executive summary.

Transcripción

executive summary.
WIND TURBINE FOR ELECTRICITY
PRODUCTION
WIND ENERGY IN SPAIN
The installation of wind farms increases every day in all countries. In the last ten years, thanks
to a technological development and increased its competitiveness in economic terms, wind
energy has gone from being a marginal utopia to a reality that is consolidated as a future
alternative and complementary to the polluting sources currently.
Wind energy can be defined as an emerging sector for multiple reasons:
• Existence of large wind potential in the country.
• Need to take advantage of all possible sources of energy available.
• Complies with the aim of developing distributed generation.
• Can supply electricity in places isolated and away from the mains.
• Generates energy next to the points of consumption, so it reduces losses.
• It is accessible to many users, just need to civil works, and its installation is simple.
• Stimulates awareness at the personal level of the energy problem.
• Works with moderate winds and does not require complicated feasibility studies.
• It is a sector based on small and medium-sized enterprises.
• It has a big market in developing countries.
WHAT WE DO?
System wind MORCILLO S.L. created in 2013 build their activity in the
production of electricity through a new system of patented turbine and to the
construction and sale of wind turbines of medium (from 50 to 1000 kw) power
to all people, companies or companies who want to become producers of
electricity.
PROJECT DESCRIPTION:
Supported at two points horizontal-axis wind turbine with blades of praise,
covered by the bottom-shaped pyramid. Maximum system 20 meters height.
WHO WE ARE?
Ricardo Morcillo Molina.
Mecánico Industrial
Inventor del Proyecto
D. José Rojas Melgarejo.
Arquitecto del proyecto.
Ejecución del proyecto
Carlos Morcillo Penalva
Director Comercial
Representante
ad que se consolida como
D. Manuel García Sánchez.
Ingeniero Técnico en Recursos Energéticos.
Empresa: Sigma Ingenieros.
D. José Tomas Sánchez Bayona.
Arquitecto del proyecto.
Empresa: Siyasa Electricidad.
Daniel Morcillo Sánchez
Ingeniero Industria Mecánico
Ejecución del proyecto
Centro Tecnológico Naval y del Mar
Ingenieros Técnicos Industriales, Eléctricos y Electrónicos.
Ejecución del proyecto.
Contamos con 120 Socios entre l os que distinguimos: Ingenieros, arquitectos, abogados,
empresarios…
PATENT
Patent national application number: 200700576
March 07, 2007 dates.
ARRIVAL DATE: 13.02.2009
PRESENTATION DATE: 13.02.2009
DATE PUBLICATION: 20.09.2012
AWARD DATE: 24.05.2013
Utility model application number: 201300927
October 30, 2013 date of presentation.
DATE OF PRESENTATION: 30.10.2013
DATE PUBLICATION: 26.12.2013
AWARD DATE: 17.03.2014
Grant received by 2015 amounting to € 2,700
PCT international application No.: 2014070774
13 of October 2014 date of presentation.
PATENT
The system is patented in the countries (17):
Usa, China, Tailandia, Egipto, Panamá, Brasil, México, Chile, Malasia, Rusia, India, Australia,
Colombia, Argelia, Indonesia, Sudáfrica, Marruecos y Canadá
Members of the SCE the following countries (11 countries):
Albania, Croacia, Islandia, Liechtenstein, Antigua República Yugoeslava de Macedonia,
Mónaco, Noruega, San Marino, Serbia, Suiza y Turquía.
Members of the European Union (27 countries):
AT Austria, FI Finlandia, LV Letonia, SE Suecia, AL Albania, FR Francia, LT, Lituania, SL
Eslovenia, BE Bélgica, GB Reino Unido, LU Luxemburgo, SK Eslovaquia, BG Bulgaria, GR
Grecia, MC Mónaco, SM San Marino, CH Suiza, HR Croacia, MT Malta, TR Turquía, CY
Chipre, HU Hungría, NL Países Bajos, CZ República Checa, EI Irlanda, NO Noruega, DE
Alemania, IS Islandia, PL Polonia, DK Dinamarca, IT Italia, PT Portugal, EE Estonia, LI
Liechtenstein, RO Rumanía, ES España, LK Macedonia, RS Serbia.
TOTAL PAISES PATENTADOS 56
PATENT
Ricardo Morcillo Molina owns the patent and unique society administrator,
donate system wind Morcillo commercial contract the benefits of the exploitation
of the patent, 50% of international patent and 10% of the national patent, i.e.
Spain and 50% other countries.
For each turbine company selling to third parties in any country where this
protected system, will be charged a year of royalty by the production according to
the installed power of the wind turbine.
THE VALUE OF THE PATENT IS A YEAR OF PRODUCTION
Example: 10 wind farm wind turbines of 500Kw = 5. installed 000Kw. (5Mw)
5. 000Kw X 2000 h = 10,000. 000Kw X €0.08 = € 800,000 of royalty.
€ 800,000 is the benefit of the patent of this wind farm and 50% (400,000€) is
direct to the society.
PATENT
TOP 15 COUNTRIES OF THE WORLD WIND
PAISES
POTENCIA FINAL
2015
Mw
POTENCIA
AÑADIDA 2015
Mw
RADIO DE
CRECIMIENTO
%
POTENCIA SISTEMA
POTENCIA SISTEMA
POTENCIA SISTEMA
POTENCIA SISTEMA
29.0
MORCILLO 2017
Mw
3.0
MORCILLO 2018
Mw
3.0
MORCILLO 2019
Mw
4.0
MORCILLO 2020
Mw
5.0
CHINA
EE.UU
ALEMANIA
INDIA
ESPAÑA
REINO UNIDO
CANADA
FRANCIA
ITALIA
BRASIL
SUECIA
POLINIA
PORTUGA
DINAMARCA
TURQUIA
148.000
32.970
74.347
8.598
45.192
4.919
13.1
3.0
3.0
4.0
5.0
11.7
4.0
4.0
5.0
24.579
6.0
2.294
10.2
2.0
2.0
3.0
4.0
22.987
0
0.0
5.0
5.0
5.0
7.0
13.614
1.174
9.4
3.0
3.0
4.0
5.0
11.205
1.511
15.6
2.0
2.0
3.0
4.0
10.293
997
10.7
4.0
4.0
5.0
6.0
8.958
295
3.4
3.0
3.0
4.0
5.0
8.715
2.754
46.2
6.0
6.0
5.0
6.0
6.025
615
11.1
2.0
2.0
3.0
4.0
5.100
1.266
33.0
3.0
3.0
4.0
5.0
5.079
126
2.5
2.0
2.0
3.0
4.0
5.064
217
3.7
3.0
3.0
4.0
5.0
4.718
955
25.4
3.0
3.0
4.0
5.0
RESTO DEL MUNDO
40.800
5.000
14.0
434.856
63.690
17.2
47.0
47.0
62.0
77.0
24 UNIDADES
24 UNIDADES
31 UNIDADES
36 UNIDADES
TOTAL
TOTAL AEROGENERADORES
GAINS PATENT
TABLE OF ANNUAL BENEFITS AND EXPENSES
EXPENSES 2017:
47.000.000€
7.520.000€
47.000.000€
BENEFITS 2017:
ad que se consolida como
BENEFITS 2018:
EXPENSES 2018:
EXPENSES 2019:
62.000.000€
BENEFITS 2019:
9.920.000€
GASTOS 2020:
77.000.000€
BENEFITS 2020:
12.320.000€
TOTAL:
233.000.000€
7.520.000€
37.280.000€
233.000.000€ / 37.280.000€ = 6.25 years of amortization.
Our society Morcillo wind power system plans wind parks Assembly throughout the
international since we have the patent from 56 countries.
ADVANTAGES OF W IND FARMS
• Existence of unlimited wind resource, i.e., there is
no problem that is exhausted with the passage of the
years.
•Technology more developed than the other sources
of renewable energy, which has enabled to cope with
problems that existed at the beginning of its
implementation. The variation of the technology has
made it possible for example the manufacture of
machines with higher maximum power limits that
also allow the regulation of reactive.
•They have a more competitive cost with the of
conventional than other types of renewable
generation sources.
Average (€mounted) generation costs compilation from different studies
It is a source of renewable energy, the environmental advantages are very important. For example, if we
sustituyésemos a wind farm of 50 MW and 2,300 equivalent hours in a conventional thermal power plant of the
same generation capacity, we would be emitting 100,000 tonnes of CO2-friendly
Annually and to generate the same amount of energy would be required 24,000 tons of oil a year.
COMPETENCIES
The installation of wind farms increases every day in all countries.
In the last ten years, thanks to a technological development and increased its
competitiveness in economic terms, the wind has gone from being a utopia
marginal to a reality that is consolidated
an alternative
ad que seasconsolida
como future and time,
complementary to the polluting sources.
Although the technology of wind turbines of medium power in Spain suffers a
delay with respect to other countries, can now be set as an emerging sector for
multiple reasons.
COMPARISONS
Model:
RM1000
Field :
546 m2
Ground base :
546 m2
Rated power :
1 Mw
Costs :
1,000,000€
Model:
convencional
Field :
90,000 m2
Ground base :
30 m2
Rated power :
1 Mw
Costs :
1,300,000€
Noise :
Null
Rotor diameter :
10 m
height:
ad que se consolida como
20 m
Transport :
Simple
Manufacturing :
place of installation
Noise :
nulo
Rotor diameter :
100 m
Height
150 m
Transport :
difficult to transport
Manufacturing :
It manufactures special
300Kw prototype costs
It must be borne in mind that the costs of construction of the first wind turbine will be
greater when it comes from a prototype.
Concrete structure :
Domes :
Axis :
Bearing hub :
Spinning system :
Blades :
Structure troncopitamidal :
Multiplier :
Alternator :
Electrical part :
Electronic part:
It conexiona network:
Licensing :
Electrical project:
TOTAL:
32.000€
10.000€
43.000€
12.000€
15.000€
30.000€
34.000€
10.000€
32.000€
34.000€
11.000€
21.000€
8.000€
8.000€
300.0000€
Wind turbine Morcillo € 1000 per kilowatt built.
A conventional wind turbine €1400 per kW built.
50 años
25 años
25 años
15 años
15 años
25 años
25 años
15 años
15 años
15 años
10 años
25 años
25 años
indefinite __
ADVANTAGES
Our system is greatly reduced costs for several reasons:
-We don't have special permissions to a wind turbine since its maximum height is 20
meters.
-Do not need special factories to develop the wind turbine, materials will be the
performance area of the wind farm, with all that we saved many costs in transportation.
-Decreased costs in maintenance by the height of the wind turbine.
-You don't need special mounting of wind turbine cranes.
-Another advantage is that not bothersome to the migration of birds, which is an important
advantage since, when it comes to assembling a wind farm of conventional wind turbines,
environment puts a lot of stick and the project will not run, in our case it would be possible
since we don't bother others in their migration.
ADVANTAGES
-At the time of riding a wind farm system Morcillo occupies more land than a conventional
wind turbine-based, but the space of security between a wind turbine is much smaller, so
we can install 3 times more power than a conventional wind turbine.
-By the height of our system, no environmental impact are required.
Comparing prices between the two systems:
Conventional wind turbines €1.40 built Watt
Example: 100Kw = € 140,000
Shank €1 built Watt wind turbine
Example: 100Kw = € 100,000
Each 100Kw saves € 40,000.
On the other hand there are costs that are not directly scalable as the substation and
electrical connection
ADVANTAGES
Our system offers a number of advantages over conventional systems among which we
highlight:
•
Lower bushing, lower visual and environmental impact.
•
The simplicity of the mechanism. Ease of maintenance.
•
Less perimeter security due to the robustness of the installation.
•
Less space required for the deployment of a wind farm.
•
Possibility of facilities in urban or semi-urban environments.
•
The wind turbine works 100% with winds of 8 m/s.
•
Watt built between 0.9 and €1, price example: (100Kw = € 100,000).
•
Maximum height of 20 meters system
ADVANTAGES
ALL THESE ADVANTAGES ARE:
Lower costs by terrain, location and access.
Lower costs for maintenance.
• The location in semi-urban environments
reduces the cost of connection to the network
and increases the number of potential
customers
•(Industrial Pol, town halls, sport and cultural
complexes, etc.)
ANNUAL GROWTH
The growth of the society system wind Morcillo is the construction of their
own wind turbines throughout the international.
-With the production account or loans through banks and private investors.
Will be able to build own wind turbines with the sale of the patent in other
countries
All loans or private investment that the company or a particular requests for
installation of our system will be guaranteed by tests made previously to our
first prototype. The endorsement will be the production of wind turbines
constructed.
Society plans a yearly with enough potential growth because that wind energy
is growing around the world. In 5 or 6 years we can easily have an installed
capacity of 50 MW, this would be approximately 100Kw for every 1,000
shares.
PLAN OF ACTION
Morcillo wind system society plans a plan of action for the installation of
wind farms throughout international, since we have the patent.
Currently, a project for a wind farm in Sierra de Ascoy we are asking in the
town of Cieza.
Foto 3D Parque Eólico Sierra Ascoy
NEEDS
The society has opened a Capital increase of 500,000 shares and at the moment
we have more than 80% of the shares awarded to 124 partners already
collaborating with this project.
The necessary capital is to connect the 300Kw prototype network and the
company maintain active.
INVESTMENT MINIMUM € 10,000
SHARES OF THE COMPANY 500,000 X €1
ACTIONS BY 124 460,000 PARTNERS X €1
40,000 SHARES ON SALE
BECOME A PARTNER
NOW!
FINANCING EXPENSES
The 40,000 shares that we need, they are to be used in the electrical part, connection to
the network of the wind turbine and the PCT patent protection.
We are in contact with the marketer (Iberdrola) for connection to the network, we have
branch point assigned to 150 meters of the wind turbine and this entered the guarantee
industry of €3,000 (€10 = 1Kw) for the requested 300 Kw.
The company that is responsible for making the connection to the network already has the
instructions for when you get money, you start with the installation.
This 2016 prototype will be connected to the network and begin to generate profits for the
company.
The patent has a term of presentation which meets May 30, 2016, why you need the
maximum funding to protect the system. Have it protected in 56 countries, but if you get
more money can be protected in most countries and obtain greater benefits from the
patent.
EARNINGS 300Kw
Wind hours approximate the area of Cieza (Murcia), equivalent to about 2,000 hours
aproximately with an average of 8 m/s.
•Price of Kw varies according to the consumption of the population, ranges between €0.08.
Making an estimate of the production, wind and price of Kw hours:
300 Kw x 2000 h = 600,000 Kw x €0.08 = € 48,000 per year which will produce a wind
turbine, considering that a 300 Kw wind turbine has an approximate cost of € 300,000.
Amortization of wind between 7 and 8 years, depending on the wind and wind farm
deployment area.
KW produced over the lifetime of the turbine for 25 years minimum: 15,000. 000Kw x €0.08
= €1,200,000.
PARTNERS also benefit from the exploitation of the patent, a 50% international patent and
10% international patent.
BECAUSE INVESTING IN US
• Our wind energy production system is worth us for mounting wind turbines
for self-consumption through a cooperative, in which cooperators can hire
installed power, example:
•Among five partners can have a 500kw wind turbine
•Our wind energy production system is also worth us to assemble wind farms,
for third parties, natural persons, companies, municipalities, in short, running
your own business.
•Our society Morcillo wind system which you can take part, your assets will be:
•Construction of wind turbines and their maintenance for the society and for
any natural person.
THE PROJECT AWARDS
• Silver medal at the fair iENA in Nuremberg (Germany).
•Gold Medal for inventors China Club.
•The Poland inventors Club medal.
•Diploma by the Union of inventors of Morocco.
•Grand Prize of the European Association of inventors * AEI *.
•Eureka Prize for innovation 2016 (jury Innova)
•Eureka Prize for innovation 2016 (public Innova)
CONTACT
Sistema Eólico Morcillo S.L.
C/ Jacinto Benavente Nº 3 Cieza - Murcia
B-73757627
Ricardo Morcillo Molina
606372203
Inventor
Carlos Morcillo Penalva
692287441
Gerente
Web: www.energia-eolica.es
Email: [email protected]; [email protected].
Facebook: Sistema Eólico Morcillo
COME AND VISIT US!
VIDEOS
LINK PARK WINDFARM 3D
https://www.youtube.com/watch?v=0aH9jsVViB4
LINK 300KW PROTOTYPE CURRENTLY
www.youtube.com/watch?v=PHoJIIQnhRs
LINK REPORT IN THE CHAIN 7RM
www.youtube.com/watch?v=e7i5tuylkuc
LINK REPORT 2
http://www.rtve.es/alacarta/videos/a-punto-con-la-2/punto-2-inventos-puntoinvento-para-evitar-quedarse-dormido-volante/3506196/

Documentos relacionados