement and new installations and S.A. E.S.P. – E.S.P. – TEBSA equipment. TEBSA 751,808 1,315,664 7 PIN NOL 411,537 10 PIN LoA/p 5,000,000 10 PIN NOL 17 Energy efficiency project in Termobarranquilla 18 Montañitas Hydroelectric project Hydroelectric run-of.river power plant of 25MW in Rio Grande river section located in Don Matias and Santa Rosa de Osos GENERADORA municipalities,. It has been designed to receive a flow of 7 m3/s UNIÓN and net head of 416 m. The technology includes two Pelton turbines of 12.9 MW each. GENERADORA UNIÓN 146,978 19 Second interconnection Colombia- Ecuador 230 kV The project's objective is to carry out the second interconnection between Colombia and Ecuador. The length of this connection will Empresa de Empresa de Energía de be about 370 km with a electric line of 230 kV. The lines will be: Energía de Bogotá Bogotá - Transelectric Betania - Altamira, Altamia-Mocoa, Mocoa - Jamondino, Jamondi - - Transelectric Pomasqui. 2,500,000 22 Small hydroelectric project: Rio Negro Puerto Salgar (9,6 MW) The purpose of the project is to restart the electricity generation of EMPRESA DE EMPRESA DE ENERGÍA DE the Rio Negro small hydroelectric plant (9.6 MW) which will be ENERGÍA DE connected to the grid, and includes the retrofitting of the existing CUNDINAMARCA CUNDINAMARCA S.A. E.S.P. plant. S.A. E.S.P. 94,328 165,074 7 PIN NOL 23 La Cascada 2.3 MWHydroelectric project La Cascada is a run-of- river renewable small hydroelectric generating plant, with a capacity of 2.3 MW. The project will have a total head of 100 m and a design flow rate of 3.0 m3/s. The hydroelectric power station has a horizontal axis Francis type turbine connected to the generator. MGM PRESTADORA DE SERVICIOS PÚBLICOS LA CASCADA S.A. E.S.P. 20,400 51,390 10 PIN - PDD LoA 27 Carbones del Cerrejon Wind park Wind energy park of 10 MW. The electricity generated will be for the user in coal mining operations. The technology includes 12 turbines Carbones del Cerrejón Limited Carbones del Cerrejón Limited 52,500 175,000 10 PIN NOL/p Hidroeléctrica Río Mulatos S.A. E.S.P. Hidroeléctrica Río Mulatos S.A. E.S.P. 57,000 190,000 10 PIN NOL/p OPTIM Consult Ltda. Hidroeléctrica Coconuco S.A. E.S.P. 13,032 30,408 7 PIN NOL GENELEC S.A. ESP 20,000 100,000 7 PIN LoI 28 Hydroelectric project Run-of-river hydroelectric project of 8.7 MW. Flow: 3.4 m3/s, head: Mulatos river 301 m. 29 Coconuco hydroelectric project 30 The project intends to continue the second stage of Patico Patico Hydroelectric Hydroelectric project which currently has an installed capacity of GENELEC S.A. Project 1.4 MW. The second stage is expected to increase that capacity in ESP 12.5 MW and provide electricity for the region. 31 Hydroelectric project: San Andrés Run-of-river small hydro plant in San Andrés River. The total installed capacity is 20 MW and is expected to receive a flow of 6.24 m3/s. . Hidroturbinas Delta S.A. Generadora San Andrés S.A ESP 116,280 406,960 7 PIN LoI 32 Small hydroelectric project: Zuca I Run-of.river small hydro power plant in Santa Inés. Total installed capacity of 8 MW. Average flo is 1.7 m3/s. Hidroturbinas Delta S.A. PCH Luzma S.A. 41.259 144.408 7 PIN LoI 33 Small hydroelectric project Luzma I Run-of.river small hydro power plant in Riachón river, The installed capacity is expected to be 20 MW, designed to receive a flow of 6m3/s. Hidroturbinas Delta S.A. Hidroturbinas Delta S.A 106,400 372,400 7 PIN LoI 34 Small hydroelectric project Luzma I Run-of.river small hydro power plant in Riachón river, The installed capacity is expected to be 16.2 MW, designed to receive a flow of 6m3/s. Hidroturbinas Delta S.A. Hidroturbinas Delta S.A 43,700 305,900 7 PIN LoI Increase 3.2 MW of installed capacity at Cococnuco hydropower plant. The technology includes a Francis turbine designed to receive 4m3/s flow. R R R