I-70 East EIS - February 2016 Public Hearings

Transcripción

I-70 East EIS - February 2016 Public Hearings
More details can be found in
Puede encontrar más detalles
Attachment A
en el Anexo A
of the Final EIS
del EIS Final
Build Alternatives
Alternativas de Construcción
COLORADO BLVD
Colorado Boulevard – Central Park Boulevard
48TH AVE
48TH AVE
UE
BE
C
ST
FOREST ST
47TH AVE DR
WILLOW ST
R
KD
REE
DC
SAN
TRENTON ST
48TH AVE
Q
THE SHOPS AT
NORTHFIELD
STAPLETON
S
46TH AVE DR
A
N
D
C
R
K
IVY ST
E
LEYDEN ST
E
46TH AVE
YOSEMITE
ST
YOSEMITE ST
DAHLIA ST
Safeway Distribution Center
AIR
LA
W
N
RD
SA
SMITH
ND
QUEBEC ST
ONEIDA ST
HOLLY ST
MONACO ST
SMITH RD
CR
EEK
RD
GENEVA ST
HAVANA ST
IRONTON ST
CENTRAL PAR
Central Park Boulevard – I-225
45TH AVE
45TH AVE
45TH AVE
PEORIA ST
45TH AVE
AVE
CA
RS
ON
S
T
44TH
42ND
40TH AVE
AVE
40TH AVE
LIMA ST
UP
RR
SP
UR
40TH AVE
WHEELING ST
39TH AVE
Proposed highway and ramps
Proposed street configuration
Proposed sidewalk and median
Autopista y rampas propuestas
Configuración de calles propuesta
Aceras y camellones propuestos
General-purpose lanes
Managed lanes
Striped buffer
Carriles de uso general
Carriles administrados
Drainage
Construction limits
Parcel boundaries
Zona neutral señalizada
Drenaje
Límites de la construcción
Límites de la parcela
These maps are graphical representations of the alternatives evaluated in the Final EIS intended for illustration purposes only. The alternatives are preliminary in design, and details are subject to change through final design and construction.
Estos mapas son representaciones gráficas de las alternativas evaluadas en el EIS Final que solo tienen el propósito de ilustrar. Estos diseños de las alternativas son preliminares y los detalles están sujetos a cambios durante el diseño final y la construcción
www.i-70east.com • 303.757.9413
02/2016

Documentos relacionados