Dossier - Construcciones MARACOF SL

Transcripción

Dossier - Construcciones MARACOF SL
PRESENTATION
MARACOF,SL.
MARACOF, S.L.
Manuel Titos Salazar
[email protected] / 958 17 28 54
12/01/2011
MARACOF,S.L.
FECHA
PRESENTATION
Página 1 de 30
INDEX
1.INTRODUCTION
1.1.HISTORICAL BACKGRUOND
1.1.1.AFFILIATED COMPANIES
1.2. WORKS ACCOMPLISHED
1.2.1.INDUSTRIAL SECTOR
1.2.2.LINEAR WORKS SECTOR (HIGHWAY AND RAILWAY)
1.2.3.WATER TANK AND DEPURATION SECTOR
1.2.4.URBANIZATION, SPORTS FACILITIES AND OTHERS
2.ORGANIZATIONAL STRUCTURE
2.1.BUSINESS POLICY
2.2.HEALTH AND SAFETY
2.3.QUALITY AND ENVIRONMENT
3.EVOLUTION AND GROWTH WITHIN THE LAST 5 YEARS
4.ISO CERTIFICATES 9001, 14001 AND OSHAS 18001
22/03/2011
MARACOF,S.L.
FECHA
PRESENTATION
Página 2 de 30
22/03/2011
1.-INTRODUCTION
Maracof, S.L. is a company dedicated to construction sector, playing the role of
contractor and subcontractor.
Our company is dedicated to the Civil Engineering, though we are involved in some
works of Urbanization, Construction and Single Additional Projects.
Since its foundation The company maintains a constant growth, but it was in the last
decade when we opted for a territorial expansion and business growth.
Our mission is to provide integral solutions to our clients in the execution and
development of the works that we are carrying out. We provide our clients with man power,
machinery and materials necessary. Thanks to the total autonomy we can guarantee that the
projects would be accomplished according to the plan.
Maracof, s.l. is a construction company, which performs most of its works using its
own resources, giving the special importance to the personnel (250 employees ), promoting
its specialization and training. We are hiring local workers which are in the vicinity of the
construction site. In case of any problems we can rapidly increase our man power.
Our growth is supported by continus investment in resources better in quality and
higher in volume.
MARACOF,S.L.
FECHA
PRESENTATION
Página 3 de 30
22/03/2011
1.1.-HISTORICAL BACKGROUND
The company MARACOF, S.L. was founded in 1.986 in Piñar's (area of Granada). Its
head office was moved to Granada in 2.003 where the company was consolidated as one of
the strongest local Construction Companies. Due to its stability the company provides the
highest level of reliability to its customers and suppliers.
In 2.009 the companies head office was moved to a new and ultramodern building,
located in the area of Almunia Garden in Granada, in the office building Atene. The company
departments were centralized in one building. In Atene building there are departments of
construction, accounting and administration, quality and environment, health and safety and
training room, occupy at total space of 600 m2.
Front view of Maracof's head office
In 2.005 in Iznalloz (area of Granad ) a few new facilities were opened. The buildings are meant
to accommodate the Production Workshop (where the steels for rebar are produce), and
Machinery Depot. That ensures the continuity of production of rebar at any time, without
having to rely on other suppliers.
Front and the inside views of Maracof´s building in Iznalloz
MARACOF,S.L.
FECHA
PRESENTATION
Página 4 de 30
22/03/2011
1.1.1.-AFFILIATED COMPANIES
With the purpose of being able to carry out all Maracof's projects, affiliated abd
associated companies was founded. These companies come from diverse sectors- that we
have considered to be strategic, what makes us able to give an integral and complete service in
the execution of our works, using our own resources.
The same year, the affiliated Maracof Energy was founded, with head office in
Villanueva de la Serena, in the province of Badajoz, with the aim of attending in a more nearby
way to those works executed in the Autonomous Community of Estremadura. The purpose of
this subsidiary is to be able to attend in a more efficient way to a great number of industrial
projects executed in the zone. This company has a head office in Villanueva of the Serenade,
and workshop of reinforced concrete in Campanario.
In 2010 there was created the company SERCOT as Maracof's subsidiary. This company
is dedicated to the field of the Topography. We consider that the topography has a crucial
importance in the Industrial projects as well as in another type of projects. There was created
a wide crew dedicated permanently to this type of works to guarantee the maximum
experience in projects which require topography. We try to complement the activity that
Maracof executes, training our workforce and providing it with the major specialization, so
necessary in this type of projects.
MARACOF,S.L.
FECHA
PRESENTATION
Página 5 de 30
22/03/2011
In 2.007 there was founded Maracof's subsidiary (SYDE), destined to the metallic
structure, with office in Padul (Granada.) From this subsidiary, there are executed all kinds of
industrial buildings, workshops, ships etc … and it´s used as a complement to our activities of
civil engineering, which always require this type of works and supplies. Moreover it allows us
provide to our clients a better and more complete service.
1.2. - WORKS ACCOMPLISHED:
Maracof carries out all kinds of civil engineering of great dimension. The company
focuses the mayor part of its resources to the constriction of civil engineering inside the
industrial sector, linear works (highway and railway), water tank and treatment.
Maracof participates in different projects as contractor company (executing the
complete project of civil engineering), or as a subcontractor (executing the part of structures).
MARACOF,S.L.
FECHA
PRESENTATION
Página 6 de 30
22/03/2011
1.2.1.-INDUSTRIAL WORKS:
Maracof carries out all kinds of civil engineering of great dimension. The company
utilizes the major part of its resources in the constriction of civil engineering inside the
industrial sector.
This sector, requires major technical and training specialization of the technical
personnel and of the operators. According to this, we rely on a wide range of human resources
that possess an experience of more than 10 years in civil engineering.
To be able to attend to all the demands of this type of projects, we possess the most
wide range of supply companies of all material (special sheets, mortars and resins, spikes and
high-performance embedded etc …). We count with our own tests and formulas for work in
different singular materials like refractory concretes, fireproof paintings and thermal
isolations.
Inside the industrial sector, we have a great experience in the execution of Solar
Power Plants.
As a Contractor we have executed the following projects:
Projects that we carried out:
1.
MARACOF,S.L.
FECHA
PRESENTATION
Página 7 de 30
22/03/2011
ANDASOL 1 AND ANDASOL 2 (2 Solar Power Plants of Parabolic Trough Concentrators of
50 MW).
• Located in Aldeire (Granada)
• Executed for UTE ANDASOL 1 (COBRA - SENER) / UTE ANDASOL 2
• Budget: 16.195.000,00 €
• Project details:
o
Power Island: Foundations, like: Benches for equipments (turbine,
boilers, preheaters, steam generators, transformers ….) / Rafts (Cooling
Towers, Storage, Effluent)
o
Administration and electrical buildings
o
Foundations of Tanks (Tq Salts Ø42m, Tq Water …)
o
Urbanization and Finishing
o
Works of Factory and Bridges in approach roads.
Power Island Area
2.
MARACOF,S.L.
FECHA
PRESENTATION
Página 8 de 30
SOLAR 3 (Thermoelectric Plant of heliostats 17 MW).
• Located in Fuentes de Andalucia (Seville)
• Executed for SOLAR UTE 3 (SENER - COBRA)
• Budget: 1.290.000,00 €
• Project details:
o
Temporary Facilities
o
Area of Salts (Tower for salt pump and Salt Tanks)
o
Underground Networks (oily, electrical, rain water etc ..)
Foundations of Salt Tanks and Salt pump
22/03/2011
MARACOF,S.L.
FECHA
PRESENTATION
Página 9 de 30
22/03/2011
3. MANCHASOL 1 AND MANCHASOL 2 (2 Solar Power Plants of Parabolic Trough
Concentrators of 50 MW)
• Located in Alcazar de San Juan (Ciudad Real)
• Executed for UTE MANCHASOL 1 (COBRA - INITEC) and UTE MANCHASOL 2
• Budget: 14.635.000,00 €
• Project details:
o
Pilot of the Solar Field (12.400 units of Piles)
o
Power Island: Foundations, like: Benches for equipments (turbine,
boilers, preheaters, steam generators, transformers ….) / Rafts (Cool
Towers, Storage, Effluent)/
o
Administration and electrical buildings
o
Foundations of Tanks (Tq Salts Ø42m, Tq Water …)
o
Urbanization and Finishing
o
Works of Factory and Bridges in approach roads.
Foundations of Salt Tanks Ø42 m and Turbine
MARACOF,S.L.
FECHA
PRESENTATION
Página 10 de 30
22/03/2011
4. ANDASOL 3 (Solar Power Plant of Parabolic Trough Concentrators of 50 MW).
• Located in La Calahorra (Granada)
• Executed for UTE ANDASOL 3 (SOLAR MAN MILLENIUM - I LAST FELGUERA)
• Budget: 18.225.000,00 €
• Project details:
o
Pilot of the Solar Field (6200 units of Piles)
o
Windbreak perimeter fences
o
Power Island: Foundations, like: Benches for equipments (turbine,
boilers, preheaters, steam generators, transformers ….) / Rafts (Cool
Towers, Storage, Effluent)/
o
Underground Networks (oily, electrical, rain water etc ..)
o
Administration and electrical buildings
o
Ships and Workshops
o
Urbanization and Finishing
Windbreak fences and Electrical Building
MARACOF,S.L.
FECHA
PRESENTATION
Página 11 de 30
22/03/2011
5. VALLESOL 1 (Solar Power Plant of Parabolic Trough Concentrators of 50 MW).
• Located in San Jose del Valle (Cadiz)
• Executed for UTE FENCE in 1 (SENER - COBRA)
• Budget: 8.714.000,00 €
• Project details:
o
75 % of pilot of the Solar Field (4650 units of Piles)
o
Benches for equipments (turbine, boilers, preheaters, steam generators,
transformers ….)
o
Rafts (Cool Towers, Storage, Effluent)
o
Foundations of Tanks (Tq Salts, Tq Water …)
o
Administration and electrical buildings
Ciment Tanks and Tower
MARACOF,S.L.
FECHA
PRESENTATION
Página 12 de 30
6. AXTEXOL 2 (Solar Power Plant of Parabolic Trough Concentrators of 50 MW).
•
Located in Badajoz
•
Executed for ELECNOR S.A.
•
Budget: 1.680.000,00 €
•
Project details:
o
pilot of the Solar Field (Piles)
7. TOWER CRS (Solar Power Plant of Central Tower Receiver of 7 MW).
•
Located in Sanlucar la Mayor (Seville)
•
Executed for UTE CRS (ABENER - TEYMA)
•
Budget: 1.320.000,00 €
•
Project details:
o
Tower of reinforced concrete of 80 m
o
Ciment Trafos / Water tanks
CRS Tower in construction phase
22/03/2011
MARACOF,S.L.
FECHA
PRESENTATION
Página 13 de 30
22/03/2011
At present we are executing the following industrial projects:
8. AXTE 1-A (Solar Power Plant of Parabolic Trough Concentrators of 50 MW).
•
Located in Alcazar de San Juan (Ciudad Real)
•
Executed for ELECNOR S.A.
•
Budget: 7.750.000,00 €
•
Works contracted at present:
o
pilot of the Solar Field (6000 units Piles)
o
Power Island: Foundations, like: Benches for equipments (turbine,
boilers, preheaters, steam generators, transformers ….) / Rafts (Cool
Towers, Storage, Effluent)/
Ciment Tanks of Expansion and Condenser
MARACOF,S.L.
FECHA
PRESENTATION
Página 14 de 30
22/03/2011
9. AXTE 1-B (Solar Power Plant of Parabolic Trough Concentrators of 50 MW).
•
Located in Alcazar de San Juan (Ciudad Real)
•
Executed for ELECNOR S.A.
•
Budget: 2.320.000,00 €
•
Works contracted at present:
o
50 % of pilot of the Solar Field (Piles)
o
Windbreak fences
10. TERMOSOL 1 and 2 (Solar Power Plant of Parabolic Trough Concentrators of 50 MW).
•
Located in Navalvillar de Peels (Badajoz)
•
Executed for NEXTERA
•
Budget: 4.660.000,00 €
•
Works contracted at present:
o
50 % of pilot of the Solar Field (8000 units of Piles)
Drilling piles CPI-4
MARACOF,S.L.
FECHA
PRESENTATION
Página 15 de 30
22/03/2011
11. CT BORGES BLANQUES (Biomass and Solar Power Mixed Plant of 22 MW).
•
Located in BORGES BLANQUES (Lleida)
•
Executed for UTE BORGES (COMSA EMTE - ABANTIA)
•
Budget: 680.000,00 €
•
Works contracted at present:
o
Pilot of the Solar Field (2800 units of Piles)
In summary, taking into account the already executed plants and those that we are
executing at present, we have participated in construction of 14 Solar Power Plants, including
the greatest part of execution of civil engineering. This experience makes us one of the more
qualified national company, in the execution of Industrial Plants.
MARACOF,S.L.
FECHA
PRESENTATION
Página 16 de 30
22/03/2011
1.2.2.-LINEAR WORKS (HIGHWAY AND RAILWAY):
Maracof has executed from his beginnings all kinds of railway, highways and Roads
works, making parts of structures such as Viaducts, Tunnels, Overpasses and Underpasses, and
all kinds of manufactures and drainage works.
Viaduct A-316 Lucena - Cabra / Viaduct Mu-31 (Murcia)
- HIGHWAY A-44 SIERRA NEVADA. THE RING ROAD OF GRANADA. STRETCH:
ALBOLOTE (CONNECTED WITH THE A-92) – SANTA FE (CONNECTED WITH THE A-329 . the
tender winner UTE SANTA FE (COPISA - VERA), under the management of Mr. Enrique Catalina.
Budget 2.738.028 € Year of initiation 2009, carrying out at present.
- LIGHT RAIL OF GRANADA, LINE 1, STRETCH: MARACENA – VILLAREJO the tender
winner UTE MAVI (OHL - UC 10 - IMATHICA), under the management of Mr. Jose Antonio
Simón.
Budget 1.763.542 € Year of initiation 2009, carrying out at present.
- LIGHT RAIL OF GRANADA, LINE 1, STRETCH: MENDEZ NUÑEZ - WITHDRAWALS the
tender winner UTE DRAGADOS - GARASA - OTERO, under the management of Mr. EMILO
ESTEBAN.
Budget 1.545.121 € Year of initiation 2009, carrying out at present.
MARACOF,S.L.
FECHA
PRESENTATION
Página 17 de 30
22/03/2011
- HIGHWAY A-316, SUB-STRETCH: INTERSECTION A-6000 (TORREQUEBRADILLA) TO
RING ROAD IN MANCHA REAL. the tender winner GEA 21, under the management of Mr.
Antonio Reche.
Budget 298.394 € Year of initiation 2009, carrying out at present.
- HIGHWAY A-334 FROM BAZA TO HUERCAL OVERA, STRETCH: RING ROAD OF
ALBOX the tender winner UTE ALDESA - BSK, under the management of Mr. JOSE SESE.
Budget 714.430 € Year of initiation 2009, carrying out at present.
- RING ROAD OF ROQUETAS DEL MAR: the tender winner UTE ACCIONA – LOPEZ
PORRAS, under the management of Mr. David Espeja.
Budget 2.002.056 € Year of initiation 2008, carrying out at present.
- HIGHWAY MU-21, CONNECTION MU-30 WITH A-30: the tender winner ALDESA,
under the management of Mr. Michael Angel Martinez.
Budget 2.288.033 € Year of initiation 2008, carrying out at present.
- HIGH SPEED RAIL LINE BETWEEN GRANADA AND ANTEQUERA, STRETCH: PINOS
PUENTE - VALDERRUBIO. the tender winner UTE SANDO - IBEROVIAS, under the management
of Mr. Jesus Rojo.
- PRESTSTRESSED PANEL FOR THE VIADUCT ON CAN GIBERT IN THE HIGH SPEED RAIL
LINE MADRID - SARAGOSSA - FRENCH BORDER, STRETCH: RIUDELLOTS-C/JOAN TORO the
tender winner PERI, construction under the direction of Mr. ALFONSO PURPLE.
Budget 482.332 € Execution date 2009.
-DESIGN OF THE A-348, FONDÓN - BEIRES the tender winner FERROVIAL, under the
management of Mr. Emilo.
- NEW SANTA FE CONNECTION IN THE PK 2,9 A-92G the tender winner GEA 21, under
the management of Mrs. Victoria Romero.
MARACOF,S.L.
FECHA
PRESENTATION
Página 18 de 30
22/03/2011
Budget 131.255 € Execution date 2008.
- A-6300, NEW HIGHWAY EXIT SIERRA DE SEGURA. STRETCH: BRIDGE GÉNAVE - L.P.
CIUDAD REAL the tender winner UTE DRAGADOS - GARASA – PROJECTOS Y VIAS, under the
management of Mr. Isaac Tapia.
Budget 381.993 € Execution date 2008.
- DESIGN OF THE A-335 HIGHWAY IN MORALEDA DE ZAFAYONA the tender winner
LOPEZ PORRAS, under the management of Mr. Antonio Ramirez.
Budget 149.764 € Execution date 2007.
- HIGHWAY A-45, CORDOVA – MALAGA, STRETCH: BENAMEJÍ – ENCINAS REALES the
tender winner UTE DETEA - SAN JOSE, under the management of Mrs. Susana Gonzalez.
Budget 171.272 € Execution date 2007.
- HIGHWAY A-317, LUCENA - CABRA, ROAD DUPLICATION the tender winner
ACCIONA INFRASTRUCTURAS - ACONSA, under the management of Mr. David Espeja.
Budget 855.578 € Execution date 2007.
- RING ROAD OF BAENA CN-432, FROM BADAJOZ TO GRANADA. the tender winner
JIMÉNEZ Y CARMONA, S.A.-GEA 21, S.A. U.T.E, under the management of D. Antonio Cano.
Budget 308.829 € Execution date 2006.
- TOLL HIGHWAY AP 7 CARTAGENA VERA. the tender winner UTE AUTOPISTA
CARTAGENA VERA (FCC - PLODER), under the management of Mr, Diego Martinez.
Budget 1.862.200 € Execution date 2005.
- RING ROAD OF BAZA ON A-334 CONNECTED WITH THE A-92N. the tender winner
OHL, S.A., under the management of Mr. Javier Ortega.
Budget 385.000 € Execution date 2005.
MARACOF,S.L.
FECHA
PRESENTATION
Página 19 de 30
22/03/2011
- CONSTRUCTION OF THE ANDALUSIAN TRANSVERSAL AXIS HIGH-SPEED RAILWAY .
STRETCH OSUNA-AGUADULCE. the tender winner U.T.E. OSUNA-AGUADULCE, under the
management of Mr. Aurelio Gomez.
Budget 2.256.000 € Execution date 2005.
- HIGHWAY ACCESS TO MAZARRON FROM THE A-7. the tender winner FERROVIAL LA GENERAL A., under the management of Mr. Alberto Garcia.
Budget 1.882.328 € Execution date 2006.
- DESIGN OF THE A-477. RING ROAD OF GERENA (SEVILLE). the tender winner
OBRASCON HUARTE LAIN, S.A., under the management of Mr. Santiago Martinez.
Budget 302.060,40 € Execution date 2006.
- 36002 RING ROAD OF CANJAYAR, ALMERIA. the tender winner CONSTRUCTIONS
AND PROMOTIONS COPROSA, S.A., under the management of Mr. Alejandro Martinez.
Budget 403.600 € Execution date 2006.
- LOCAL IMPROVEMENT. DRAINAGE IMPROVEMENT. DITCH COVERING. A-7
(HIGHWAY OF THE MEDITERRANEAN) P.K. 241,7 TO 248,8. STRETCH: RONDA EAST MALAGA.
the tender winner HORMIGONES ASFALTICOS ANDALUCES, S.A, under the management of
Mr. Carlos Colina.
Budget 240.500 € Execution date 2005.
- DESIGN OF THE A-385. STRETCH: SANTA FE-LA MALAHA. the tender winner
CONSTRUCTIONES LOPEZ PORRAS S.A. under the management of Mr. Alberto Hita.
Budget 630.000 € Execution date 2004
- DESIGN OF THE A-315 BETWEEN CEAL AND HUESCA for GESTIÓN DE
INFRASTRUCTURAS DE ANDALUSIA, S.A. the tender winner U.T.E. CEAL-HUESCA. (SACYR AZVI), under the management of Mrs. Rosa Martinez
MARACOF,S.L.
FECHA
PRESENTATION
Página 20 de 30
22/03/2011
Budget 420.000 € Execution date 2004
- SETTELMENT OF A92 PK VENTA EL MOLINILLO. the tender winner SITE, S.A. under
the management of Mr. Angel Gomez.
Budget 175.260 € Execution date 2004.
- CONNECTION TO MARACENA. the tender winner U.T.E. MARACENA (UCOP HORMACESA), under the management of Mr. Jesus Puertas.
Budget 185000 € Execution date 2004- RING ROAD OF COIN-INTERSECTION MA-402. the tender winner SALVADOR RUS
LOPEZ CONSTRUCTIONS, S.A., under the management and work of Mr. Francisco Tallon.
Budget 245000 € Execution date 2004.
MARACOF,S.L.
FECHA
PRESENTATION
Página 21 de 30
22/03/2011
1.2.3.- DEPURATION AND TANKS FOR WATER TREATMENT:
Maracof executes works of all kinds for water treatment, including tanks, wastewater
treatment plants, desalination plants.
- CANALIZATION FOR TELECOMMUNICATIONS BETWEEN DEIFONTES AND GRANADA.
the tender winner COBRA INSTALACIONES, under the management of Mr. Ignacio Carrilo.
Budget 78.575 € Year of initiation 2009, carrying out at present.
- 1385 GALVANIZING TREATMENT OF METAL PLANT IN LINARES. the tender winner
AZVI, S.A. under the management of Mr. Jose Garcia.
Budget 1.583.204 € Execution date 2006.
- REHABILITATION OF 1 AND 2 HEADER TANKS OF MAIN SUPPLY PIPE OF THE
OCCIDENTAL COSTA DE SOL. the tender winner DRAGADOS, S.A. under the management of
Mr. Javier Chanes.
Budget 633.880.84 € Execution date 2006.
- LOCAL IMPROVEMENT. DRAINAGE IMPROVEMENT. DITCH COVERING. HIGHWAY
OF THE MEDITERRANEAN P.K. 241,7 TO 248,8. STRETCH: RONDA EAST MALAGA the tender
winner HORMIGONES ASFALTICOS ANDALUCES, S.A, under the management of Mr. Carlos
Colina.
MARACOF,S.L.
FECHA
PRESENTATION
Página 22 de 30
22/03/2011
Budget 240.500 € Execution date 2005.
- RENOVATION OF CONDITIONS OF WATER SUPPLY IN THE NORTH ZONE OF THE
PROVINCE OF CORDOVA. the tender winner AZVI, S.A, under the management of Mr. Jose
Garcia.
Budget 360.000 € Execution date 2005.
MARACOF,S.L.
FECHA
PRESENTATION
Página 23 de 30
22/03/2011
1.2.4.- URBANIZATION WORKS AND OTHER INFRASTUCTURES:
Pavilions of 4 ª extension of the City of Science in Granada
- PUBLIC SPACE ADAPTATION IN ABRUCENA BY DESCENDAND WALL the tender
winner ABRUCENA's TOWN COUNCIL, under the direction of Mrs. PROP GARCIA.
Budget 232.000 € Execution date 2009.
- FOOTBALL FIELD AND WARDROBES IN FEDERICO GARCIA LORCA AVENUE the
tender winner LOPEZ PORRAS, under the management of Mr. Sergio Nouges.
Budget 113.871 € Execution date 2007.
- URBANIZATION WORK IN THE 3 ª PHASE OF WORKS IN THE HEALTH CAMPUS IN
GRANADA the tender winner GRUPO CIVIL SUR, under the management of Mr. Juan Jose.
Budget 261.000 € Execution date 2007.
- 4 ª PHASE IN THE WORKS OF EXTENSION OF THE CITY OF SCIENCE IN GRANADA. the
tender winner DREDGINGS, S.A., under the management of Mr. Juan Abad.
Budget 1.850.609 € Execution date 2005.
- URBANIZATION OF VISTA DEL REY IN ALHAURÍN EL GRANDE. the tender winner
SAVIOR RUS LOPEZ CONSTRUCTIONS, S.A, under the management of Mr. Francisco Salgado.
Budget 698.705 € Execution date 2006
MARACOF,S.L.
FECHA
PRESENTATION
Página 24 de 30
22/03/2011
- URBANIZATION OF INDUSTRIAL WEST ZONE (SECTOR SUP. CH.5.) the tender
winner SALVADOR RUS LOPEZ CONSTRUCTIONS, S.A, under the management of Mr. Luis
Sosoaga.
Budget 632.869 € Execution date 2006.
- PROJECT OF URBANIZATION OF THE COUNTRY HOUSE SANTA MARIA IN ESTEPONA,
ADJUSTED TO THE P.G.O.U. ESTEPONA. the tender winner DROGADOS, S.A., under the
management of Mrs. Susama Gonzalez
Budget 220.000 € Execution date 2005.
- COMPLEMENTARY WORKS IN THE SPORT ARENA- HOST PLACE FOR OF THE XV
MEDITERRANEAN GAMES OF 2005 for TOWN COUNCIL OF ALMERIA under supervision of Mr.
CARLOS LOPEZ CAÑAVATE. the tender winner SALVADOR RUS, under the management of Mr.
Antonio Quesada.
Budget 240.000 €, Execution date 2004.
- URBANIZATION OF ALBORAN's PARK IN TOYO FOR TOWN HALL OF ALMERIA the
tender winner ALDESA CONSTRUCTIONS, S.A. under the management Mr. Jesus Serrano.
Budget 285.000 € Execution date 2004
MARACOF,S.L.
FECHA
PRESENTATION
Página 25 de 30
22/03/2011
2.-ORGANIZATIONAL STRUCTURE OF A COMPANY:
MARACOF S.L. has an Human Resources Department which helps new employees
adapt to the company. It also develops workers training program.
The workers training programs promote the development of the individual and
organizational talent. Includes the Executive Development Programs: education in values and
leadership style, Programs of Development in the area of the Business Management: to make
possible perform job duties more efficiently and General Programs of Development
We offer also Individual Development Programs, adapted to the specific needs of
every person.
MARACOF S.L. is formed by following departments :
- Department of Safety: We are committed to the training and management of the
labor risks prevention, MARACOF S.L. carries out the training and information tasks aimed at
the workforce to obtain the better results in all the areas of company’s activity.
- Department of Quality and Environment: Its aim is to offer an integral management
of accreditations, management of documentation and procedures. Through the rigorous
quality control we want to achieve a total reliability.
- Department
of Administration: Business administration and accounting
management.
- Technical Department: dedicated to the study and execution of the projects, as well
as a cutting and measurement of steel for rebar department. It allows us to carry out any
project in more efficient way.
- Department of Production: The company count with well prepared and experienced
professionals, which allows us execute all the projects we handle.
MARACOF,S.L.
FECHA
PRESENTATION
Página 26 de 30
22/03/2011
GERENTE
SEGURIDAD
ADMINISTRACION
CONTABILIDAD
RR.HH
CALIDAD Y MEDIO
PRODUCCION
COMERCIAL
JEFE TECNICO
COMPRAS/APROVIS
VENTAS
JEFES
JEFE DE
ENCARGADOS
2.1.-BUSINESS POLICY
MARACOF, S.L. is a construction company compromised to carrying out his activities
respecting the environment and providing the maximum satisfaction to his clients. For this
purpose we elaborate Quality, Environment, Safety and Health at Work Policies, which is the
frame for the establishment of our aims.
The system implanted by MARACOF, S.L. satisfies the requirements of the
international standards: UNE-EN ISO 9001:2008, UNE-EN ISO 14001:2004 and OHSAS
18001:2007.
The pillars of our policy are as follows:
1.
It's necessary to know the requirements of our client, both public and private, with the
aim to increase their satisfaction.
2.
The prevention of errors should take priority over their correction.
3.
The activities will be planned, at all the levels of the company, so that to obtain the
constant improvement in the quality, the environment and the safety health at work
areas.
4.
MARACOF,S.L.
FECHA
PRESENTATION
Página 27 de 30
22/03/2011
To carry out our projects in the better way possible and increase our clients
satisfaction, it is important to invest in workers training and professional skills
development, so as to all employees do their job in the best possible way.
5.
The communication, at all organization's levels, is indispensable for the improvement
of quality, environment, safety and health at work.
6.
Very important issue is to have knowledge about the environmental impact of our
activities, so as to, first of all, avoid it, minimize or correct it, as far as possible.
7.
Our company is committed to prevention of pollution derived from our activities.
8.
Our company promise is to comply with the legislation and environmental, safety and
health regulations, as well as those regulations that concern the quality of our works,
the requirements of the clients, and other requirements related to the safety and
health at work.
9.
Our company is committed to prevent damage and deterioration of health during the
performance of work.
10.
The safety and health conditions must govern the accomplishment of our work, at
every post, at all levels.
11.
MARACOF, S.L. incorporates into the execution of its projrcts QUALITY, ENVIRONMENT
and SAFETY AND HEALTH policies.
2.2. SAFETY AND HEALTH
Maracof has been complied from his beginnings with the current legislation regarding safety
and health, because we consider this to be fundamental to obtain stability in the daily activity
of the company.
In 2010 we were certificated with the OHSAS 18.001.
MARACOF,S.L.
FECHA
PRESENTATION
Página 28 de 30
22/03/2011
Average number of work accidents that occur in our company is below the average of our
sector, this data is supported by the report of our Prevention Service (Fremap).
Every year we develop permanent training programs for our workforce. The aim marked for
2010 is that all our workers have a minimal training of 20 hour for safety and health.
Further, our Senior Technical Healthy and Safety Managers are responsible for the
accomplishment of
our policy by Marcof´s staff and
by the companies that Marcof
subcontracts.
At any time, we provide our building works with:
·
1 TOP TECHNICIAN IN LABOR RISKS PREVENTION 600 HOURS
·
1/50 EMPLOYEES. PREVENTIVE RESOURCES: FORMATION OF BASIC LEVEL 60 HOURS
·
ALL WORKERS WILL HAVE H&S TRAINING (AT LEAST 8 HOURS OF TRAINIG)
2.3.-QUALITY AND ENVIRONMENT POLICIES:
Our Quality Assurance Plan is one of the most important aspects in the successful
implementation of any Quality System in the organization. It defines and describes all activities
and methodologies of the above mentioned System, applied to the concrete case of the
execution of civil engineering, of each projects that we carry out.
The MARACOF, S.L. company is committed to accomplish all tasks of the agreement,
satisfying the petitioner´s requests, complying with regulation, official requirements and other
requirements expressed by the petitioner.
The aims that we try obtain by the following Q.A.P. are the following ones:
•
To assure that all the products and services we offer, satisfy the requirements and
expectations of the client.
•
MARACOF,S.L.
FECHA
PRESENTATION
Página 29 de 30
22/03/2011
To anticipate the appearance of problems arising from the use of defective materials
or components.
•
To improve the processes of construction, to increase the productivity and the
profitability by reduction of costs, but not quality.
•
To improve the relationship with our clients and suppliers, providing the confidence
necessary for an external insurance of quality
•
To provide the use of materials and processes which guarantee the safety of the
people and goods. Some of these solutions are: the essential requirements of
mechanical resistance and stability, fire safety, hygiene, health and environment,
safety in the use, protection against noise, energy saving and thermal insulation.
•
Our experience, knowledge and contacts allow us to be able to cope with the
execution of the most peculiar works. We possess a wide range of partner companies
(subcontractor), that collaborate with us continuously from a long time, what
guarantee the perfect execution of the projects.
MARACOF,S.L.
FECHA
PRESENTATION
Página 30 de 30
22/03/2011
3.-EVOLUTION AND GROWTH WITHIN THE LAST 5 YEARS
AÑO
TURNOVER
VARIATION %
PERSONNEL
VARIATION
2010
28.500.000 €
60%
320
39%
2009
17.500.000 €
45%
230
18%
2008
12.055.303 €
23%
195
13%
2007
9.809.611 €
94%
172
56%
2006
5.048.906 €
27%
110
17%
2005
3.973.918 €
94