Meeting Summary Report
Public Meeting
Summary Report
I-10 Collector-Distributor Project
From SH 20 (Mesa Street)
to Executive Center Boulevard
El Paso County
CSJ: 2121-02-0137
Public Meeting
June 5, 2012
6:00 p.m. to 8:00 p.m.
City of El Paso
West Side Police Command Center Community Room
4801 Osborne Dr.
El Paso, Texas 79922
TABLE OF CONTENTS
PUBLIC MEETING SUMMARY.......................................................................................2
PUBLICATIONS...............................................................................................................10
EXHIBITS PRESENTED DURING PUBLIC MEETING...............................................21
SIGN-IN SHEETS .............................................................................................................34
PHOTOGRAPHS ..............................................................................................................43
WRITTEN COMMENTS..................................................................................................48
Page 1 of 63
I-10 Collector-Distributor Project
Public Meeting Summary
Meeting Date:
June 5, 2012
Meeting Location:
City of El Paso
West Side Police Command Center Community Room
4801 Osborne Dr.
El Paso, Texas 79922
Meeting Purpose: The purpose of the meeting was to provide information about the
proposed project and gather input from the public.
The proposed I-10 project is the construction of Collector-Distributor (C-D) lanes and
improvements to the interchange at US 85. The proposed total project length is
approximately 5.75 miles between SH 20 (Mesa Street) and Executive Center Boulevard.
These improvements will minimize weaving movements and increase safety on the I-10
main lanes and interchanges. The C-D lanes will be constructed to the outside edge of
the existing main lanes in both east and west directions connecting three interchanges.
The existing direct connector at Resler Drive and the direct connector at Sunland Park
Drive will be replaced with improved connectors. Minor improvements are also proposed
for the existing interchange at SH 20 (Mesa Street), Sunland Park Drive and Executive
Center Boulevard. Most of the proposed improvements will be completed within the
existing right-of-way; however, approximately 2 acres of additional right-of-way will be
required for the project in commercial and undeveloped areas with no displacement of
residences or commercial structures.
The public meeting allowed the public and stakeholders to review the proposed
improvements and project exhibits and ask questions to project staff regarding the
proposed improvements, alternatives considered and project implementation time-line.
They were provided an opportunity to make written comments at the meeting, mail or
email them in later within a 10 day period after the public meeting.
Meeting Format:
6:00 pm to 8:00 pm – Open house format for public
viewing of the exhibits
Public Meeting Notices:
Public Meeting notices in both English and Spanish were
mailed out to 143 adjacent property owners. Public
meeting notices were also mailed out to 25 local
elected/public offices. Meeting notices were published in
the El Paso Times and in Spanish in the El Diario
newspapers.
Page 2 of 63
Attendance:
Citizens – 35
Public Officials – 1
TxDOT Personnel – 8
KBR Personnel – 4
Blanton & Associates Inc. Personnel – 2
HNTB Personnel - 4
Dannenbaum Engineering Personnel – 1
Media - 3
Publications:
The public meeting notices were published in the local
newspapers twice, 10 days and 30 days prior to the meeting
data as required by public involvement guidelines. The
notices were published in the following newspapers on the
dates indicated:
The El Paso Times – May 6, 2012 and May 27, 2012
El Diario de El Paso – May 6, 2012 and May 27, 2012
Meeting Summary:
The public meeting allowed people to review, make
comments and ask questions to project staff regarding the
proposed improvements, alternatives, and project
implementation time-line.
Page 3 of 63
Public Comments and Responses to Comments
Public comment forms were distributed at the public meeting and may have been filled
out and left in the comments box at the meeting site. The public was also given the
opportunity to mail-in the comment form or email comments within a 10 day comment
period ending June 15, 2012. The following are the comments received at the public
meeting and from concerned parties during the comment period. Responses follow each
of the written comments received.
The following 9 written comments were received:
1. Comment from Javier Narrarro:
Great and much needed project, here is my 2 cents:
1. Connection from Resler to I-10 North (or the new frontage road). If you build it,
people will use it; it would take some traffic off Sunland and/or Mesa going to I10 North.
2. There is a lot of traffic exiting now going I-10 East into Executive (Center
Blvd.). Why removing the off-ramp and have people stop at future Mesa Park?
Just redo the off-ramp between these 2 exits under new design standards.
3. People coming from Executive (Center Blvd.) and traveling I-10 West will have
to make an unnecessary stop at future Mesa Park, I know you want to limit the
freeway entrances, but a new on-ramp with plenty of merging distance would be
ok.
Thanks for your time.
Comment Response:
The addition of a connection from Resler Dr. to westbound I-10 was reviewed by the
study team and the value engineering committee. Traffic projections of this
connection do not warrant the addition of a connection from Resler Dr. to westbound
I-10.
Ramp adjustment is considered in order to distribute traffic to and from Mesa Park
and Executive Center Blvd.
2. Comment from Kevin von Finger:
The following are comments regarding I-10 Collector-Distributor Lanes Project, to
be addressed in the NEPA analysis and document. These comments are submitted on
behalf of Keystone Heritage Park, Inc., a non-profit organization that manages the
Keystone Heritage Park wetlands, jurisdictional wetlands located in the project area
adjacent to Doniphan Drive and the Keystone dam. Kindly acknowledge receipt of
these comments via an email response to sender's email address.
Page 4 of 63
These wetlands are one of the few, possible the only remaining non-riverine
associated wetlands in the El Paso, Texas area. The water source is primarily
mountain-derived subterranean flow from east to west which follows the path of
Resler Canyon and passes underneath I-10 and the Resler on ramp. Our concern is
that any excavation into the water bearing substrate, in particular excavation for
bridging support pillars etc., could alter or eliminate this flow. In addition, such
activity could require dewatering, which would also impact the wetland. This could
eliminate the wetlands and the ecological functions they provide, and would
constitute a significant impact as defined by 40 CFR 1500-1508 NEPA implementing
regulations.
Request that TXDOT and the NEPA document consider the alternative of spanning
the canyon with a bridge that is supported on existing land surfaces rather than
pillars inserted into Resler Canyon or the dam. Note that several Federal agencies
have either a regulatory or a financial interest in the subject wetland: The
International Boundary and Water Commission (IBWC) has invested considerable inhouse funds to enhance restoration of the Keystone wetlands to satisfy mitigation
required by the Army Corps of Engineers as part of the Corps permitting process
allowing the IBWC to rehabilitate and improve their flood control levees in the El
Paso area; and the Environmental Protection Agency is planning to fund restoration
of a portion of the Keystone wetlands impacted by previous construction. Any impact
to the water source(s) of the wetlands would impact these agencies' investments in the
wetlands.
Thank You
Kevin von Finger, member Board of Directors and Habitat Committee Chairman,
Keystone Heritage Park, Inc.
Comment Response:
The project would in general match existing structures when new structures are
added. The proposed project plan would generally match existing spans. The project
will be designed to avoid or minimize any potential impacts to Resler Canyon.
3. Comment from Judith Franco:
Very concerned of something which was not addressed today. There is a large
commercial development off Resler as I understand that traffic is going to go from
Resler to Ramcom after viewing your map there is 1 BK (block) on Mesa that I
believe will be extremely congested w/2 traffic light.
We need an entrance to west from Resler. Please contact me of what your comments
are as I am in the Sandcastle Subdivision and report to my neighbor.
Thank You
Page 5 of 63
Comment Response:
The addition of a connection from Resler Dr. to westbound I-10 was reviewed by the
study team and the value engineering committee. Traffic projections of this
connection do not warrant the addition of a connection from Resler Dr. to westbound
I-10.
4. Comment from No Name:
They need to look into state line near Paisano before Executive (Center) Drive. The
NM state line moves close to the roadway and land could be a problem for
construction.
Comment Response:
The project has been surveyed and is completely within the state of Texas.
5. Comment from Ernest Mijeves III:
El Paso needs to go forward, anything I can do to make El Paso better, let’s do it.
El Paso can achieve greatness.
Comment Response:
Comment noted.
6. Comment from James Chun:
Thank you for your good explanation about this project. We need this project ASAP.
Comment Response:
Comment noted.
7. Comment from J. Miller:
Good idea lane from Sunland Park to Resler without having to enter I-10.
Comment Response:
Comment noted.
Page 6 of 63
8. Comment from Estela Miller:
No comment yet.
Comment Response:
Comment noted.
9. Comment from Harriet Jane Holt:
I own property at 338 E. Sunset adjacent to Interstate 10 and the Mesa Street on
ramp going east.
The building is occupied at the present time by A.L.S. Locksmith a division of APCO
Building Specialties Co. Inc. The property and building is shown on your planning
map of the area.
I’ve reviewed the recent map released by your office for the extension of new access
roads between Mesa and Sunland Park.
We are requesting that in your planning and construction of the new access roads
that our property be afforded two curb cuts (one into and one exit), from the access
road.
Our long term planning for this property includes an expansion of the use that will
necessitate substantial increase in traffic to and from the area. We believe that this is
important safety issue and that access to and from the access road will safely enhance
the flow of traffic.
Previous issues of the Tex-DOT plans for this area showed Sunset Drive with direct
connection to the access road. However it appears from the new study that this will
not be the case, and thusly making it ever more important that the curb cuts we need
are provided.
It is our belief that with all the upper valley / country club / Santa Teresa area having
traditionally used the Mesa Street access to the freeway that the additional access
from Sunset Drive to the freeway would relieve the congested traffic. With the
continued expansion of Santa Teresa and The University of Phoenix it seems all the
more important to have more than one access to the freeway from the valley area.
Thank you very much for your thoughtful consideration and wishing you good health,
happiness and success.
Page 7 of 63
Comment Response:
Property owner access requests will be considered by TxDOT-El Paso District’s
Access Management Group. Generally, the proximity of this location to the
intersection at SH 20 (Mesa St.) and the proposed entrance ramp to I-10 it is not
anticipated that access would be granted to the frontage road at this location.
Public Commenters indicated on the comment form question “I heard of this
meeting through:”
• Newspaper (1)
• Told by a Friend or Neighbor (1)
• Received Notice in Mail (3)
• Other or not stated (4)
Page 8 of 63
Public Meeting Attendants
Texas Department of Transportation
J. Eduardo Calvo
Jesus Heredia
Noemi L. Horn
Blanca Serrano-Rivera
Manuel Hernandez
Martha Alejandrina Boyd
Blanca Del Valle
Aracely Olmos
Kellogg Brown & Root
Abraham Abugattas
Steven Gee
Javier Murillo
Jeffrey Wellman
Blanton & Associates Inc.
Jasmine Gardner
Kim Jenkins-Johnson
HNTB
Darrin Willer
Elizabeth Story
Dionicio (Don) Flores
Jack Chapman
Dannenbaum Engineering
Rossey Cardenas
Page 9 of 63
PUBLICATIONS
Page 10 of 63
Page 11 of 63
Page 12 of 63
Page 13 of 63
Page 14 of 63
PUBLIC MEETING NOTICE
New I-10 Collector-Distributor Lanes Project
From SH 20 (Mesa St.) to Executive Center Blvd.
El Paso County, Texas
The Texas Department of Transportation (TxDOT), El Paso District, will conduct a Public Meeting for the
proposed I-10 improvement project on:
Tuesday, June 5, 2012
6:00 p.m. to 8:00 p.m.
City of El Paso Police Department
West Side Regional Command Center Community Room
4801 Osborne Dr., El Paso, Texas 79922
The Public Meeting will be conducted in an open house format. Those wishing to attend are encouraged to do
so at their convenience between the hours of 6:00 p.m. and 8:00 p.m. Maps of the project area and other
displays will be available for review and comment. TxDOT staff will be available to answer questions. All
material will be presented in English and Spanish. No formal presentation will be given. Parking will be
available on the street and in nearby parking lots.
The purpose of the meeting is to provide information about the proposed project and gather input from the
public.
N
The proposed I-10 project is the construction of
Collector-Distributor
(C-D)
lanes
and
improvements to the interchange at US 85. The
proposed total project length is approximately 5.75
miles between SH 20 (Mesa Street) and Executive
Center Boulevard. These improvements will
minimize weaving movements and increase safety
on the I-10 main lanes and interchanges. The I-10
C-D lanes will be constructed to the outside edge
of the existing main lanes in both east and west
directions connecting three interchanges. The
existing direct connector at Resler Drive and the
direct connector at Sunland Park Drive will be
replaced with improved connectors. Improvements
are also proposed for the existing interchange at
SH 20 (Mesa Street), Sunland Park Drive and
Executive Center Boulevard. Most of the proposed
improvements will be completed within the existing
right-of-way; however, approximately 2 acres of additional right-of-way will be required for the project in
commercial and undeveloped areas with no displacement of residences or commercial structures.
Persons interested in attending the Public Meeting that have special communication or accommodation needs
are encouraged to contact the TxDOT El Paso District Public Information Officer, Blanca Del Valle, at (915)
790-4200 at least two working days prior to the meeting. TxDOT will make all reasonable efforts to
accommodate other special needs as requested.
Written comments from the public regarding this project are encouraged. Comments may be presented either
at the Public Meeting or in writing within 10 days after the meeting. Written comments may be mailed to the
following address: SLI Engineering, Inc.; Attn: I-10 C-D Project Coordinator, 6600 Westwind Drive
El Paso, Texas 79912.
Comments must be hand delivered or post marked on or before Friday, June 15, 2012 to be included as part
of the public record. If you have any questions or would like to discuss the project in more detail, please
contact Mr. Eduardo Calvo, TxDOT Project Manager at (915) 790-4200.
Page 15 of 63
AVISO DE REUNIÓN PÚBLICA
Construcción de Nuevos Carriles Colectores de Distribución en la I-10
Desde SH 20 (Calle Mesa) hasta el Bulevar Executive Center
Condado de El Paso, Texas
El Departamento de Transporte de Texas (TxDOT, por sus siglas en inglés), Distrito de El Paso, invita a una
reunión pública para presentar las mejores propuestas en la autopista interestatal I-10 entre las calles
principales de Mesa y Executive Center:
El día martes 5 de Junio de 2012
Entre las 6:00 y 8:00 de la tarde
En el West Side Regional Command Center Community Room
4801 Osborne Dr., El Paso, Texas 79922
La reunión pública se llevará acabo en un formato de sesión informal y abierta y están invitadas todas las
personas que deseen atender durante las horas de 6:00 p.m. y 8:00 p.m. Información sobre las mejoras
propuestas incluyendo mapas del proyecto estarán disponibles (en ingles y en español) para familiarizarse
con el proyecto y ofrecer comentarios o hacer preguntas. Representantes de TxDOT estarán presentes en la
reunión para contestar preguntas y recibir comentarios.
No habrá presentación formal.
Habrá
estacionamiento gratuito en las calles adyacentes y estacionamientos cercanos.
El propósito de esta reunión es de presentar información sobre el proyecto y recibir comentarios y opiniones
del público. El proyecto contempla la construcción de carriles colectores de distribución en la autopista
interestatal I-10 y, al mismo tiempo, mejorar su
intersección con la autopista US 85. La longitud total
N del proyecto es 5.75 millas entre SH 20 (Calle Mesa) y
el Bulevar Executive Center. Los trabajos previstos
mejorarán el tráfico y la seguridad de la autopista e
intercambios existentes. Los carriles colectores de
distribución se construirán en el borde exterior de los
carriles existentes en ambas direcciones conectando
tres intersecciones. Los conectores existentes en
Resler Dr. y Sunland Park Dr. serán remplazados con
conectores mejorados.
También se proponen
mejoras a las intersecciones existentes de I-10 con
SH 20 (Calle Mesa), Sunland Park Dr. y el Bulevar
Executive Center.
La mayoría de las mejoras
propuestas serán realizadas dentro del Derecho de
Vía existente. Sin embargo, habrá necesidad de
adquirir dos acres adicionales de Derecho de Vía en
áreas comerciales no desarrolladas sin afectar o
desplazar residencias o edificios comerciales existentes.
Las personas interesadas en asistir a la reunión pública que tengan necesidades de comunicación ó
alojamiento deberán comunicarse con la Directora de Información Pública de TxDOT, Blanca Del Valle, al
teléfono (915) 790-4200 por lo menos dos días hábiles de anticipación a la reunión. TxDOT hará todo
esfuerzo razonable para cubrir otras necesidades según se presenten.
Se solicitan comentarios por escrito del público respecto a este proyecto. Sus comentarios pueden ser
presentados durante la Reunión Pública ó por escrito dentro de diez días posteriores a la reunión.
Comentarios por escrito deberán ser enviados por correo postal a la siguiente dirección: SLI Engineering,
Inc.; Attn: I-10 C-D Project Coordinator, 6600 Westwind Drive, El Paso, Texas 79912.
Para ser incluidos en el registro público, todos los comentarios deberán ser entregados en persona ó estar
fechados por las oficinas de correo postal a más tardar el viernes 15 de junio de 2012. Si tiene alguna
pregunta sobre el proyecto ó si le gustaría discutir el proyecto en más detalle, por favor contacte al Sr.
Eduardo Calvo, Gerente del Proyecto, al teléfono (915) 790-4200.
Page 16 of 63
 *>ĝ /ˆ“iÄ
-֘`>ß] >ß É] Ôå¤Ô
i¬>ĝ͈“iıV“
¤å
7i>ͅiÁ
/" ",
-/
x‡9 ",
-/
/"9
" 9
ˆ nÈ
 ÉÔ
ˆ nn
 ÉÉ
7 -9
ˆ ÈÈ
 xÈ
ÄÍß Ä֘˜ß
Ü}± …Ö“ˆ`ˆÍß\ ¤x°
*>Á͈>
Ä֘ąˆ˜i
Ü}±
…Ö“ˆ`ˆÍß\
Ôå°
/1-9
͇Ä͝Á“
¬ÄĈLi
Ü}±
…Ö“ˆ`ˆÍß\
{å°
/1,-9
͇Ä͝Á“
¬ÄĈLi
Ü}±
…Ö“ˆ`ˆÍß\
Ôx°
ˆ nÔ
 xÈ
͇Ä͝Á“
¬ÄĈLi
Ü}±
…Ö“ˆ`ˆÍß\
Ïå°
ˆ nÔ
 ɤ
…iVŽ ÖÍ x‡`>ß ÖÁÁi˜Í V˜`ˆÍˆ˜Ä
->ÍiˆÍi ˆ“>}iÄ ˆ}…Í `i>ßÄ vÁ“
˜ÍiÁ˜>͈˜> ˆÁ¬ÁÍ
*-" ,
*ÁiVˆ¬ˆÍ>͈˜
ÁiV>ÄÍÄ >˜` }Á>¬…ˆVÄ ¬ÁÜˆ`i` Lß VVÖ7i>ͅiÁ] ˜V± ^Ôå¤Ô
Ô{ …Áı ͅÁÖ}… É ¬±“± ->ÍÖÁ`>ß ±±±±±±±±±±±±±±
9i>Á ͝ `>Íi ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
ÜiÁ>}i ßi>Á ͝ `>Íi±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
ÜiÁ>}i >ß Í `>Íi ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
/Í> >ß Í `>Íi ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
/i“¬iÁ>ÍÖÁiÄ vÁ >ß x
, +1/9 8
"<" ˜ÜˆÄˆLi] ˆÁÁˆÍ>ÍiÄ
E ˆ“¬>ˆÁÄ LÁi>ͅˆ˜}
å
xå
¤åå
¤xå
Ôåå
" ˜ÜˆÄˆLi] Ái`ÖViÄ
L` Þß}i˜
*¤å ®¤å “ˆVÁ˜ ¬>Á‡
͈V֏>Íiį
܈ĈLi] V>˜ `}i `ii¬ ˆ˜ ͅi
Ö˜}Ä] Ái`ÖViÄ ÜˆÄˆLˆˆÍß
/`>ß¾Ä ÁiV>ÄÍ\ `
*ÖÍ>˜Í\ "㝘i
-ÖÁVi\ /iÞ>Ä ““ˆÄĈ˜ ˜ ˜ÜˆÁ“i˜Í> +Ö>ˆÍß
16 8
ˆ}…iÁ ֏ÍÁ>܈iÍ ˆ˜`iÞ ˜Ö“LiÁÄ ˆ˜`ˆV>Íi }Ái>ÍiÁ ißi
>˜` ψ˜ iÞ¬ÄÖÁi ͝ 16 ˆ}…ͱ ,iviV͈˜ vv Ý>ÍiÁ Á
ĘÝ V>˜ “>}˜ˆvß 16 V˜Vi˜ÍÁ>͈˜±
¤Ô
¤¤
¤å
¤¤
š
n
É
{
/"9¾- ," ",
-/
->ÍÖÁ`>ß
ˆÍß
ˆ}… ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± nš
Á“> …ˆ}… ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± n{
,iVÁ` …ˆ}… ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± šn ˆ˜ ¤š{È
Ý ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± ÉÉ
Á“> Ý ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± xÈ
,iVÁ` Ý ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± Ϛ ˆ˜ ¤šÏx
9iÄÍiÁ`>ß¾Ä 6>Öi\ {Ô
," /-
å±åå¼
å±nx¼
¤±{Ô¼
å±åɼ
å±åå¼
{
Ô
Ô
ˆÊ *Ái¬±
Lˆi˜i
>“}Á`
LÖ¶ÖiÁ¶Öi
“>Áˆ
ÖÄ͈˜
ÁÝ˜Ä܈i
>ÁÄL>`
…ˆ…Ö>…Ö>
Ö`VÁvÍ
ÜˆÄ
Á¬ÖÄ …ÁˆÄ͈
>>Ä
i“ˆ˜}
>Á“ˆ˜}͝˜
>Ö¬
LLÄ
ÖÄ͝˜
Ä >“Ä
>Ä ÁÖViÄ
>Ä 6i}>Ä] ÖLLVŽ
>Áv>
ˆ`>˜`
*ÁiĈ`ˆ
,ÄÝi
,ֈ`Ä
¤ååÊÈÔ
nÉÊx{
n{Êx{
šÈÊx{
šxÊȤ
š{ÊÈÈ
šÉÊxn
šåÊxš
ɚÊÏÈ
š¤ÊxÈ
š¤ÊÈÉ
šÔÊÉÈ /Á
nÈÊ{È
nåÊ{¤
ÈnÊÏÏ
šÏÊxx
š¤ÊÈå
ÈÏÊxx
nÉÊxx
nÏÊ{È
ššÊÉx
n{ÊxÔ
ššÊɚ
šÈÊxÈ
šÈÊxÔ
ÈxÊx{
/`>ß
ˆÊ
7I
šÔÊÉx
š¤Êɤ
n¤Êxx
nåÊxå
šÔÊÈå
šÏÊÈÏ
ššÊÉÏ
nxÊxÈ
ÉnÊϚ
ȚÊ{n
nÉÊÈÏ
šÔÊÈÔ
nnÊxÈ
ÈÈÊ{É
ÈÏÊ{¤
šxÊxÉ
nnÊȤ
ÈÏÊ{x
nšÊÉÏ
ÈÔÊ{Ô
š¤ÊxÉ
nÉÊxÔ
šÉÊÉÏ
šxÊɤ
šÉÊÉå
ÈxÊxÔ
Í
Ä
Ä
¬V
¬V
¬V
Ä
Ä
Ä
Ä
¬V
¬V
Ä
¬V
¬V
Ä
¬V
Ä
Ä
Í
Ä
Ä
Ä
Ä
Ä
Ä
,>͝˜
"Ž>…“> ˆÍß
ÈÔÊ{{
nÈÊÉx
“>Áˆ
LÖ¶ÖiÁ¶Öi
nåÊxå
n¤Êxx
ÜˆÄ
ÖLLVŽ
ȚÊ{n
š¤ÊxÉ
>Ä ÁÖViÄ
7ˆV…ˆÍ> >Ä
nšÊÉÏ
š{ÊÉÉ
>ÁÄL>`
 *>ĝ
>>Ä
ššÊÉÏ
ˆ`>˜`
Ö?Áiã
šÔÊÈÔ
šÉÊÉÏ
šåÊÉÏ
ÖÄ͈˜
šÔÊÈå
ÖÄ͝˜
*ÁiĈ`ˆ
nnÊȤ
šxÊɤ
->˜ ˜Í˜ˆ
šÏÊȤ
->˜Í> i
ÈnÊ{È
Á¬ÖÄ …ÁˆÄ͈
nÉÊÈÏ
…ˆ…Ö>…Ö>
nxÊxÈ
ÁÝ˜Ä܈i
šÏÊÈÏ
->ÍÖÁ`>ß
ˆÍß
->˜ ˜Í˜ˆ
->˜Í> i
-ˆÜiÁ ˆÍß
/ÁÖͅ Á ˜Ä±
ˆÊ
šÉÊÈÏ
nÔÊ{¤
n¤Ê{É
nÈÊxÉ
/`>ß
*Ái¬±
ˆÊ
šÏÊȤ
ÈnÊ{È
n{ÊxÏ
nÉÊɤ
7I
¬V
Ä
Ä
Ä
å
-/1,9¾- 8/,-
å‡Ô] ÝÇ Ï‡x] `iÁ>ÍiÇ É‡È] ˆ}…Ç n‡¤å] 6iÁß ˆ}…Ç ¤¤´]
ÞÍÁi“i
>͈˜> …ˆ}…\ ¤åÈ >Í 6iÁ˜˜] /iÞ>Ä
>͈˜> Ý\ ¤È >Í `ˆi -Í>Íi *>ÁŽ] >ˆv±
/iÞ>Ä …ˆ}…\ ¤åÈ >Í 6iÁ˜˜
/iÞ>Ä Ý\ {n >Í >…>ÁÍ
˜ÍiÁ˜iÍ\ i¬>±}ÜÊÄ݈֘Äi
7
7/, /`>ß ˆÄ -֘`>ß±  *>ĝ ÁiĈ`i˜ÍÄ ÝˆÍ… ``‡˜Ö“LiÁi`
>``ÁiÄÄiÄ >Ái ¬iÁ“ˆÍÍi` ͝ Ý>ÍiÁ± 7>ÍiÁˆ˜} …ÖÁÄ >Ái
LivÁi ¤å >±“± >˜` vÁ“ É ¬±“± ͝ “ˆ`˜ˆ}…ͱ /…iÁi ˆÄ ˜
Ý>ÍiÁˆ˜} LiÍÝii˜ ¤å >±“± >˜` É ¬±“± ,iĈ`i˜ÍÄ “ÖÄÍ Ý>ÍiÁ
˜ `iĈ}˜>Íi` `>ßı "`` >``ÁiÄÄiÄ\ 7i`˜iÄ`>ß] Áˆ`>ß >˜`
-֘`>ß± Üi˜ >``ÁiÄÄiÄ\ /ÖiÄ`>ß] /…ÖÁÄ`>ß >˜` ->ÍÖÁ`>ß±
/…iÁi ˆÄ ˜ ÁiĈ`i˜Íˆ> Ý>ÍiÁˆ˜} ˜ ˜`>ßı
*"
6iÁß Ý
Ý
x¤‡¤xå
6iÁß …ˆ}…
ˆ}…
¤x¤‡nåå
n备¤nåå
-ÖÁVi\ Á± ߘ`˜ >˜Ävˆi`
¤n头
ˆÍß
V>¬ÖV
“ÄÍiÁ`>“
ͅi˜Ä
>}…`>`
>˜}ŽŽ
iˆˆ˜}
iÁˆ˜
}Í>
ÁÖÄÄiÄ
Öi˜Ä ˆÁiÄ
>ˆÁ
ˆ
šå
xx
n{
šÈ
šÔ
nÉ
xÉ
É{
xÔ
Èå
šÏ
/`>ß

Èx
Ïn
ÉÏ
Èå
Èn
xš
{Ï
{š
Ïn
xš
Éx
7I
Ä
¬V
Ä
¬V
Í
Ä
V
Í
V
¬V
Ä
ˆÍß
>˜V֘
¬i˜…>}i˜
ÖLˆ˜
Á>˜ŽvÖÁÍ
i˜iÜ>
>Ü>˜>
˜} ˜}
iÁÖÄ>i“
>L֏
˜`˜
>`Áˆ`
ˆ
nš
x{
xå
ÉÔ
ÉÔ
nx
n{
Èn
Èn
xå
ÉÉ
/`>ß

ÈÏ
{¤
{å
{{
{Ï
ÉÈ
ÈÈ
xÈ
x{
{¤
{n
iÝ iވV
ˆLiÁÍ>Áˆ>˜Ä ¬ˆVŽ …˜Ä˜ vÁ ¬ÁiĈ`i˜Íˆ> Lˆ`
ß ÁˆÄ͈˜> -ˆÜ>
00$
2 -/00
0 90b !nì½ u ¨ÏnÏ
!ní nîŽ[¨ ¨ì½ AÏï ¨‹¢
Ó¨¢ ŽÓ [A·AŽ‚¢Ž¢‚ ݨ 펢 ݋n
:‹ŽÝn ¨æÓn AÓ A ŽQnÏÝAώA¢
A{ÝnÏ Ïn[nŽìŽ¢‚ Ó[A¢Ý AÝÝn¢ÝŽ¨¢
Ž¢ ݋n $- ·Ïnӎen¢ÝŽA— ÏA[n½
¨‹¢Ó¨¢ nAӎ—ï Qn[An ݋n
É\¤x >±“±
-֘ÄiÍ
È\{š ¬±“±
ˆ
{È
nn
Éx
nÔ
šå
Ȥ
nš
Èå
xx
xn
ÉÏ
ɤ
ÈÉ
nÈ
ÈÈ
Éå
Ț
ÉÈ
nÈ
Ȥ
nš
n{
nÈ
ÈÔ
xx
ÈÏ
ɚ
ÈÈ
ÉÏ
ɤ
nå
n{
šå
n¤
šÔ
{n
{x
nn
n¤
Én
n{
š¤
È{
nÏ
šå
n{
xx
Éå
šå
šå
ÉÉ
nÔ
šÔ
š¤
š¤
ɚ
š{
nå
xÈ
ÉÔ
n{
ÉÈ
ÉÏ
nx
Ț
šÏ
xn
ÉÈ
ɚ
ÈÈ
šx
xÉ
šå
xx
nš
ɚ
nn
nš
š{
šå
nÏ
nš
šx
->ͱ

ÏÏ
Én
xÈ
Éå
ÈÔ
{x
Éx
{È
ÏÉ
{n
xå
{x
ÉÏ
ɤ
{n
x{
É{
xÉ
xÏ
{š
Éx
{š
ɚ
xÈ
Ϥ
{È
Ïx
{š
x¤
{È
xš
Èå
É{
ÉÔ
Ȥ
Ï{
Ϛ
ÉÉ
ÉÈ
{n
ÉÏ
Ȥ
xx
Éx
ÈÏ
ÈÏ
{È
x{
Éx
ÈÏ
xÉ
ÉÈ
ÉÏ
ÈÏ
Éx
ÉÏ
Én
ÉÔ
{Ï
x¤
É{
xÔ
ÏÉ
Éx
x¤
Ȥ
{x
Éå
{È
{È
Èå
{¤
Ȥ
Ï{
É{
xÔ
ÈÔ
Én
Éå
ÉÈ
É{
Én
ÉÉ
7I
¬V
¬V
V
ą
¬V
ą
¬V
ą
¬V
V
¬V
¬V
Í
¬V
Á
V
¬V
¬V
¬V
V
Ä
¬V
¬V
¬V
¬V
¬V
Ä
Ä
ą
¬V
¬V
¬V
Í
¬V
¬V
V
Á
¬V
¬V
V
Ä
¬V
¬V
¬V
V
Ä
V
Í
Í
Á
V
¬V
Ä
¬V
Ä
V
¬V
¬V
¬V
V
Í
Í
¬V
Í
Ä
¬V
¬V
¬V
Ä
Ä
¬V
¬V
¬V
¬V
¬V
¬V
Ä
¬V
Ä
¬V
ą
¬V
Ä
ˆ
xÏ
nn
ÉÉ
ÈÔ
nn
Éå
šå
Én
ÉÏ
É{
Én
ÉÈ
nÉ
nÔ
Éå
Èå
nÏ
ÈÔ
xš
ɚ
šå
É{
n{
Èå
xÉ
Én
Éx
n{
È{
ÉÔ
ÈÔ
nx
šÔ
nÔ
šå
xå
{š
n{
nn
Èå
n¤
š¤
ÈÏ
nÈ
šå
nn
ÉÉ
ÈÔ
šå
nÉ
Èå
Én
nÈ
nÔ
šå
Ȥ
šÏ
ÈÉ
Ȥ
ɚ
Èx
ÉÉ
ɚ
ÈÔ
nx
š¤
ɤ
Én
È{
ÈÈ
nÈ
ÉÉ
nn
Éå
nn
ɚ
nÉ
nÏ
šÔ
nÉ
È{
n{
šx
/`>ß

{¤
Éx
{È
xÔ
ɚ
Ïn
ÉÈ
{{
{Ï
{È
{x
Ïx
Éå
xš
ÏÈ
xÏ
ÉÔ
xå
ÏÉ
ÏÏ
Én
Ϛ
xš
{š
Ïx
{{
ÏÉ
xÈ
xÔ
{n
xx
ÈÔ
ÉÈ
Éx
ÉÈ
ÔÉ
Ϛ
ÉÔ
Éx
{š
É{
Én
xš
Éx
Ȥ
ÈÔ
x¤
xÏ
Én
Én
xÔ
xÈ
Éx
xÏ
ÉÉ
x{
ÉÉ
x{
{x
{É
xn
ÏÈ
{Ï
xÉ
{š
Èå
{Ô
ɤ
xå
xÔ
ÉÈ
{{
ɚ
Ϛ
ÉÈ
{¤
Ȥ
Éå
Éå
Én
xÈ
xÈ
ÉÉ
7I
ą
Í
¬V
¬V
¬V
¬V
¬V
¬V
Ä
¬V
¬V
¬V
¬V
¬V
V
V
¬V
¬V
¬V
¬V
Í
V
Í
¬V
V
Á
¬V
Ä
¬V
V
¬V
Ä
¬V
¬V
¬V
¬V
Á
Í
¬V
¬V
Ä
¬V
¬V
¬V
¬V
¬V
V
Á
¬V
¬V
¬V
¬V
Í
Í
Í
¬V
Ä
¬V
¬V
¬V
¬V
¬V
Ä
¬V
Ä
Í
¬V
¬V
Ä
Ä
Í
¬V
¬V
¬V
¬V
¬V
¬V
Í
Ä
Í
¬V
Í
Ä
7",
"1 /
`iÁ>Íi
å‡xå
-֘ÁˆÄi
>͈˜> iÞÍÁi“iÄ >Ái vÁ ͅi {n V˜Íˆ}֝ÖÄ ÄÍ>Íiı
->ÍÖÁ`>ß¾Ä ¬i˜ Ái>`ˆ˜} vÁ  *>ĝ Ö˜Íß\ ¤{å
>ˆ˜ ¬i˜Ä\ ÍÁiiÄ] }Á>ÄÄiÄ] Ýii`Ä] “`ı
-1 ,-Ê-1 -/
iÝ iވV …ˆ}…\ šÈ >Í ,ÄÝi
iÝ iވV Ý\ ÔÈ >Í ˜}i ˆÁi
ˆÍß
˜V…Á>}i
͏>˜Í>
͏>˜ÍˆV ˆÍß
>Íˆ“Ái
>͝˜ ,Ö}i
ˆˆ˜}Ä
ˆÁ“ˆ˜}…>“
ˆÄ“>ÁVŽ
ˆÄi
Ä͝˜
Övv>
ÖÁˆ˜}͝˜] 6/
…>ÁÄ͝˜] 76
…>ÁÍÍi
…ißi˜˜i
…ˆV>}
ˆ˜Vˆ˜˜>͈
iÜi>˜`
Á>` -¬Á˜}Ä
˜VÁ`] >ß͝˜> i>V…
i˜ÜiÁ
iÄ ˆ˜iÄ
iÍÁˆÍ
>ˆÁL>˜ŽÄ
>Á}
>}ÄÍ>vv
Áiʝ
Á>˜` ,>¬ˆ`Ä
Áii˜ >ß
>ÁÁˆÄLÖÁ}
˜ÖÖ
֘ÍÄ܈i] ˜`ˆ>˜>¬ˆÄ
>VŽÄ˜] >VŽÄ˜] 79
֘i>Ö
>˜Ä>Ä ˆÍß
˜Þ܈i
>˜Äˆ˜}
>Ä 6i}>Ä
ˆÍ͏i ,VŽ
Ä ˜}iiÄ
ÖˆÄ܈i
i“¬…ˆÄ
ˆ>“ˆ
ˆÝ>֎ii
ˆ˜˜i>¬ˆÄ
>ą܈i
iÝ "Ái>˜Ä
iÝ 9ÁŽ ˆÍß
ÁvŽ] 6
"Ž>…“> ˆÍß
"“>…>
"Á>˜`
*…ˆ>`i¬…ˆ>
*…i˜ˆÞ
*ˆÍÍÄLÖÁ}…
*Á͏>˜`] ",
*ÁÜˆ`i˜Vi
,>iˆ}…‡ÖÁ…>“
,>¬ˆ` ˆÍß
,i˜
,ˆV…“˜`
->VÁ>“i˜Í
-ͱ ÖˆÄ
->Í >Ži ˆÍß
->˜ ˆi}
->˜ Á>˜VˆÄV
->˜ Äi
->Ü>˜˜>…
-i>Í͏i
-…ÁiÜi¬ÁÍ
-¬Ž>˜i
-¬Áˆ˜}vˆi`] "
-ßÁ>VÖÄi
/>“¬>
/¬iŽ>
/ÖVĝ˜
/֏Ä>
7>ąˆ˜}͝˜] 7ˆV…ˆÍ>
9֓>
·AÏÝïÌÓ ·Ïnӎen¢ÝŽA— ¢¨Ž¢nn
0AÝæÏeAï AÝ Ý‹n ŽQnÏÝAώA¢ ¢A
ݎ¨¢A— [¨¢ìn¢ÝŽ¨¢ Ž¢ AÓ 9n‚AÓ½
¢ ݋n !¨ì½ Ø n—n[ݎ¨¢b ‹n ‹¨·nÓ
ݨ A··nA— ݨ ì¨ÝnÏÓ {ne æ· íŽÝ‹
݋n Ýí¨·AÏÝï ÓïÓÝn½
¨‹¢Ó¨¢ íAÓ A —¨¢‚Ó‹¨Ý
[A¢eŽeAÝn {¨Ï ݋n /n·æQ—Ž[A¢
·Ïnӎen¢ÝŽA— ¢¨Ž¢Aݎ¨¢ í‹n¢
‹n A¢¢¨æ¢[ne Ž¢ n[nQnÏ
݋AÝ ‹n í¨æ—e Ž¢ÓÝnAe ·æÏÓæn
݋n ŽQnÏÝAώA¢ ݎ[–nݽ
n í¨¢ ׀ ·nÏ[n¢Ý ¨{ ݋n ì¨Ýn
¨¢ ݋n {ŽÏÓÝ QA——¨Ý Ž¢ AÓ 9n‚AÓ½
¢ äõõsb ŽQnÏÝAώA¢ en—n‚AÝnÓ
¢nnene ӎî Ϩæ¢eÓ ¨{ ì¨ÝŽ¢‚ ݨ
·Ž[– A ·Ïnӎen¢ÝŽA— ¢¨Ž¢nn½
¨‹¢Ó¨¢ Óæ··¨ÏÝÓ —n‚A—Žóne
Aώ•æA¢Ab —¨í ÝAînÓ A¢e Ž
Ž‚ÏAݎ¨¢ Ïn{¨Ï½
Page 17 of 63
7I
¬V
V
¬V
ą
ą
Ä
V
¬V
Í
V
¬V
ˆÍß
>˜ˆ>
iވV ˆÍß
˜ÍÁi>
ÄVÝ
֘ˆV…
iÝ i…ˆ
"ď
*>ÁˆÄ
,ˆ `i >˜iˆÁ
,“i
->Ď>͝˜
ˆ
šå
ÈÈ
ɤ
Èå
xn
¤åx
x¤
xn
Èn
É{
xÔ
/`>ß

Èn
x¤
{¤
x{
{x
È{
Ïå
{{
ÉÉ
xÉ
Ïx
7I
Í
Í
Ä
¬V
ą
Ä
V
ą
ą
ą
Ę
ˆÍß
-iÖ
-ˆ˜}>¬Ái
-͝VŽ…“
-ß`˜iß
/i ܈Ü
/Žß
/Á˜Í
6ˆi˜˜>
ˆ
ÈÏ
nÈ
x{
ɚ
nx
ÈÈ
É{
Èå
/`>ß

{n
ÈÈ
Ïx
xx
ɤ
x{
{{
xx
7I
Ä
Í
V
Ä
¬V
Í
¬V
¬V
IćÄ֘˜ß] ¬V‡¬>ÁÍß VÖ`ß] V‡VÖ`ß] ą‡Ä…ÝiÁÄ]
͇֘ͅ`iÁÄ͝Á“Ä] Á‡Á>ˆ˜] Äv‡Ä˜Ý vÖÁÁˆiÄ] ʇʝÝ]
ˆ‡ˆVi] *ÁV¬±‡¬ÁiVˆ¬ˆÍ>͈˜] /Á‡ÍÁ>Vi±
¤å
 *>ĝ /ˆ“iÄ
-֘`>ß] >ß ÔÈ] Ôå¤Ô
i¬>ĝ͈“iıV“
7i>ͅiÁ
/" ",
-/
x‡9 ",
-/
/"9
" 9
ˆ š{
 Éx
ˆ šÔ
 ɤ
7 -9
ˆ šÈ
 Éx
ÄÍß Ä֘˜ßÇ LÁiiãß
Ü}± …Ö“ˆ`ˆÍß\ ¤å°
Ä͏ß
Ä֘˜ß >˜`
…Í
Ü}±
…Ö“ˆ`ˆÍß\
x°
/1-9
ÄÍß Ä֘˜ß
>˜` …Í
Ü}±
…Ö“ˆ`ˆÍß\
¤å°
ˆ šÉ
 ÉÉ
/1,-9
-֘˜ß >˜`
…Í
Ü}±
…Ö“ˆ`ˆÍß\
x°
-֘˜ß >˜`
LÁiiãß
Ü}±
…Ö“ˆ`ˆÍß\
Ôå°
ˆ šÔ
 ÉÈ
…iVŽ ÖÍ x‡`>ß ÖÁÁi˜Í V˜`ˆÍˆ˜Ä
->ÍiˆÍi ˆ“>}iÄ ˆ}…Í `i>ßÄ vÁ“
˜ÍiÁ˜>͈˜> ˆÁ¬ÁÍ
*-" ,
*ÁiVˆ¬ˆÍ>͈˜
Ô{ …Áı ͅÁÖ}… É ¬±“± ->ÍÖÁ`>ß ±±±±±±±±±±±±±±
9i>Á ͝ `>Íi ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
ÜiÁ>}i ßi>Á ͝ `>Íi±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
ÜiÁ>}i >ß Í `>Íi ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
/Í> >ß Í `>Íi ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±
ÁiV>ÄÍÄ >˜` }Á>¬…ˆVÄ ¬ÁÜˆ`i` Lß VVÖ7i>ͅiÁ] ˜V± ^Ôå¤Ô
/i“¬iÁ>ÍÖÁiÄ vÁ >ß ÔÉ
ˆ}… ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± šÈ
Á“> …ˆ}… ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± š¤
,iVÁ` …ˆ}… ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± ¤åÔ ˆ˜ ¤šx¤
Ý ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± ɚ
Á“> Ý ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± ÉÏ
,iVÁ` Ý ±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±± {n ˆ˜ ¤šÈx
, +1/9 8
9iÄÍiÁ`>ß¾Ä 6>Öi\ ÉÈ
"<" ˜ÜˆÄˆLi] ˆÁÁˆÍ>ÍiÄ
E ˆ“¬>ˆÁÄ LÁi>ͅˆ˜}
" ˜ÜˆÄˆLi] Ái`ÖViÄ
L` Þß}i˜
*¤å ®¤å “ˆVÁ˜ ¬>Á‡
͈V֏>Íiį
܈ĈLi] V>˜ `}i `ii¬ ˆ˜ ͅi
Ö˜}Ä] Ái`ÖViÄ ÜˆÄˆLˆˆÍß
/`>ß¾Ä ÁiV>ÄÍ\ `
*ÖÍ>˜Í\ *>Á͈V֏>ÍiÄ
-ÖÁVi\ /iÞ>Ä ““ˆÄĈ˜ ˜ ˜ÜˆÁ“i˜Í> +Ö>ˆÍß
16 8
ˆ}…iÁ ֏ÍÁ>܈iÍ ˆ˜`iÞ ˜Ö“LiÁÄ ˆ˜`ˆV>Íi }Ái>ÍiÁ ißi
>˜` ψ˜ iÞ¬ÄÖÁi ͝ 16 ˆ}…ͱ ,iviV͈˜ vv Ý>ÍiÁ Á
ĘÝ V>˜ “>}˜ˆvß 16 V˜Vi˜ÍÁ>͈˜±
å‡Ô] ÝÇ Ï‡x] `iÁ>ÍiÇ É‡È] ˆ}…Ç n‡¤å] 6iÁß ˆ}…Ç ¤¤´]
ÞÍÁi“i
˜ÍiÁ˜iÍ\ i¬>±}ÜÊÄ݈֘Äi
7
7/, /`>ß ˆÄ -֘`>ß±  *>ĝ ÁiĈ`i˜ÍÄ ÝˆÍ… ``‡˜Ö“LiÁi`
>``ÁiÄÄiÄ >Ái ¬iÁ“ˆÍÍi` ͝ Ý>ÍiÁ± 7>ÍiÁˆ˜} …ÖÁÄ >Ái
LivÁi ¤å >±“± >˜` vÁ“ É ¬±“± ͝ “ˆ`˜ˆ}…ͱ /…iÁi ˆÄ ˜
Ý>ÍiÁˆ˜} LiÍÝii˜ ¤å >±“± >˜` É ¬±“± ,iĈ`i˜ÍÄ “ÖÄÍ Ý>ÍiÁ
˜ `iĈ}˜>Íi` `>ßı "`` >``ÁiÄÄiÄ\ 7i`˜iÄ`>ß] Áˆ`>ß >˜`
-֘`>ß± Üi˜ >``ÁiÄÄiÄ\ /ÖiÄ`>ß] /…ÖÁÄ`>ß >˜` ->ÍÖÁ`>ß±
/…iÁi ˆÄ ˜ ÁiĈ`i˜Íˆ> Ý>ÍiÁˆ˜} ˜ ˜`>ßı
*"
"1 /
->ÍÖÁ`>ß¾Ä ¬i˜ Ái>`ˆ˜} vÁ  *>ĝ Ö˜Íß\
>ˆ˜ ¬i˜Ä\ ˜Í >Ü>ˆ>Li±
-ÖÁVi\ Á± ߘ`˜ >˜Ävˆi`
," /-
å±åå¼
¤±Ïn¼
¤±È{¼
å±Ïn¼
å±xϼ
/"9¾- ," ",
-/
->ÍÖÁ`>ß
ˆÍß
Lˆi˜i
>“}Á`
LÖ¶ÖiÁ¶Öi
“>Áˆ
ÖÄ͈˜
ÁÝ˜Ä܈i
>ÁÄL>`
…ˆ…Ö>…Ö>
Ö`VÁvÍ
ÜˆÄ
Á¬ÖÄ …ÁˆÄ͈
>>Ä
i“ˆ˜}
>Á“ˆ˜}͝˜
>Ö¬
LLÄ
ÖÄ͝˜
Ä >“Ä
>Ä ÁÖViÄ
>Ä 6i}>Ä] ÖLLVŽ
>Áv>
ˆ`>˜`
*ÁiĈ`ˆ
,ÄÝi
,ֈ`Ä
/`>ß
ˆÊ *Ái¬±
ˆÊ
7I
š{ÊÈÏ
š¤Êɤ
nšÊxn
š{ÊÈå /Á
šÏÊÈÏ
šÏÊÈÈ
šÈÊȤ
šxÊÉå
ÈÔÊ{Ô
š¤ÊÉÏ
nšÊÈÈ
šÏÊÈx
šÏÊxÏ
nnÊxx
ÈnÊϚ
šåÊÉn
š¤ÊÈx
ÈÈÊxx
šåÊxx
nxÊxÏ
šÔÊÈÔ
š¤Êxš å±åÔ
šÔÊÈÔ
¤ååÊÉÈ
šnÊÉÈ
ȚÊxx
nšÊÉn
šåÊxx
ÈnÊxå
šÔÊx{
šåÊÈå
šåÊÈÉ
ššÊÉ{
š¤ÊÉx
ȤÊ{Ô
šåÊxÔ
nÈÊÈ{
š¤ÊÈÔ
nÉÊxå
ÈåÊÏÈ
ÉÉÊÏÔ
š{ÊÉÔ
šÔÊÈÔ
ÉnÊ{Ô
nšÊxx
ÈÏÊÏn
šåÊɤ
nnÊxš
šåÊÈå
šxÊÉÉ
š{Êxx
ÈÈÊ{š
¬V
Ä
Ä
Í
¬V
¬V
¬V
Ä
Ä
¬V
¬V
¬V
Ä
Ä
Ä
¬V
¬V
Ä
Ä
Ä
Í
¬V
Ä
¬V
¬V
Ä
,>͝˜
"Ž>…“> ˆÍß
ÈÈÊÏn
š¤Êɚ
“>Áˆ
LÖ¶ÖiÁ¶Öi
šÔÊx{
ÈnÊxå
ÜˆÄ
ÖLLVŽ
šåÊxÔ
šåÊɤ
>Ä ÁÖViÄ
7ˆV…ˆÍ> >Ä
nšÊxx
šåÊÈå
>ÁÄL>`
 *>ĝ
>>Ä
ššÊÉ{
ˆ`>˜`
Ö?Áiã
š¤ÊÈÔ
šåÊÈå
š¤ÊÉå
ÖÄ͈˜
šåÊÈå
ÖÄ͝˜
*ÁiĈ`ˆ
šÔÊÈÔ
šxÊÉÉ
->˜ ˜Í˜ˆ
šÔÊÈÔ
->˜Í> i
ÈÏÊϚ
Á¬ÖÄ …ÁˆÄ͈
nÈÊÈ{
…ˆ…Ö>…Ö>
š¤ÊÉx
ÁÝ˜Ä܈i
šåÊÈÉ
->ÍÖÁ`>ß
ˆÍß
->˜ ˜Í˜ˆ
->˜Í> i
-ˆÜiÁ ˆÍß
/ÁÖͅ Á ˜Ä±
ˆÊ
šÏÊÈ{
nxÊxÔ
nÔÊxå
nšÊÉÏ
-/1,9¾- 8/,>͈˜> …ˆ}…\ ¤åÔ >Í V
Ž] iL±
>͈˜> Ý\ ÔÏ >Í `ˆi -Í>Íi *>ÁŽ] >ˆv±
/iÞ>Ä …ˆ}…\ ¤åå >Í *ÁiĈ`ˆ
/iÞ>Ä Ý\ xš >Í >Áv>
/`>ß
*Ái¬±
ˆÊ
šÔÊÈÔ
ÈÏÊϚ
ȚÊ{É
nÏÊxÔ
7I
¬V
Ä
Ä
Ä
-1 ,-Ê-1 -/
iÝ iވV …ˆ}…\ šn >Í ,ÄÝi
iÝ iވV Ý\ ÏÈ >Í ˜}i ˆÁi
-֘ÁˆÄi
É\åÔ >±“±
-֘ÄiÍ
n\å{ ¬±“±
>͈˜> iÞÍÁi“iÄ >Ái vÁ ͅi {n V˜Íˆ}֝ÖÄ ÄÍ>Íiı
ˆÍß
˜V…Á>}i
͏>˜Í>
͏>˜ÍˆV ˆÍß
>Íˆ“Ái
>͝˜ ,Ö}i
ˆˆ˜}Ä
ˆÁ“ˆ˜}…>“
ˆÄ“>ÁVŽ
ˆÄi
Ä͝˜
Övv>
ÖÁˆ˜}͝˜] 6/
…>ÁÄ͝˜] 76
…>ÁÍÍi
…ißi˜˜i
…ˆV>}
ˆ˜Vˆ˜˜>͈
iÜi>˜`
Á>` -¬Á˜}Ä
˜VÁ`] >ß͝˜> i>V…
i˜ÜiÁ
iÄ ˆ˜iÄ
iÍÁˆÍ
>ˆÁL>˜ŽÄ
>Á}
>}ÄÍ>vv
Áiʝ
Á>˜` ,>¬ˆ`Ä
Áii˜ >ß
>ÁÁˆÄLÖÁ}
˜ÖÖ
֘ÍÄ܈i] ˜`ˆ>˜>¬ˆÄ
>VŽÄ˜] >VŽÄ˜] 79
֘i>Ö
>˜Ä>Ä ˆÍß
˜Þ܈i
>˜Äˆ˜}
>Ä 6i}>Ä
ˆÍ͏i ,VŽ
Ä ˜}iiÄ
ÖˆÄ܈i
i“¬…ˆÄ
ˆ>“ˆ
ˆÝ>֎ii
ˆ˜˜i>¬ˆÄ
>ą܈i
iÝ "Ái>˜Ä
iÝ 9ÁŽ ˆÍß
ÁvŽ] 6
"Ž>…“> ˆÍß
"“>…>
"Á>˜`
*…ˆ>`i¬…ˆ>
*…i˜ˆÞ
*ˆÍÍÄLÖÁ}…
*Á͏>˜`] ",
*ÁÜˆ`i˜Vi
,>iˆ}…‡ÖÁ…>“
,>¬ˆ` ˆÍß
,i˜
,ˆV…“˜`
->VÁ>“i˜Í
-ͱ ÖˆÄ
->Í >Ži ˆÍß
->˜ ˆi}
->˜ Á>˜VˆÄV
->˜ Äi
->Ü>˜˜>…
-i>Í͏i
-…ÁiÜi¬ÁÍ
-¬Ž>˜i
-¬Áˆ˜}vˆi`] "
-ßÁ>VÖÄi
/>“¬>
/¬iŽ>
/ÖVĝ˜
/֏Ä>
7>ąˆ˜}͝˜] 7ˆV…ˆÍ>
9֓>
ˆ
xÈ
šÏ
n{
nš
šÏ
{x
š{
{š
xÈ
nÉ
n¤
nÔ
šÔ
nš
n¤
nÉ
šå
nÏ
šå
nn
š¤
šÔ
š¤
È{
ÉÔ
ÉÈ
xÈ
È{
ÈÈ
ÈÏ
nš
nÈ
š{
šå
šÏ
xš
xÏ
nš
š¤
Èx
Èx
š¤
ÉÈ
šå
šÔ
nn
ÉÉ
ÉÏ
šx
šÏ
n{
n¤
nn
šx
šÏ
nÉ
nÔ
nn
Én
nÔ
nÉ
xx
xn
nÉ
Èx
šx
ÉÔ
ÉÉ
Éå
Éx
šÏ
ÈÔ
š¤
ÉÉ
šÏ
nÏ
šx
šÔ
nx
š¤
nÉ
šx
nÔ
->ͱ

{x
Èå
Éx
ÉÉ
ÉÉ
Ϥ
ÉÈ
{{
{Ï
ÉÉ
ɤ
ÉÈ
É{
É{
{n
Éå
ÈÏ
ÉÉ
xå
ÉÏ
ÉÈ
x{
ɤ
ɤ
{Ô
{n
{Ô
xÏ
ÉÔ
xn
ÉÉ
È{
ÉÈ
Èå
ÉÈ
ÏÉ
{È
Èx
Éx
Éå
xÔ
ÉÈ
x{
Èå
Ȥ
ÈÉ
xÈ
xš
ÉÏ
ɚ
ÉÉ
ÉÈ
ÈÏ
É{
Ȥ
ÉÈ
ÉÉ
ÉÈ
xÔ
ÉÏ
ÉÉ
{É
{Ï
ÉÏ
xå
Èx
{š
xÈ
{š
xå
Én
{n
ɚ
{É
ÉÈ
Én
ÈÏ
ÈÉ
ɚ
ÈÏ
Ȥ
Èx
xš
7I
ą
Ä
¬V
¬V
Ä
Á
Ä
Á
Í
V
¬V
¬V
¬V
¬V
Í
¬V
¬V
¬V
Ä
¬V
¬V
¬V
¬V
Í
V
Á
¬V
¬V
Í
V
Í
Ä
Ä
Á
Ä
Í
Á
¬V
Ä
Í
¬V
¬V
¬V
¬V
¬V
¬V
Í
Í
Ä
¬V
¬V
¬V
¬V
¬V
¬V
¬V
Ä
¬V
Í
Í
¬V
V
V
¬V
¬V
¬V
V
¬V
V
¬V
¬V
¬V
¬V
V
¬V
¬V
¬V
¬V
Ä
¬V
¬V
¬V
Ä
ˆ
xš
nn
nå
š¤
š{
xÏ
šÔ
Èå
Èå
ÈÏ
nÏ
ÈÉ
šÔ
n{
Èå
šÈ
š{
nn
ÈÏ
ÈÉ
nx
ÈÉ
šÔ
šÔ
É{
Èn
Éx
n¤
šÔ
nn
nÉ
nÈ
šx
šx
šÉ
{È
xn
š¤
šÏ
šÔ
nÏ
šÉ
Èå
šÉ
šÉ
nš
nn
nn
šÏ
š{
nå
nÔ
š¤
šå
nn
nn
nn
nn
ÉÈ
ÈÔ
nx
ÈÏ
Ȥ
š¤
Ț
šÉ
É{
ɚ
Éx
ÈÔ
nÔ
É{
š{
Ȥ
šå
n{
nš
šÔ
nÉ
šÔ
š¤
šÔ
nš
/`>ß

{È
ɚ
ÉÉ
Én
Èå
{¤
Èå
{É
{È
Éå
Én
xn
ÉÉ
Én
Ϛ
È{
Èå
ɚ
{Ô
x{
ÈÏ
{Ô
Én
Èå
Ϛ
x{
Ϥ
xn
ɚ
ɚ
ɚ
ÈÏ
ɚ
Ȥ
ɚ
Ïå
{¤
ÉÉ
ÉÉ
Èå
ÉÏ
Ȥ
xn
ÈÏ
ÈÉ
ÈÉ
Èå
ÉÉ
Ȥ
ÈÉ
ÉÈ
Én
ɚ
ÉÏ
Èå
ÉÈ
Éx
Én
x{
xš
ɚ
{å
{È
Én
xå
Èx
{È
Éå
xÏ
xÏ
ÈÏ
xå
Èå
{È
É{
ÉÉ
Èx
ÉÈ
xÉ
Èå
Ȥ
Én
Éx
7I
ą
¬V
Í
¬V
¬V
Á
Ä
Í
¬V
¬V
Í
Í
¬V
¬V
¬V
¬V
Ä
¬V
¬V
¬V
Í
¬V
Ä
¬V
ą
Í
Ä
Ä
¬V
¬V
Í
¬V
Ä
Ä
Ä
Á
V
Ä
¬V
¬V
Ä
Ä
¬V
Ä
Ä
Í
Ä
Í
Ä
¬V
Í
Ä
¬V
Í
Í
Í
Ä
¬V
¬V
¬V
¬V
¬V
Ä
Ä
Ä
Ä
ą
¬V
Ä
Ä
Á
¬V
¬V
¬V
Ä
Í
Í
Ä
Ä
Ä
¬V
Ä
Ä
7",
ˆÍß
V>¬ÖV
“ÄÍiÁ`>“
ͅi˜Ä
>}…`>`
>˜}ŽŽ
iˆˆ˜}
iÁˆ˜
}Í>
ÁÖÄÄiÄ
Öi˜Ä ˆÁiÄ
>ˆÁ
ˆ
š¤
Èx
Ț
¤åå
šÔ
šx
ÈÏ
ÉÉ
Èx
Én
šÔ
/`>ß

ÈÉ
xx
ÉÏ
Èx
nå
ÉÏ
xå
{x
xÉ
Éå
ÈÔ
7I
Í
Ä
¬V
Ä
Í
Ä
¬V
ą
Ä
¬V
¬V
ˆÍß
>˜V֘
¬i˜…>}i˜
ÖLˆ˜
Á>˜ŽvÖÁÍ
i˜iÜ>
>Ü>˜>
˜} ˜}
iÁÖÄ>i“
>L֏
˜`˜
>`Áˆ`
ˆ
nš
ÉÈ
ÉÈ
Èx
ÈÔ
nÈ
nn
nÔ
nÏ
Ț
nå
/`>ß

ÈÉ
xx
xÔ
x{
xÔ
ÈÏ
nÏ
Éx
xÏ
xÏ
xÈ
Page 18 of 63
7I
Í
¬V
Ä
¬V
Í
ą
Í
¬V
Í
Ä
Ä
ˆÍß
>˜ˆ>
iވV ˆÍß
˜ÍÁi>
ÄVÝ
֘ˆV…
iÝ i…ˆ
"ď
*>ÁˆÄ
,ˆ `i >˜iˆÁ
,“i
->Ď>͝˜
ˆ
šÏ
n¤
ÉÈ
É{
ɚ
¤¤å
ÈÈ
Èn
nå
ÈÈ
É{
/`>ß

Ț
xÏ
xÔ
{È
{É
nÔ
x¤
xÉ
ÉÈ
xx
ÏÔ
7I
Í
ą
Í
ą
V
¬V
Ä
¬V
ą
Ä
Á
ˆÍß
-iÖ
-ˆ˜}>¬Ái
-͝VŽ…“
-ß`˜iß
/i ܈Ü
/Žß
/Á˜Í
6ˆi˜˜>
ˆ
nå
nn
ÈÏ
ÉÉ
nÉ
Èx
ÈÈ
ÈÔ
/`>ß

xš
Ț
xÏ
xn
Én
ÉÏ
xš
x¤
7I
Ä
Í
Ä
¬V
¬V
Ä
Í
¬V
IćÄ֘˜ß] ¬V‡¬>ÁÍß VÖ`ß] V‡VÖ`ß] ą‡Ä…ÝiÁÄ]
͇֘ͅ`iÁÄ͝Á“Ä] Á‡Á>ˆ˜] Äv‡Ä˜Ý vÖÁÁˆiÄ] ʇʝÝ]
ˆ‡ˆVi] *ÁV¬±‡¬ÁiVˆ¬ˆÍ>͈˜] /Á‡ÍÁ>Vi±
Page 19 of 63
Page 20 of 63
EXHIBITS PRESENTED DURING PUBLIC MEETING
Page 21 of 63
Page 22 of 63
Traffic volume and congestion on the I-10 corridor has
continued to increase due to population growth and economic
development. Future population growth trends are expected to
place even more traffic demand on the I-10 corridor. The
proposed I-10 improvements would meet this increased
demand with the construction of collector-distributor lanes for
5.75 miles of I-10 and improvements to the US 85
interchange. The I-10 C-D lanes would be constructed to the
outside edge of the existing main lanes in both east and west
directions connecting three interchanges. The existing direct
connector at Resler Drive and the direct connector at Sunland
Park Drive would be replaced with improved connectors.
Improvements are also proposed for the existing interchange
at SH 20 (Mesa Street), Sunland Park Drive, and Executive
Center Boulevard.
Project Description
Written comments may also be submitted electronically to
[email protected] by Friday, June 15, 2012.
Mailed comment forms must be postmarked no later than
Friday, June 15, 2012.
SLI Engineering, Inc.
Attn: I-10 C-D Project Coordinator
6600 Westwind Drive
El Paso, Texas 79912
Comment forms are located at the sign-in table. Forms
completed tonight should be dropped into the white deposit
box. Comment forms returned by mail should be mailed to:
Written Comments
This Public Meeting is to encourage and solicit public
comments regarding the proposed I-10 C-D project. No
formal presentation will be given, however project staff is
present to answer any questions you may have regarding the
project.
Open House Meeting
The objectives of this I-10 improvement project include:
 Improve mobility and operational efficiency
 Facilitate congestion management in the project corridor
 Reduce travel time
All meeting attendees are encouraged to sign-in. The sign-in
sheets assist in keeping a record of attendance for this
meeting and will help in evaluating the public interest for this
project.
Meeting Purpose
This Public Meeting is being conducted to gather information
from interested individuals on the proposed addition of
collector-distributor (C-D) lanes on I-10 between SH 20
(Mesa Street) and Executive Center Boulevard and
improvements to the interchange at US 85.
Project Objectives
Sign-In
Page 23 of 63
From SH 20 (Mesa Street) To Executive Center Boulevard
El Paso, Texas
I-10 Collector-Distributor Lanes Project
N
Tuesday, June 5, 2012
6:00 pm to 8:00 pm
West Side Regional Command Center
Community Room
From SH 20 (Mesa Street)
To Executive Center Boulevard
El Paso, Texas
I-10 Collector-Distributor
Lanes Project
PUBLIC MEETING
Texas
Department
of Transportation
Page 24 of 63
El volumen y la congestión de tráfico en el corredor de la autopista
I-10 continúa aumentando debido principalmente al crecimiento de
la poblacin y al continuo desarrollo econmico de la regin. Se
espera que tendencias futuras de crecimiento aumenten la demanda
de tráfico a lo largo del corredor. Las mejoras propuestas van a
satisfacer este aumento en la demanda con la construcción de
carriles colectores de distribución en el tramo de 5.75 millas así
como las mejoras a la intersección de US 85. Los carriles
colectores de distribución se construirán en el borde exterior de los
carriles existenmtes en ambas direcciones conectando tres
intersecciones. Los conectores existentes en Resler Dr. y Sunland
Park Dr. serán remplazados con conectores mejorados. También se
proponen mejoras a las intersecciones existentes de I-10 con SH 20
(Calle Mesa), Sunland Park Drive y el Bulevar Executive Center
Descripcin del Proyecto
La intención de esta reunión pública es presentar el proyecto de
carriles colectores de distribución en I-10 al público y solicitar
comentarios sobre el proyecto. No habrá presentación formal
durante esta reunión.
Esta reunin se ha organizado con el propsito de recolectar
informacin proporcionada por personas interesadas en el proyecto
de construir nuevos carriles colectores de distribucin en la
autopista I-10 entre las interseccines de la Calle Mesa y el
Bulevar Excecutive Center y además mejorar la interseccin con la
carretera US 85.
Si desea, puede enviar sus comentarios por correo electrónico a
[email protected]
Los comentarios que se enven por correo deberán estar fechados
por la oficina postal a más tardar el viernes, 15 de junio de 2012
SLI Engineering Inc.
Attn: I 10 CD Project Coordinator
6600 Westwind Drive
El Paso, Texas 79912
Las formas de comentarios están disponibles en la mesa de
registro. Las formas llenadas hoy pueden ser depositadas en las
cajas blancas de comentarios. Las formas enviadas por correo
deben ser enviadas a:
Comentarios por Escrito
Junta Informal y Abierta
Los objetivos del proyecto incluyen:
Mejorar la movilidad y eficiencia operacional del corredor
Facilitar el manejo de congestin de tráfico
Reducir el tiempo total de viaje a lo largo del corredor
Objetivos del Proyecto
Propsito de la Junta Pública
Se recomienda que todas las personas que atienden esta reunin se
registren en las hojas de registro. Las hojas de registro nos
permitirán mantener un historial de asistencia y al mismo tiempo
nos ayudarán a evaluar el interés del público en este proyecto.
Registro
Page 25 of 63
Lmites entre SH 20 (Calle Mesa) y
El Bulevar Executive Center
El Paso, Texas
Proyecto de Nuevos Carriles Colectores de Distribucin
En la Autopista Interestatal I-10
N
martes 5 de junio de 2012
6:00 PM a 8:00 PM
West Side Regional Command Center
Community Room
Lmites entre SH 20 (Calle Mesa) y
El Bulevar Executive Center
El Paso, Texas
Proyecto de Nuevos Carriles
Colectores de Distribucin
En la Autopista Interestatal I-10
REUNIÓN PÚBLICA
Texas
Department
of Transportation
Page 26 of 63
Límites: de Calle Mesa a
Bulevar Executive Center
El Paso, Texas
martes 5 de junio de 2012
6:00 PM a 8:00 PM
From SH 20 (Mesa Street) to
Executive Center Boulevard
Tuesday, June 5, 2012
6:00 pm to 8:00 pm
West Side Regional
Command Center
Community Room
West Side Regional
Command Center
Community Room
Carriles Colectores de
Distribución en I-10
I-10 Collector-Distributor
Lanes Project
El Paso, Texas
REUNIÓN
PÚBLICA
PUBLIC
MEETING
Texas Department of Transportation
Page 27 of 63
x Mejorar la Movilidad y
eficiencia operacional
x Facilitar el manejo de la
congestión en el corredor
I-10
x Reducir el tiempo de viaje
x Facilitate congestion
management in the project
corridor
x Reduce travel time
Objetivos del
Proyecto
x Improve mobility and
operational efficiency
Project
Objectives
Texas Department of Transportation
Page 28 of 63
x Improve Intersection at
Executive Center Boulevard
x Upgrade Interchanges at Sunland
Park Drive and SH 20 (Mesa
Street) to Diamond Interchanges
x Reconstruct Resler Drive
Connection
x Improve Interchange with US 85
x Add Collector-Distributor Lanes
I-10 C-D
Project Description
x Mejorar la Intersección de I-10
con el Bulevar Executive Center
x Mejorar la Intersección de
Sunland Park Drive y la Calle
Mesa con I-10
x Reconstruir la conexión de
Resler Drive con I-10
x Mejorar la Intersección de US 85
con I-10
x Añadir los Carriles Colectores de
Distribución en I-10
Descripción del
Proyecto I-10
Texas Department of Transportation
Page 29 of 63
Información de
Derecho de Vía
Right-of-Way
Information
Texas Department of Transportation
Page 30 of 63
Por favor escriba sus comentarios en
las formas proporcionadas y
deposítelas en las cajas, ó doble,
selle y envíe por correo a:
SLI Engineering Inc.
Attn: I-10 C-D Project Coordinator
6600 Westwind Drive
El Paso, Texas 79912
SLI Engineering Inc.
Attn: I-10 C-D Project Coordinator
6600 Westwind Drive
El Paso, Texas 79912
Agradecemos Sus
Comentarios
Please write your comments on the
forms provided and leave them in the
box, or fold, seal, and mail to:
We Welcome Your
Comments
Texas Department of Transportation
I-10 Collector-Distributor Project
OR
EL C
GL
EN
D
A
AM
BEGIN PROPOSED
CONSTRUCTION
MESA
DAM
OUTLE
T
AJO
N
!
(
Comfort Inn Suites
SA
NB
!
(
LaQuinta
Tony Lama Outlet Store Fuddruckers
Home Depot
!
(
!
(
!
(
Strip Center Krispy Kreme
RESL
ER
!
(
!
(
!
(
!
(
!
(
LA
S
Chilli's
Strip Center
Texas Road House
TE
!
(
Valero
!
(
!
(
BAU
XI
Sprint Store Title Max
WalMart
!
(
!
(
Verizon Store
!
(
Office
Econolodge
!
(
!
(
!
(
BrrBerry Custard
Red Roof Inn
!
(
!
(
Motel 6
!
(
!
(
Cracker Barrel
La Quinta
!
(
!
(
Al's Security and Locksmith
!
(
!
(
!
(
Payless
Telecommunication
!
(
!
(
The Clinic
!
(
The Clinic
!
(
S
!
(
Mr Car Wash
NL
EY
MAP 1
!
(
!
(
Diamond Shamroack Fastenal
PA
N
SY
μ
CO
R7C, Inc
!
(
!
(
AD
!
(
!
(
Starbucks
Office Building
!
(
!
(
!
(
OS
SR
O
DITCH
KEYSTONE
77 Service
MAP 2
CR
Cinemark
Fairfield Inn
Travel Lodge
Taco Cabana
McDonald's
Spring Hill Suites
!
(
!
(
Leo's Mexican Food
Village Inn
Hobby Lobby/Strip Center
!
(
Days Inn
!
(
!
(
Cash for Gold
McClintock Self Storage
KEYSTO NE DITCH
RCENA
ST
ILE
MA
AH
ME
S
SUNLAND PARK
F
BL
UF
1
$
L
ZAPA
ARROY
O
!
(
!
(
!
(
!
(
Sunland Park Mall
!
(
AINA
!
(
DirectBuy
GE
BestBuy
!
(
PAL
L
ANNE
!
(
CH
Residential
NO
LE
ON
Santa Teresita Church
PAL
DR
DE
æ
NO
Verizon Store
BA
Buena Vista Neighborhood Park
ITE
QU
MES
Red Lobster
KEYSTONE DITCH
!
(
Residential
PAIS
AN O
TO
§
¨
¦
RR ES
!
(
Buena Vista Grocery
10
PAISA
NO
!
(
!
(
!
(
END PROPOSED
CONSTRUCTION
Mack Massey Chrysler Jeep
Cellular Tower
G
MA
Shamaley Buick GMC
DAL
EN
A
!
(
!
(
MACHUCA
MAP 2
DONIPHAN PARK
E
LSID
HIL
K
μ
!
(
Sleep Inn
TRAC
RACE
CROCKETT
Cellular Tower
Holiday Inn
Residential
!
(
!
(
Comfort Suites
RUBIN
PETE
§
¦
¨
PAYAN
10
AR
R
O
YO
CSA Personnel Services
!(
RIO
μ
MAP 3
2
O
AV
BR
M
AP
ARROYO
America's Best Value Inn
MA
P
!(
4
RIO BRAVO
!
(
CSA Personnel Services
END PROPOSED
CONSTRUCTION
!
(
Las Palmas & Del Sol Regional
Existing Right-of-Way
Water Resources
Proposed Right-of-Way
Arroyo
TIV
E
CE
ER
NT
§
¦
¨
10
!
(
ASARCO
Canal
!
(
Commercial
Drain
!
(
Residential
Lateral
!
(
Utility
Intermittent Stream
1
$
Park
Lake/Pond (Intermittent)
æ
Church
Reservoir (Water Storage)
PA
IS
U
EC
EX
Structure
Land Cover
100-Year FloodPlain
Disturbed/Bare Ground
!
(
La Calavera
SAN
MA
Undeveloped Vegetation
L
RCOS
K
AN
MAP 4
FR
1 inch = 240 feet
μ
0
Page 31 of 63
AN
O
!
(
America's Best Value Inn
MAP 3
IM
3
§
¨
¦
Michael's
Residential
P
10
BLUF
F
TR
AIL
CANY
ON
ILL
S
CA
MONT CER
VIN
JEBEL
AR
ARROYO
CO ND
UIT
INO
EL
C
250
500
750
LIN
CA
NA
O
AN
IS
PA
1,000
Feet
Page 32 of 63
Page 33 of 63
SIGN-IN SHEETS
Page 34 of 63
Page 35 of 63
Page 36 of 63
Page 37 of 63
Page 38 of 63
Page 39 of 63
Page 40 of 63
Page 41 of 63
Page 42 of 63
PHOTOGRAPHS
Page 43 of 63
Page 44 of 63
Page 45 of 63
Page 46 of 63
Page 47 of 63
WRITTEN COMMENTS
Page 48 of 63
Comment No. 1
Page 49 of 63
Comment No. 2
Page 50 of 63
Comment No. 3
Page 51 of 63
Page 52 of 63
Comment No. 4
Page 53 of 63
Page 54 of 63
Comment No. 5
Page 55 of 63
Page 56 of 63
Comment No. 6
Page 57 of 63
Page 58 of 63
Comment No. 7
Page 59 of 63
Page 60 of 63
Comment No. 8
Page 61 of 63
Page 62 of 63
Comment No. 9
Page 63 of 63

Documentos relacionados