Screenball®
Transcripción
Screenball®
Screenball® schede tecniche_technical sheets_hojas tècnicas prefiniti a misura Screenball® italiano 05_english 15_espagnol 25 prefiniti a misura Screenball® pannello fonoassorbente in medium - density fiberboard certificazioni Screenball® P30F03 misura a camera riverberante dei coefficienti di assorbimento acustico αs di pannellatura secondo le norme UNI EN ISO 354/2003 01 Screenball® reazione al fuoco per parete Classe 1 - Norme UNI 9177 reazione al fuoco per soffitto Classe 1 - Norme UNI 9177 Screenball® P15F03 misura a camera riverberante dei coefficienti di assorbimento acustico αs di pannellatura secondo le norme UNI EN ISO 354/2003 02 03 Screenball® pannello fonoassorbente in medium - density fiberboard certificazioni Screenball® P15F02 misura a camera riverberante dei coefficienti di assorbimento acustico αs di pannellatura secondo le norme UNI EN ISO 354/2003 04 Screenball® P10F02 misura a camera riverberante dei coefficienti di assorbimento acustico αs di pannellatura secondo le norme UNI EN ISO 354/2003 Screenball® pannello fonoassorbente in medium - density fiberboard 05 italiano Superficie esterna carta melamminica - laminati plastici tranciati di legno o precomposti di legno. Superficie interna stessa finitura dell’esterno più tessuto non tessuto autoestinguente del peso di 60 gr/mq Supporto interno doppio pannello in medium density a basso contenuto di formaldeide E1 Reazione al fuoco classe 2 - a richiesta classe 1 Spessore standard mm 18 Nota: Per le finiture in carta melamminica si accettano quantitativi minimi di 100 mq. per quattro finiture standard (acero, faggio, bianco e alluminio). Per laminati plastici, tranciati di legno e precomposti di legno non esistono limitazioni. Dimensioni massime per pannelli in carta melamminica mm 1800 x 300 per parete e controsoffitto mm 600 x 600 per controsoffitto Dimensioni massime per pannelli in laminati plastici, tranciati di legno o precomposti di legno mm 3000 x 300 per parete e controsoffitto mm 600 x 600 per controsoffitto Pream si riserva di valutare singolarmente i quantitativi, le finiture e le dimensioni. Fresature maschio - femmina sui lati lunghi femmina - femmina sui lati corti Percentuali di perforazione Screenball P30 F03 Screenball P15 F03 Screenball P15 F02 Screenball P10 F02 perforazione 10% perforazione 20% perforazione 13% perforazione 20% Peso 11,5 Kg/mq circa 02 sezione A - A 06 305 MDF con superficie esterna 18 sezione B - B MDF con superficie interna + tessuto non tessuto fonoassorbente 305 B A 1800 B 305 A sezione A - A 305 Screenball® schemi di montaggio parete a doghe 07 STOCCAGGIO IN CANTIERE INSTALLAZIONE FASI DI MONTAGGIO: In attesa dell’installazione, Screenball® va lasciato “riposare”, nell’ambiente in cui sarà posato per 24/48 ore senza protezioni e imballi, posizionato orizzontalmente e sollevato dal pavimento, con una umidità media del 50% e in zone ben ventilate. Qualora le condizioni siano particolarmente umide o secche è consigliabile coprire i pannelli con fogli di plastica. La parete Screenball® a doghe, deve essere installata utilizzando montanti 45/18/18 su cui vanno posizionati i ganci per montante a parete. Il tutto va fissato alla parete retrostante con ferramenta adeguata (non fornita). - - - - - - - I montanti vanno posizionato circa ogni 60 cm, e le doghe vanno installate avendo cura di sollevare la prima in basso di alcuni cm dal pavimento, con la possibilità di inserire uno zoccolo di base H.6cm. Per superfici uniformi (senza interruzioni di pareti divisorie o quant’altro) superiori a 70/80 mq, con lati fortemente disuguali, vanno predisposti dei giunti di dilatazione intermedi sui lati con maggiori dimensioni. Pream non è in alcun modo responsabile dello stoccaggio e del montaggio del pannello Screenball®. L’umidità relativa dell’aria con il pannello posato dovrà essere compresa tra il 35% e l’85% e la zona sempre ben ventilata. Si precisa inoltre che non vengono forniti sistemi di fissaggio né per la parete, né per il controsoffitto (tasselli, viti, ecc.). Fissare i profili montante 45/18/18 (2) al muro con ferramenta adeguata (non fornita) ogni 30/60 cm Appoggiare lo zoccolo complanare (4) al pavimento facendo combaciare le asole con i profili Inserire a pressione 1 gancio per fissaggio pannello (3) rovesciato come in figura ‘A’ su ogni profilo montante spingendolo verso il basso fino ad appoggiarlo sullo zoccolo Avvitare i ganci sui profili montante con una vite autoforante (5) Appoggiare il pannello Screenball® sui profili e spingerlo verso il basso facendolo infilare sui ganci Inserire a pressione 1 gancio per fissaggio pannello come in figura ‘B’ su ogni profilo montante, spingendolo verso il basso fino ad infilarlo sul pannello, poi infilare tra un profilo e l’altro la fibra di poliestere Assemblare i pannelli sfalsandoli in verticale 02 08 (1) - PANNELLO SCREENBALL® A PARETE (2) - PROFILO MONTANTE 45/18/18 30 - 60 cm (3) - GANCIO PER FISSAGGIO PANNELLO (4) - ZOCCOLO COMPLANARE H 6 CM (5) - VITE AUTOFORANTE PER FISSAGGIO PRIMO GANCIO FIBRA DI POLIESTERE A 30 - 60 cm B B (1) (2) A (3) (4) (5) Screenball® schemi di montaggio controsoffitto a doghe 09 STOCCAGGIO IN CANTIERE INSTALLAZIONE FASI DI MONTAGGIO: In attesa dell’installazione, Screenball® va lasciato “riposare”, nell’ambiente in cui sarà posato per 24/48 ore senza protezioni e imballi, posizionato orizzontalmente e sollevato dal pavimento, con una umidità media del 50% e in zone ben ventilate. Qualora le condizioni siano particolarmente umide o secche è consigliabile coprire i pannelli con fogli di plastica. Il controsoffitto Screenball® a doghe, deve essere installato utilizzando montanti 50/27/27 su cui vanno posizionati i ganci per montante a soffitto 50/27. Il tutto va appeso parallelamente al soffitto con pendini di acciaio e molle e ganci di regolazione per potere avere il ribassamento desiderato tra il soffitto e il pannello. Il pendinaggio deve essere effettuato sui montanti 50/27/27 ogni 60 cm. Su ogni lato del soffitto vanno messi dei perimetrali a ‘L’ o doppia ‘L’ e i pannelli debbono essere staccati dai perimetrali di circa 10 mm e appoggiati sugli stessi ugualmente di circa 10 mm per assorbire le naturali dilatazioni del materiale. Per superfici uniformi (senza interruzioni di pareti o quant’altro) superiori a 70/80 mq, con lati fortemente disuguali, vanno predisposti dei giunti di dilatazione intermedi sui lati con maggiori dimensioni. L’umidità relativa dell’aria con il pannello posato dovrà essere compresa tra il 35% e l’85% e la zona sempre ben ventilata. Si precisa inoltre che non vengono forniti sistemi di fissaggio né per la parete, né per il controsoffitto (tasselli, viti, ecc.). - - - Pream non è in alcun modo responsabile dello stoccaggio e del montaggio del pannello Screenball®. Fissare i pendini (2) sul solaio con ferramenta adeguata (non fornita), regolare l’altezza tramite la ‘farfalla’ di regolazione (3) e posizionare l’aggancio con molla (5) sul montante 50/27/27 (4) come in figura ‘A’ Inserire 1 gancio per montante (6) rovesciato come in figura ‘B’. appoggiare il controsoffitto Screenball® (1) sui montanti 50/27/27 e spingerlo verso il muro facendolo infilare sui ganci rovesciati Inserire 1 gancio per montante diritto come in figura ‘C’ spingendolo verso il muro fino ad infilarlo sul pannello Fissare il profilo perimetrale di finitura (7) a muro con ferramenta adeguata (non fornita) 10 60 cm (1) - CONTROSOFFITTO SCREENBALL® A DOGHE (2) - COPPIA DI PENDINI REGOLABILI (3) - FARFALLA DI REGOLAZIONE IN ALTEZZA PER PENDINI 60 cm (4) - MONTANTE 50/27/27 (5) - GANCIO CON MOLLA (6) - GANCIO PER MONTANTE 50/27/27 (7) - PROFILO PERIMETRALE DI FINITURA A (2) 60 cm A (5) (3) 60 cm C 60 cm 60 cm (4) B (6) 60 cm 60 cm B C (1) (7) Screenball® schemi di montaggio controsoffitto con struttura in vista ‘t24’/‘silhouette’ 11 STOCCAGGIO IN CANTIERE INSTALLAZIONE FASI DI MONTAGGIO: In attesa dell’installazione, Screenball® va lasciato “riposare”, nell’ambiente in cui sarà posato per 24/48 ore senza protezioni e imballi, posizionato orizzontalmente e sollevato dal pavimento, con una umidità media del 50% e in zone ben ventilate. Qualora le condizioni siano particolarmente umide o secche è consigliabile coprire i pannelli con fogli di plastica. Il controsoffitto Screenball® con struttura in vista, deve essere installato utilizzando portanti e traversini ‘T24’ o ‘Silhouette’ di varie misure da incrociare tra di loro in modo da creare dei moduli da 600X600mm. Su ogni lato del soffitto vanno messi dei perimetrali a ‘L’ o doppia ‘L’ e i pannelli terminali posizionati lungo il perimetro debbono essere staccati dai perimetrali di circa 10 mm e appoggiati sugli stessi ugualmente di circa 10 mm per assorbire le naturali dilatazioni del materiale. Anche i portanti della struttura vanno appoggiati e fissati sui profili perimetrali. - - - - Pream non è in alcun modo responsabile dello stoccaggio e del montaggio del pannello Screenball®. Il pendinaggio deve essere effettuato sui portanti ogni 60cm con pendini e molle di regolazione in acciaio. L’umidità relativa dell’aria con il pannello posato dovrà essere compresa tra il 35% e l’85% e la zona sempre ben ventilata. Si precisa inoltre che non vengono forniti sistemi di fissaggio né per la parete, né per il controsoffitto (tasselli, viti, ecc.). Fissare i pendini (2) sul solaio con ferramenta adeguata (non fornita), ogni 30 cm in verticale e 60 cm in orizzontale; poi regolare l’altezza tramite la ‘farfalla’ di regolazione (3) Agganciare la struttura portante per controsoffitto (4) e i traversini (5) ai pendini Appoggiare il controsoffitto Screenball® (1) sulla struttura dall’alto Fissare il profilo perimetrale di finitura a muro con ferramenta adeguata (non fornita) 12 (1) - CONTROSOFFITTO SCREENBALL® STRUTTURA IN VISTA T24 O ‘SILHOUETTE (2) - COPPIA DI PENDINI REGOLABILI (3) - FARFALLA DI REGOLAZIONE IN ALTEZZA PER PENDINI (4) - STRUTTURA PORTANTE SILHOUETTE XL 15 (5) - TRAVERSINI SILHOUETTE XL 15 (6) - PROFILO PERIMETRALE DI FINITURA (2) 30 cm (3) 60 cm (4) A (1) (6) (5) A Screenball® schemi di montaggio controsoffitto con struttura a scomparsa ‘t24’ 13 STOCCAGGIO IN CANTIERE INSTALLAZIONE FASI DI MONTAGGIO: In attesa dell’installazione, Screenball® va lasciato “riposare”, nell’ambiente in cui sarà posato per 24/48 ore senza protezioni e imballi, posizionato orizzontalmente e sollevato dal pavimento, con una umidità media del 50% e in zone ben ventilate. Qualora le condizioni siano particolarmente umide o secche è consigliabile coprire i pannelli con fogli di plastica. Il controsoffitto Screenball® con struttura a scomparsa, deve essere installato utilizzando portanti ‘T24’ di varie misure da posizionare parallelamente ai lati corti e distanziatori per portanti da 60 cm per irrigidire la struttura. Su ogni lato del soffitto vanno messi dei perimetrali a ‘L’ o doppia ‘L’ e i pannelli debbono essere staccati dai perimetrali di circa 10 mm e appoggiati sugli stessi ugualmente di circa 10mm per assorbire le naturali dilatazioni del materiale. Dato che il pannello viene appoggiato sui perimetrali, gli stessi dovranno essere ribassati di circa 10 mm rispetto ai portanti. Il pendinaggio deve essere effettuato sui portanti ogni 60 cm con pendini e molle di regolazione in acciaio. Per superfici uniformi (senza interruzioni di pareti o quant’altro) superiori a 70/80 mq, con lati fortemente disuguali, vanno predisposti dei giunti di dilatazione intermedi sui lati con maggiori dimensioni. L’umidità relativa dell’aria con il pannello posato dovrà essere compresa tra il 35% e l’85% e la zona sempre ben ventilata. Si precisa inoltre che non vengono forniti sistemi di fissaggio né per la parete, né per il controsoffitto (tasselli, viti, ecc.). - - - - Pream non è in alcun modo responsabile dello stoccaggio e del montaggio del pannello Screenball®. Fissare i pendini (2) sul solaio con ferramenta adeguata (non fornita) ogni 30 cm in verticale e 60 cm in orizzontale, regolare poi l’altezza tramite la farfalla di regolazione (3) Agganciare la struttura portante per controsoffitto (4) ai pendini Appoggiare il controsoffitto Screenball® (1) sulla struttura portante, avendo cura d’infilare prima la sagomatura ‘A’ , poi la sagomatura ‘B’ Fissare il profilo perimetrale di finitura a muro con ferramenta adeguata (non fornita) 14 (1) - CONTROSOFFITTO SCREENBALL® STRUTTURA A SCOMPARSA (2) - COPPIA DI PENDINI REGOLABILI (3) - FARFALLA DI REGOLAZIONE IN ALTEZZA PER PENDINI (4) - STRUTTURA PORTANTE PER CONTROSOFFITTO L 120 cm (5) - PROFILO PERIMETRALE DI FINITURA 30 cm 60 cm A 30 cm (2) (3) 60 cm B B A (4) (1) (5) Screenball® medium - density fiberboard sound absorbing panel 15 english Outer side melamine paper - thin plastic laminate wood veneer or slice wood Sizes (max) for panels with melamine paper mm 1800 x 300 wall and false ceiling mm 600 x 600 false ceiling only Inner side same as outer together with self - extinguishable fabric (gr 60/sq.m) Sizes (max) for panels with thin plastic laminate, wood veneer or slice wood mm 3000 x 300 wall and false ceiling mm 600 x 600 false ceiling only Inner core double medium density panel with low formaldehyde content (class E1) Fire reaction class 2 - class 1 on request Thickness mm 18 Note: Lowest permitted orders: 100 sq.m for panels with melamine paper of the four standard colours (maple, beech, white and aluminium). For panels with thin plastic laminate, wood veneer or slice wood there are no lowest limits. Pream reserves the right to evaluate each purchasing order in terms of quantity, finishing and sizes. Finger joint Male - female by the side of the longest dim. Female - female by the side of the shortest dim. Perforation ratio Screenball P30 F03 Screenball P15 F03 Screenball P15 F02 Screenball P10 F02 perforation 10% perforation 20% perforation 13% perforation 20% Net weigth Kg 11,5 / sq.m about 02 sezione A - A 16 305 MDF with outer side 18 sezione B - B MDF with inner side + self - extinguishable sound absorbing fabric 305 B A 1800 B 305 A sezione A - A 305 Screenball® setting up instructions wall with staves 17 STORAGE SET UP STEP BY STEP: Before set up, Screenball® must be placed in the space where it will be installed at least 24/48 hours before, preferably in well ventilated areas with an average air humidity of 50%. Remove all protective films and packages and place Screenball® horizontally avoiding contact with the floor. If areas are too humid or too dry, it is advisable to protect Screenball® with plastic foils. As a wall with staves Screenball® must be installed using the 45/18/18 posts, on which the hangers for wall must be positioned. Place the structure on the wall at the back using appropriate hardware (not supplied). Posts must be placed every cm 60 and staves must be installed leaving some space between the bottom stave and the floor in order to allow the placement of a 6 cm-base. - - - - - - - In presence smooth surfaces (without discontinuities) above sq.m 70/80 with unbalanced sides, expansion joints must be placed on the longest sides Once the panel is installed, the relative air humidity must be within the range 35-85% and areas must be well ventilated Pream cannot be hold responsible for the stocking and installing of Screenball®. Fix the edges 45/18/18 (2) to the wall using appropriate hardware (not supplied) every 30/60 cm Place the metal shoe (4) on the floor, matching the eyelet with the edges Fit and slide one hook (3) fron top to bottom of each edge. Hooks must be palced upside down as in figure ‘A’. Slide until the hook reaches the aluminium shoe Fix the hooks to each edge using the self-pierced screw (5) Lean Screenball® on the edges pushing until it fasten to the hooks Fit and slide one hook from top to bottom of each edge until it fits into the panel place the polyester fiber between the edges Assemble panels with staggering order Plugs, screw and other fittings are not supplied 02 18 (1) - SCREENBALL® (2) - EDGE 45/18/18 30 - 60 cm (3) - HOOK FOR PANEL (4) - ALUMINIUM SHOE H 6 CM (OPTIONAL) (5) - SELF PIERCING SCREW POLYESTER FIBER A 30 - 60 cm B B (1) (2) A (3) (4) (5) Screenball® setting up instructions false ceiling with staves 19 STORAGE SET UP STEP BY STEP Before set up, Screenball® must be placed in the space where it will be installed at least 24/48 hours before, preferably in well ventilated areas with an average air humidity of 50%. Remove all protective films and packages and place Screenball® horizontally avoiding contact with the floor. If areas are too humid or too dry, it is advisable to protect Screenball® with plastic foils. As a false ceiling with staves frame Screenball® must be installed using the 50/27/27 posts, on which the hangers for ceiling post 50/27 must be positioned. Place the structure on parallel to the ceiling with the hangers and the adjustable steel springs and adjust the distance with the ceiling. L - shaped or double L - shaped edges must be placed on each side of the ceiling and the ending panels must be placed along the perimeter with a distance of about mm 10 from the edges and with a contact surface of mm 10 for possible natural expansion of the material. - - - - In presence smooth surfaces (without discontinuities) above sq.m 70/80 with unbalanced sides, expansion joints must be placed on the longest sides. Pream cannot be hold responsible for the stocking and installing of Screenball®. Once the panel is installed, the relative air humidity must be within the range 35-85% and areas must be well ventilated. Plugs, screw and other fittings are not supplied. Fix the hanging cables (2) on the ceiling using appropriate hardware (not supplied). Adjust height using the fine tuning clip (3) and place the hook with the spring (5) on the frame 50/27/27 (4) as in figure ‘A’ Fit and slide one hook (6) from top to bottom of each edge. Hooks must be placed upside down as in figure ‘B’ Place the ceiling Screenball® (1) on the frame 50/27/27 and push it towards the wall until it fits with reversed hooks Fit and slide one hook as in figure ‘C’ from top to bottom of each edge until it fits into the panel Fix the outer edge to the wall using appropriate hardware (not supplied) 20 60 cm (1) - SCREENBALL® (2) - PAIR OF HANGING CABLES (3) - FINE - TUNING CLIP 60 cm (4) - FRAME 50/27/27 (5) - HOOK WITH SPRING (6) - HOOK FOR FRAME 50/27/27 (7) - BLIND EDGE A (2) 60 cm A (5) (3) 60 cm C 60 cm 60 cm (4) B (6) 60 cm 60 cm B C (1) (7) Screenball® setting up instructions false ceiling with visible frame ‘t24’/‘silhouette’ 21 STORAGE SET UP STEP BY STEP: Before set up, Screenball® must be placed in the space where it will be installed at least 24/48 hours before, preferably in well ventilated areas with an average air humidity of 50%. Remove all protective films and packages and place Screenball® horizontally avoiding contact with the floor. If areas are too humid or too dry, it is advisable to protect Screenball® with plastic foils. As a false ceiling with visible frame Screenball® must be installed using centrepieces and crossbars ‘T24’ or ‘Silhouette’. These must be placed in way to form modules of size mm 600 x 600. L - shaped or double L - shaped edges must be placed on each side of the ceiling and the ending panels must be placed along the perimeter with a distance of about mm 10 from the edges and with a contact surface of mm 10 for possible natural expansion of the material. Centrepieces must be leaned and secured on the edges too. - - - - Hangers and adjustable steel springs must be placed every cm60 in the centrepieces Pream cannot be hold responsible for the stocking and installing of Screenball®. Once the panel is installed, the relative air humidity must be within the range 35-85% and areas must be well ventilated. Plugs, screw and other fittings are not supplied Fix the hanging cables (2) on the ceiling every 30 cm vertical and 60 cm horizontal using appropriate hardware (not supplied). Adjust height using the fine tuning clip (3) Fasten the bearing frame for ceiling (4) and the crossbeams (5) to the hanging cables Place Screenball® (1) on the frame from the top Fix the outer edge to the wall using appropriate hardware (not supplied) 22 (1) - SCREENBALL® (2) - PAIR OF HANGING CABLES (3) - FINE - TUNING CLIP (4) - BEARING FRAME SILHOUETTE XL 15 (5) - CROSSBEAMS SILHOUETTE XL 15 (6) - BLIND EDGE (2) 30 cm (3) 60 cm (4) A (1) (6) (5) A Screenball® setting up instructions false ceiling with rollaway frame ‘t24’ 23 STORAGE SET UP STEP BY STEP Before set up, Screenball® must be placed in the space where it will be installed at least 24/48 hours before, preferably in well ventilated areas with an average air humidity of 50%. Remove all protective films and packages and place Screenball® horizontally avoiding contact with the floor. If areas are too humid or too dry, it is advisable to protect Screenball® with plastic foils. As a false ceiling with visible frame Screenball® must be installed placing the centrepieces ‘T24’ parallel to the short side of the panel and using the spacers for the cm 60 posts to tighten the structure. L - shaped or double L - shaped edges must be placed on each side of the ceiling and the ending panels must be placed along the perimeter with a distance of about mm 10 from the edges and with a contact surface of mm 10 for possible natural expansion of the material. Centrepieces must be leaned and secured on the edges too. Edges must be lowered of mm 10 with respect to the posts, to allow the support of the panel. - - - Hangers and adjustable steel springs must be placed every cm 60 in the centrepieces Pream cannot be hold responsible for the stocking and installing of Screenball®. Once the panel is installed, the relative air humidity must be within the range 35-85% and areas must be well ventilated. Plugs, screw and other fittings are not supplied Fix the hanging cables (2) on the ceiling every 30 cm vertical and 60 cm horizontal using appropriate hardware (not supplied). Adjust height using the fine - tuning clip Fasten the ceiling frame (4) to the cables Place, respectively, model ‘A’ and ‘B’ on the frame Fix the outer edge to the wall using appropriate hardware (not supplied) 24 (1) - SCREENBALL® (2) - PAIR OF HANGING CABLES (3) - FINE - TUNING CLIP (4) - CEILING FRAME W 120 cm (5) - BLIND EDGE 30 cm 60 cm A 30 cm (2) (3) 60 cm B B A (4) (1) (5) Screenball® panel fonoabsorbente de fibra de media densidad 25 espagnol Superficie exterior melamínica - laminado melamínico chapa de madera o madera reconstituida Dimensiones maximas para panel melamínico mm 1800 x 300 para pared y techo mm 600 x 600 para techo Superficie posterior con el mismo acabado que el exterior más tejido autoextinguible (60 gr/m2) Dimensiones maximas para laminado melamínico, chapa de madera o reconstituido de madera mm 3000 x 300 para pared y techo mm 600 x 600 para techo Soporte interior doble panel de ensidad medio con contenido de formaldehído E1 Reacción al fuego clase 2 - a requerimiento clase 1 Espesor Standard 18 mm Nota: En lo que se refiere al acabado melamínico, la cantidad mínima es de 100 m2 para acabados standard como el arce, haya, blanco y aluminio, mientras que para el laminado melamínico, la chapa de madera y el reconsituido de madera no existe limitación. Peam se reserva el derecho de variar puntualmente las cantidades, acabados y dimensiones. Fresado macho - hembra sobre lados largos hembra - hembra sobre lados cortos Porcentaje de perforación Screenball P30 F03 perforación 10% Screenball P15 F03 perforación 20% Screenball P15 F02 perforación 13% Screenball P10 F02 perforación 20% Peso 11,5 Kg/ m2 02 sezione A - A 26 305 MDF más superficie exterior 18 sezione B - B MDF más superficie posterior más tejido autoextinguible 305 B A 1800 B 305 A sezione A - A 305 Screenball® instrucciones para el instalador pared 27 ALMACENAMIENTO EN OBRA INSTALACION FASE DE MONTAJE Antes de la instalación, el panel Screenball® debe ‘reposar’ en el ambiente, en el que se almacenara durante 24/48 horas sin protección ni embalaje, posicionado horizontalmente y elevado del suelo, con una humedad media del 50% y una zona bien ventilada. Cuando las condiciones son húmedas o secas, se recomienda cubrir los paneles con una hoja plástica La pared Screenball® con lamas debera ser instalada utilizando montantes 45/18/18 en los que se colocaran los ganchos para montantes de pared. El conjunto debe de ir fijado a la pared soporte con la herramienta adecuada (no suministrada). Los montantes se colocaran cada 60 cm, y las lamas se instalaran, teniendo cuidado en elevar la primera para que se pueda introducir un zocalo de altura H 6 cm. Para superficies continuas ( sin interrupcion de paredes divisorias, u otras) superiores a 70/80 m2 con lados fuertemente desiguales, se dispondran juntas de dilatación intermedias sobre el lado con mayor dimensión. La humedad relativa del aire con el panel instalado deberá estar comprendida entre el 35 % y el 85 % y la zona siempre bien ventilada. Si se precisa, podemos suministrar sistemas de fijacion para la pared y para el techo. - - - - - - - Pream no es, en ningun modo responsable, del almacenamiento e instalación del panel Screenball®. Fijar el perfil vertical 45/18/18 (2) al muro con herramienta adecuada (no suministrada) cada 30/60 cm. Apoyar el zocalo coplanar (4) al pavimento haciendo encajar el ojal con el perfil. Insertar a presión el gancho para fijar el panel (3) girado como en la figura ‘A’ en cada perfil vertical, empujandolo hacia abajo y apoyandolo en el zócalo. Atornillar el gancho en el perfil vertical con un tornillo autotaladrante. Apoyar el panel Screenball sobre el perfil vertical y empujarlo hacia abajo haciendolo encajar con el gancho. Insertar a presión el gancho para fijación del panel tal y como se indica en la figura ‘B’, en cada perfil vertical, empujandolo hacia abajo, haciendolo encajar en el panel. Posteriormente se encaja entre los perfiles la fibra de poliéster. Ensamblar los paneles. 02 28 (1) - PANEL PARA PARED SCREENBALL® A MEDIDA (2) - PERFIL VERTICAL 45/18/18 30 - 60 cm (3) - GANCHO PARA FIJAR EL PANEL (4) - ZOCALO COPLANAR H.6 cm. (OPCIONAL) (5) - TORNILLO AUTOTALADRANTE PARA FIJAR EL GANCHO FIBRA DE POLIESTER A 30 - 60 cm B B (1) (2) A (3) (4) (5) Screenball® instrucciones para el instalador techo de lamas 29 ALMACENAMIENTO EN OBRA INSTALACION FASE DE MONTAJE Antes de la instalación, el panel Screenball® debe ‘reposar’ en el ambiente, en el que se almacenara durante 24/48 horas sin protección ni embalaje, posicionado horizontalmente y elevado del suelo, con una humedad media del 50% y una zona bien ventilada. Cuando las condiciones son húmedas o secas, se recomienda cubrir los paneles con una hoja plástica El techo Screenball® de lamas debe ser instalado utilizando montantes de 50/27/27 sobre los cuales se posicionan los ganchos para montante 50/27. El conjunto se coloca paralelo al techo con barras de cuelgue y ganchos de regulación para poder tener la distancia deseada entre el techo y el panel. El sistema de cuelgue debe de ser colocado sobre los montantes 50/27/27 cada 60 cm.Sobre cada lado de techo se puede colocar un perfil perimetral ‘L’ o doble ‘L’ y los paneles de remate colocados a lo largo del perímetro deberan estar separados de éste 10 mm para absorber las naturales dilataciones del material. Para superficies continuas (sin interrupcion de paredes divisorias, u otras) superiores a 70/80 m2 con lados fuertemente desiguales, se dispondran juntas de dilatación intermedias sobre el lado con mayor dimensión. La humedad relativa del aire con el panel instalado deberá estar comprendida entre el 35% y el 85% y la zona siempre bien ventilada. Si se precisa, podemos suministrar sistemas de fijacion para la pared y para el techo. - - - - Pream no es, en ningun modo responsable, del almacenamiento e instalación del panel Screenball®. Fijar las varillas (2) al forjado con herramienta adecuada (no suministrada) y regular la altura con la “mariposa” de regulación (3) y posicionar el gancho con resorte (5) sobre el perfil 50/27/27 (4) tal y como se indica en la figura ‘A’. Insertar el gancho para perfil (6) girado tal y como se indica en la figura ‘B’, apoyar el techo Screenball® (1) sobre el perfil 50/27/27 y empujarlo hacia la pared haciendolo encajar sobre el gancho girado. Insertar el gancho para perfil tal y como se indica en la figura ‘C’ empujandolo hacia la pared y encajarlo en el panel. Fijar el perfil perimetral de acabado (7) al muro con la herramienta adecuada (no suministrada). 30 60 cm (1) - TECHO SCREENBALL® EN LAMAS (2) - VARILLA DE REGULACION (3) - ‘MARIPOSA’ DE REGULACION DE ALTURA PARA VARILLA 60 cm (4) - PERFIL 50/27/27 (5) - GANCHO CON RESORTE (6) - GANCHO PARA PERFIL 50/27/27 (7) - PERFIL PERIMETRAL DE ACABADO A (2) 60 cm A (5) (3) 60 cm C 60 cm 60 cm (4) B (6) 60 cm 60 cm B C (1) (7) Screenball® instrucciones para el instalador techo con estructura vista ‘t24’/‘silhouette’ 31 ALMACENAMIENTO EN OBRA INSTALACION FASE DE MONTAJE: Antes de la instalación, el panel Screenball® debe ‘reposar’ en el ambiente, en el que se almacenara durante 24/48 horas sin protección ni embalaje, posicionado horizontalmente y elevado del suelo, con una humedad media del 50% y una zona bien ventilada. Cuando las condiciones son húmedas o secas, se recomienda cubrir los paneles con una hoja plástica El techo Screenball® con estructura vista debe ser instalado utilizando perfiles portantes y trasaños ‘T24’ o ‘Silhouette’ de varias medidas, cruzadas entre ellas , de forma que se cree un módulo de 600x600 mm. Sobre cada lado de techo se puede colocar un perfil perimetral ‘L’ o doble ‘L’ y los paneles de remate colocados a lo largo del perímetro deberan estar separados de éste 10 mm para absorber las naturales dilataciones del material. Tambien el perfil portante de la estructura irá apoyado y fijado sobre el perfil perimetral. El sistema de cuelgue deberá ser realizado sobre la estructura portante cada 60 cm. con varillas de cuelgue y uñas de regulación en acero. La humedad relativa del aire con el panel instalado deberá estar comprendida entre el 35% y el 85% y la zona siempre bien ventilada. Si se precisa, podemos suministrar sistemas de fijacion para la pared y para el techo. - - - - Pream no es, en ningun modo responsable, del almacenamiento e instalación del panel Screenball®. Fijar las varillas (2) al forjado con herramienta adecuada (no suministrada) cada 30 cm. en vertical y 60 cm. en horizontal. Después regular la altura con la ‘mariposa’ de regulación (3). Enganchar la estructura portante para el techo (4) a los travesaños (5) y a las varillas. Apoyar el techo Screenball® (1) en la estructura. Fijar el perfil perimetral de acabado al muro con la herramienta adecuada (no suministrada). 32 (1) - TECHO SCREENBALL® 60 X 60 cm PARA PERFIL VISTI SILHOUETTE XL 15 (2) - VARILLA DE REGULACION (3) - ‘MARIPOSA’ DE REGULACION DE ALTURA PARA VARILLA (4) - ESTRUCTURA PORTANTE SILHOUETTE XL 15 (5) - TRAVESAÑO SILHOUETTE XL 15 (6) - PERFIL PERIMETRAL DE ACABADO (2) 30 cm (3) 60 cm (4) A (1) (6) (5) A Screenball® instrucciones para el instalador techo para perfil oculto ‘t24’ 33 ALMACENAMIENTO EN OBRA INSTALACION FASE DE MONTAJE Antes de la instalación, el panel Screenball® debe ‘reposar’ en el ambiente, en el que se almacenara durante 24/48 horas sin protección ni embalaje, posicionado horizontalmente y elevado del suelo, con una humedad media del 50% y una zona bien ventilada. Cuando las condiciones son húmedas o secas, se recomienda cubrir los paneles con una hoja plástica El techo Screenball® para perfil oculto debera ser instalado utilizando portantes ‘T24’ de varias medidas con el fin de posicionar paralelamente a los lados cortos, colocando los distanciadores cada 60 cm. para rigidizar la estructura. Sobre cada lado de techo se puede colocar un perfil perimetral ‘L’ o doble ‘L’ y los paneles de remate colocados a lo largo del perímetro deberan estar separados de éste 10 mm para absorber las naturales dilataciones del material. Dado que el panel esta apoyado sobre el perfil perimetral, éste debera ser bajado 10 mm. Para superficies continuas (sin interrupcion de paredes divisorias, u otras) superiores a 70/80 m2 con lados fuertemente desiguales, se dispondran juntas de dilatación intermedias sobre el lado con mayor dimensión. La humedad relativa del aire con el panel instalado deberá estar comprendida entre el 35% y el 85 % y la zona siempre bien ventilada. Si se precisa, podemos suministrar sistemas de fijacion para la pared y para el techo. - - - - Pream no es, en ningun modo responsable, del almacenamiento e instalación del panel Screenball®. Fijar las varillas (2) al forjado con herramienta adecuada (no suministrada) cada 30 cm en vertical y 60 cm. en horizontal. Después regular la altura con la ‘mariposa’ de regulación (3). Enganchar la estructura portante para el techo (4) a las varillas. Apoyar el techo Screenball® (1) en la estructura teniendo cuidado de encajar primero el perfil ‘A’ y después el perfil ‘B’. Fijar el perfil perimetral de acabado al muro con la herramienta adecuada (no suministrada). 34 (1) - TECHO SCREENBALL® 60 X 60 cm PARA PERFIL OCULTO (2) - VARILLA DE REGULACION (3) - ‘MARIPOSA’ DE REGULACION DE ALTURA PARA VARILLA (4) - ESTRUCTURA PORTANTE PARA TECHO L.120 cm (5) - PERFIL PERIMETRAL DE ACABADO 30 cm 60 cm A 30 cm (2) (3) 60 cm B B A (4) (1) (5) Alessandra Morcella design_stampa Grapho 5 - settembre 2007 Via Flaminia, 46_61030 Montefelcino (PU)_S.S. Flaminia Km 262 61034 Fossombrone (PU)_Tel. 0721.74 32 1_Fax 0721.74 32 21 www.pream.it - [email protected]