Estabilización de taludes
SNUFF MILLS, GB
SNUFF MILLS
Estabilización de taludes
Proyecto
Lugar
País / Región
Snuff Mills
Frenchay, Bristol
Gran Bretaña
Año de instalación:
2001
Cliente
Ingeniería:
Contratista
Bristol City Council - Neighbourhood and Housing Services
Bristol City Council
BAM Ritchies / BAM Nuttall Ltd.
Situación
A commercial building within an old quarry was at risk of falling rocks from the
back wall of the quarry.
Descripción
A total number of 44 rock bolts and 4 anchors were installed at height into a
sub-vertical to overhanging cliff. 420 m² of high tensile TECCO ® G65/3 steel mesh
was installed to work with the rock bolts. These ranged in length between 3 and
12 [m] and the anchors were between 8 and 12 m. As the works were generally
greater than 6 m in height above ground level, supplementary man access via
ropes or mobile elevating work access platform was used. The low weight of
®
TECCO G65/3 mesh rolls was ideal for this project.
Objeto protegido
Sistemas
Edificio
TECCO ® G65/3
Protección contra la corrosión
GEOBRUGG SUPERCOATING ®
titel_projekt_geologie
Sandstone.
Área estabilizada
420 m²
Altura del talud
Inclinación del talud
10 m
70 ° - 80 °
Medida de protección
Estabilización activa del talud
Exposición
-
Estabilización de taludes | Snuff Mills, GB
2/4
Fully installed TECCO® SYSTEM³
Rope access techniques were used to install the TECCO®
SYSTEM³
View on the works as the TECCO® SYSTEM³ spike plates
type P33/40 were being installed.
Estabilización de taludes | Snuff Mills, GB
3/4
Si tiene preguntas por favor póngase en contacto con nuestro especialista Geobrugg en su área:
Eberhard Gröner
Project Manager North-West Germany, Regional Manager UK
Teléfono +41 71 466 81 57
Móvil +41 79 421 17 01
[email protected]
Geobrugg AG
Aachstrasse 11 | 8590 Romanshorn | Suiza
[email protected] | www.geobrugg.com
A company of the BRUGG Group | Certified to ISO 9001