Office Slide ( With Subframe)
Transcripción
Office Slide ( With Subframe)
ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) ITC-177A-I Pág 1 de 11 Edición nº 1 Index LEAF 1. Sub-frame installation 2 2. Assembly of the clamp profile to the track 4 3. Lower track installation 5 4. Lining installation to the frame 6 5. Upper track installation 7 6. U-lock base installation 8 7. U-Lock installation 8 8. Installation of the strike in U-lock 9 9. Track installation 10 10. Door Leaf installation 10 11. Track cover 11 In order to define the opening sense of the door pay attention to this: If you look at the door on the side where the upper track is intalled, the opening direction is the one to which would make the opening of the door. The photos of these instructions correspond to a left hand opening door. For a rightopening door you must follow all the instructions symmetrically. 1. Sub-frame installation The sub-frame is supplied with threshold and corners that must be removed when the work is completely contrived, never before. Corners Left hand opening Sub-Frame ITC-177A-I Pág 2 de 11 Edición nº 1 ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) Rivet Nut Thresholds The bottom of the frame and lower threshold indicates the ground level. ATTENTION the frame has a sense and it cannot be placed in any position. To install it in the correct position, look up the door where you will notice the upper track, you should see the rivet nut in the sub-frame bar. For doors opening to the left, rivet nuts will be in the bar that it is on our right side(the observer is always on the side where the upper track, where hang the door leaf). For doors opening to the right, rivet nuts will be in the bar that is on our left side. Regulate the sub frame with level and plumb Sub-Frame level ITC-177A-I Pág 3 de 11 Edición nº 1 ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) Front view Sub-frame plumb Side view Sub-frame plumb Receive on-site with open anchors Open the end of the anchors with pliers. Each height has three anchors. After setting the work, remove the brackets and braces. You can finish the wall as you decided, but you have to make sure to leave space for the installation of the linings. ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) ITC-177A-I Pág 4 de 11 Edición nº 1 Remove corners and threshold 2. Assembly of the clamp profile to the track Screwed on the wall, plaster previously, the clamp profile of the track, placing it at the position indicated by the manufacturer regarding the sub-frame (see diagram below for profile position regarding the sub-frame). Used 8x40 nylon studs with screws of 6.3 x50. Level Camping Profile Support Sub-Frame Position of camping profile support regarding sub-frame ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) ITC-177A-I Pág 5 de 11 Edición nº 1 Once you submitted the clamping profile of the track, remove it in order to install the upper track in the wide, after mounting the liners and the upper track in the width the clamping profile of the track will be install it again. 3. . Lower track installation Screwed on the ground, at the height of ground level if it isn’t finished, the lower track, located at the position indicated by the manufacturer regarding the sub-frame (see diagram of the lower track position regarding the sub-frame). Assembly of lower track Lower track position regarding the frame The lower track must be placed on the opposite side to the U-lock of the sliding door. Used 6x30 nylon studs with screws of 4.2 x38. ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) ITC-177A-I Pág 6 de 11 Edición nº 1 4. Lining installation to the frame Insert tips of the inside lining on the outside lining of heights then repeat the operation with it in the width linings. Joining Machine Outside linning Inside linning Nylon mallet Linning Installation Use a joining machine to join the lining, and finally, fold the tips on the inside lining above the outside lining with a nylon mallet. 5. Upper track Installation Rememberthat in order to screw the upper track, previously you must remove the clamping profile of the track. The upper track is mounted on the side where the track is and it is screwed onto the outside lining width with four screws of 4.2 x13. ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) ITC-177A-I Pág 7 de 11 Edición nº 1 Screw 4,2x13 Upper track installation Now you can permanently install the clamping profile of the track. Clampling Profile support definitive installation 6. U-lock base installation U-lock base is mounted above the sub frame linning in the U-lock side of the door (see pictures). U-Lock base ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) Screw M6x15 ITC-177A-I Pág 8 de 11 Edición nº 1 Tighten the top screw Hole below the screw of this pair (screw only presented) It screws with four pairs of Allen screws M6x15, 8 screws in total. The screws on the top of each pair are heavily tightened, while the bottom screws of each pair only have to submit for final tightening after mounting the U-lock(next step). 7. U-lock installation The U-Lock is mounted on the base of theU-lock, fitting it over the heads of the allen screws M6x15. Then slide the latch down and tighten the 4 screws in the previous step, and thus the U-lock is fixed. U-Lock Fit the U-lock over the heads of the allen screws, slide down and tighten the screws down pairs ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) ITC-177A-I Pág 9 de 11 Edición nº 1 8. Installation of the strike in U-lock The strike of the U-lock is mounted on the U-Lock, fitting from the upper part till the lower part, taking into account the position of the locker housing. U-lock locker Fit the U-lock locker, from up till down U-lock 9. Track installation From step number 5 of these instructions, you can mount the track. For a proper placement, the cap opening, comprising a M6 screw attached to onepart of the track has to be on the side of opening. End Stop track Camping Profile support ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) ITC-177A-I Pág 10 de 11 Edición nº 1 Screw the track on the clamping profile support of the track, leaving it in level. Position the track on the clamping profile support of the track holding the benchmarks of the figure. When leaf has been hang the track can be reset. 10. Door Leaf installation First of all the ball bearing hanger has to be installed into the track. Then fit the door leaf on the lower track. Next, fit the screws on the door leaf to the ball bearing hanger and tighten. Finally, check that the door and the lock, open and close properly. If not, it is indicative that the door needs to regulation by the securing screws to the ball bearing hanger. Sliding door leaf Lower Track Set screw of the leaf Ball bearing hanger ITC-177A-I Pág 11 de 11 Edición nº 1 ASSEMBLY INSTRUCTIONS Office Slide ( With Subframe) 11. Track cover The track cover is intalled on the clamping profile support of the track, fixing with screws of 4.2 x13. Track cover Screw of 4,2 x 13 If you have been followed all the instructions, door should be fully assembled. Door Detail