Open House - SH71 Express Project
Transcripción
Open House - SH71 Express Project
Open House Summary Report March 24, 2015 K Strategies Group www.sh71express.com I 1-844-202 -7830 SH 71 Express Project Open House The State Highway 71 is one of Austin’s most important roadways connecting drivers to the Austin-Bergstrom International Airport (ABIA), the city of Bastrop and other central Texas communities. The purpose of this project is to enhance mobility along the corridor in a safe, efficient and reliable manner. The SH 71 Express Project is a 3.9-mile limited-access toll road beginning near Presidential Boulevard at ABIA and extending east, ending at SH 130 near Onion Creek. The project will include two new toll lanes, new bridges over FM 973 and SH 130, and ramps between the toll lanes and mainlanes of SH 71 and SH 130. In addition, Presidential Boulevard and FM 973 will be widened. Date, Time and Location: Tuesday, March 24, 2015 4:30 – 7 p.m. Del Valle Opportunity Center 5301-B Ross Rd., Del Valle, TX 78617 Project Team Attending the Event ! ! ! ! ! ! ! ! ! ! ! ! Lisa Rainosek, TxDOT, Strategic Projects Division Christopher Bishop, TxDOT Austin, Public Information Officer Doise Miers, TxDOT, Public Involvement (PI) Specialist Elizabeth Story, Atkins Dan Freeman, Atkins Carol Fajkus, Atkins, SH 71 Website Coordinator Cynthia Coss, HNTB, PI Representative Bruce Dinkheller, Jacobs Jeff Billows, McCarthy, Project Director Jennifer Williams, ABIA Katrina Keyes, SH 71 PI Advisor Jenny Paredes, SH 71 PI Manager Attendance: Fifty-nine attendees at the Open House registered their attendance on the sign-in sheet. Copies of the sign-in sheets can be found in Appendix A. Purpose: The purpose of the event was to introduce the construction phase of the project, and inform residents, businesses, commuters and the general public about construction activities, schedule and ways to stay connected with the project. 2 Open House Notifications: Multiple forms of advertising were used to promote the SH 71 Express Open House: ! An English and Spanish flier invitation was sent to stakeholders on the project contact database on March 3, 11, 17 and 23 through e-blasts. The invitation was also posted weekly on Twitter and on the project website: www.sh71express.com ! A courtesy invitation letter was sent to Elected Officials on March 10 through personalized e-blasts. ! A media advisory was sent to local media on the project contact base on March 20. ! The open house was also promoted by posting the flier invitation in 10 public places around the project area, including schools, libraries and post office. List of public places where the flier invitation was posted can be found in Appendix C. ! Dynamic Message Signs were displayed one week before the event at the intersection of SH 71 and FM 973, and at the intersection of SH 71 and Ross Road. Open House Overview The SH 71 Express Open House used a come-and-go format that allowed attendees to review materials and speak to the project team at their convenience. A packet of information was distributed at the Welcome/Registration table and attendees were given the opportunity to sign up for the project mailing list. The project overview flier, newsletter, and FAQs were also available to attendees in both English and Spanish. All of the event materials were made available on the project website for those who were unable to attend the open house. Copies of the meeting materials, presentation and exhibits can be found in Appendix B. Informational boards were displayed around the room providing information to attendees about the project facts, improvements, and construction details. Boards with conceptual renderings and a project map were also available for viewing. In addition, three large schematics were displayed to show the project in detail. Project representatives from McCarthy, TxDOT and the Mobility Authority were available for questions. No formal presentation was given. A looped presentation was displayed during the entire meeting. The same presentation was also available in Spanish for Spanish speaking audiences. Both versions of the presentation are available at the project website and at the Mobility Authority Youtube channel. Photographs taken at the Open House are provided in Appendix D. Comments Questions and comments focused on construction of the project, project limits, specific areas affected by construction, and tolling. The open house concluded at 7 p.m 3 Appendix A Sign-‐In Sheets Appendix B Open House Materials Newsletter Edition 1 – March 2015 IN S I D E R SH Expr Pro Edition 1. March 2015 Construction area SH 71 Express Project SH 71 Express Project Building for the Future State Highway 71 (SH 71) is one of Austin’s most important and vital roadways connecting drivers to the Austin-Bergstrom International Airport (ABIA), the city of Bastrop and other central Texas communities. The SH 71 Express Project is a planned 3.9-mile limited-access toll road beginning at Presidential Boulevard at ABIA and extending east, ending at SH 130 near Onion Creek. The project will include two new toll lane overpasses at Farm-to-Market (FM) 973 and SH 130. Construction started in early 2015 and is scheduled to be completed in late 2016. The SH 71 Express Project will address growing traffic and commuter needs by enhancing safety and reducing congestion and travel-time. The $149 million design-build roadway construction project is a collaboration between the Texas Department of Transportation, the Central Texas Regional Mobility Authority and McCarthy Building Companies. Improvements will include two new toll lanes (one in each direction), bridges over FM 973 and SH 130, connecting ramps between the new toll lanes and the mainlanes of SH 71 and SH 130, widening of SH 71 in the corridor and enhancements to pedestrian and bicycle facilities. In this Issue Building for the Future...............................................1 SH 71 Before and After.............................................. 2 Meet the Team............................................................. 3 Open House ................................................................. 3 SH 71 Breaks Ground ................................................. 5 SH 71 Beginning Construction ................................ 6 DBE Opportunities ..................................................... 7 TxTAG ............................................................................. 8 1 Current view of SH 71 Future FM 973 Current view of FM 973 State Highway 71 Before & After Stretching 253 miles from southeast Texas to central Texas, State Highway (SH) 71 has been connecting Texas communities for decades. Beginning in 1996, the Austin corridor of the state highway, known to locals as Ben White Boulevard, has seen major enhancements. The SH 71 Express Project will continue these improvements by bringing travel options to east Austin. It is vital that our roadways continue to grow with the Texas communities they serve, and SH 71 is a major piece to continue economic development and much-needed accessibility in central Texas. For over 15 years, Austin has seen vast improvements to SH 71, and the SH 71 Express Project will continue this legacy by bringing safe and seamless travel solutions to the east of Austin. 2 Future SH 71 Eastbound and Westbound Toll Roads Currently, travelers face long travel times, congestion and multiple red lights in the nearly four-mile project corridor. The SH 71 Express Project will give travelers an option for a quicker route with the addition of the two toll lanes and bridges over Farm-to-Market (FM) 973 and SH 130. Travelers will also be able to easily access SH 130 and the mainlanes of SH 71 with the construction of new ramps. In addition to the toll lanes, widening of SH 71, along with portions of FM 973 and the Onion Creek Bridge will make the existing roadways safer. We are also addressing challenges for people who wish to walk and ride their bike in the corridor. With the SH 71 Express Project, pedestrian and bicycle travelers will see improvements to facilities on the south side of SH 71. The enhanced paths will allow for easier pedestrian access to facilities and businesses along FM 973, SH 130 and SH 71, including the airport. Meet the Team The $149 million design-build project is possible because of the collaboration between the Texas Department of Transportation, the Central Texas Regional Mobility Authority and McCarthy Building Companies. These organizations and companies are a natural partnership because of their dedication to bettering Austin and central Texas through improved transportation systems. The innovative team brings invaluable knowledge and expertise to the SH 71 Express Project. Texas Department of Transportation The Texas Department of Transportation (TxDOT) is responsible for maintaining 80,000 miles of road and for supporting aviation, rail and public transportation across the state. TxDOT uses federal funds combined with state gas tax revenue and other funding sources to implement the statewide transportation program. TxDOT is reponsible for the SH 71 Express Project and is in coordination with the Central Texas Regional Mobility Authority, who will operate and maintain the toll lanes when they are open. Central Texas Regional Mobility Authority Open House McCarthy Building Companies, in association with the Texas Department of Transportation and the Central Texas Regional Mobility Authority, invite you to attend an Open House* for local residents, businesses, commuters, stakeholders and the general public to learn about the construction of the SH 71 Express Project, and to speak with project representatives. Tuesday, March 24, 2015 4:30 - 7 p.m. Del Valle Opportunity Center 5301-B Ross Rd. Del Valle, TX 78617 The Central Texas Regional Mobility Authority (Mobility Authority) is an independent government agency created in 2002 to improve the transportation system in Williamson and Travis counties. The Mobility Authority’s mission is to implement innovative, multi-modal transportation solutions that reduce congestion and create transportation choices that enhance quality of life and economic vitality. The Mobility Authority is responsible for tolling operations of SH 71 Express. McCarthy Building Companies, Inc. McCarthy Building Companies, Inc., the nation’s ninth largest domestic general contractor (Engineering NewsRecord, May 2014), has been working closely with its design partner LAN, Inc. to develop the most costeffective design solution for the SH 71 Express Project. McCarthy is using a multi-phased approach to construct the new SH71 Express Project, with an emphasis on maintaining safe traffic flow through the corridor and minimizing impact to adjacent businesses and the Austin-Bergstrom International Airport. Del Valle Opportunity Center Event Location Driving on Ross Rd. from SH 71, the Del Valle Opportunity Center is located on the east side (left hand side). *The event will be an open house format, and there will be no formal presentation. Information provided during the open house will be available on the project website at www.sh71express.com. 3 The SH 71 Express Project Breaks Ground Eddie Rodriguez Texas State Representative Jim Smith, Director of Aviation ABIA 4 Retired Lt. Gen. Joe Weber TxDOT Executive Director Ray Wilkerson Chairman, Mobility Authority From left to right: Jim Smith, Director of Aviation, ABIA; Mike Heiligenstein, Executive Director, Mobiliy Authority; Kurt Knebel, VP of Civil Operations, McCarthy; Russell Zapalac, CPPO, TxDOT; Ray Wilkerson, Chairman, Mobility Authority ; Retired Lt. Gen. Joe Weber, Executive Director, TxDOT; David Armbrust, Board of Directors Member, Mobility Authority; James H. Mills, Vice Chairman of the Board of Directors, Mobility Authority. O n January 27, 2015, the Texas Department of Transportation (TxDOT), the Central Texas Regional Mobility Authority and McCarthy Building Companies celebrated the start of construction on the State Highway 71 Express Project. Guests from U.S. Senate offices, State Representative offices, the City of Austin, and AustinBergstrom International Airport gathered to mark the start of important traffic improvements coming to Austin. Emcee Russell Zapalac, Chief Planning and Project Officer at TxDOT starting the remarks at the SH 71 Express Project Groundbreaking. TxDOT Chief Planning and Project Officer, Russell Zapalac, welcomed guests to the event and discussed the importance of the project. Speakers included State Representative Eddie Rodriguez, District 51; Retired Lt. Gen. Joe Weber, executive director of TxDOT; Ray Wilkerson, chairman, Mobility Authority Board of Directors; Jim Smith, director of aviation, Austin-Bergstrom International Airport; and Kurt Knebel, vice president of civil operations, McCarthy Building Companies. The overall theme of the event was collaboration, along with economic development and growth made possible through the project. SH 71 Express will lend a hand to the continued economic growth of central Texas by creating a safer and seamless route that will help connect communities, industries and businesses in the area. Speakers also referenced the need for an improved SH 71 due to exponential growth at the airport. As carriers continue to bring flights to Austin, the need for easy access will become more evident. From left to right: Mike Heiligenstein, executive director, Mobility Authority; Retired Lt. Gen. Joe Weber, executive director, TxDOT; Ray Wilkerson, Chairman, Mobility Authority; Kurt Knebel, VP of Civil Operations, McCarthy. “Over100 people move to Central Texas each day. The SH 71 Express Project will be beneficial to the area and to Austin-Bergstrom International Airport.” ~ State Rep. Eddie Rodriguez 5 The SH 71 Express Project Begins Construction Opportunities The SH 71 Express Project team is excited to start construction. Commuters will first begin to see construction along the State Highway 71 frontage roads. Before any visible construction begins, the team will reroute pedestrian traffic, relocate utilities and perform alignment on the frontage road. Construction Milestones Phase one of construction will include widening of Onion Creek Bridge, as well as construction of the SH 130 overpass, Presidential Boulevard intersection and Spirit of Texas intersection. The construction of phase one will play a large role in the overall SH 71 Express Project. Milestones will be reached at every stage of the project, which is scheduled for completion in late 2016. Dec. 2015 Traffic switch on SH 71 to new eastbound frontage road DE C. 2 01 5 DE C. 2 01 5 AP RIL 20 16 JUN E2 01 6 Dec. 2015 Opening of SH 130 Overpass April 2016 Completion of FM 973 Bridge June 2016 Completion of SH 71 westbound frontage road Late 2016 Project completion LAT E2 01 6 Stay Updated! Construction updates are available online at www.SH71Express.com While visiting the project website, you can also sign up to receive the e-newsletter, which addresses lane closures, change in traffic and other important updates. You may also follow along on Twitter @SH71_Express 6 The SH 71 Express Project team is dedicated to providing opportunities to Disadvantaged Business Enterprise (DBE) firms throughout the $149 million designbuild project. The team will continuously implement an effective strategy to increase the number of bid opportunities for Texas-based DBE firms. The SH 71 Express Project DBE Program kicked-off in November 2014 with an informational meeting. The event gave DBE contractors a chance to network with members of the team, learn more about contract opportunities and the DBE Training Program. Attendees were given information about the project including the scope of work, the construction schedule and renderings of the improvements. The DBE Program continued in January with the Heavy Highway Capacity Building Workshop hosted by TxDOT. Elizabeth Boswell, ESB Consulting, led the two-day workshop that informed DBE firms about the process of working with TxDOT. The workshop explored such things as TxDOT’s organizational structure, bid item pricing, associated cost components, obtaining contract opportunities and phases of TxDOT contracts. In April 2015, the SH 71 Express Project DBE Program will offer a unique opportunity for contractors involved in carpentry and earthwork. McCarthy Building Companies will provide professional job training for two selected contractors as part of the program. s for DBE Firms Texas-based DBE contractors that have expertise in the fields of carpentry and earthwork will be invited to submit applications beginning in April 2015. A selection process will follow with work beginning in June 2015 for the selected contractors. Those interested in the job training program may contact Veronica Murphy, SH 71 Express Project DBE coordinator, by email at [email protected], or the project hotline at 1-844-202-7830. Ruben Landa, DBE Administrator, providing information to attendees at the SH 71 Express Kick-Off Meeting. Attendees during the Heavy Highway Capacity Building Workshop in January 2015. Bid Opportunities Asphalt Paving Bridge Bearings Bridge Deck Sealing Bridge Deck Surface Treatment Bridge Equipment Bridge Fencing Bridge Formwork Bridge Grinding Compost Concrete Cure Materials Concrete Mow Strip Concrete Pumping Concrete Ready Mix Construction Supplies Crash Cushions Demolition Design Support Document Shredding Drainage (inlets/RCP) Erosion Control Facilities – Electrical Fiber Expansion Joint Materials Field Office Trailers Field Waste Disposal Frame and Grates Geotechnical Drilling Guard Rail Inspection Jack & Bore Janitorial Maintenance Metal Beam Guard Rail Metal Pipe Metal Railing Milling Miscellaneous Concrete Work Mowing MSE Inlets and Grates Office Interior Construction Office Supplies Painting Pavement Markings Paving Chairs Permanent Attenuators Photography Plotting Supplies Precast Concrete Rail PVC Pipe Railing and Fencing Reinforced Concrete Pipe Reinforcing Steel Safety and Training Saw and Deal Sealed Expansion Joints Security Services Seeding and Sodding Service Equipment Sidewalk and Curb Slipform Barrier Rail Small Tools Soil Nail/Shortcrete Stamped Concrete Structural Field Welding Sweeping Telecommunications Temp Shoring Materials Temporary Yard Fencing Tie Bars Traffic Barrier Traffic Control Supply Traffic Striping Trucking Utility Design Utility Relocation Waterproofing List of bid opportunities is subject to change For more information on DBE Opportunities please contact: Ruben Landa DBE Administrator 1-844-202-7830 - [email protected] Veronica Murphy DBE Coordinator 1-844-202-7830 - [email protected] 7 Have a Question or Comment? Contact us through our website or hotline to learn more about the SH 71 Express Project, the construction project dedicated to improving mobility in Austin Project Hotline 1-844-202-7830 Project Website www.sh71express.com TxTAG • TxTag makes paying tolls simple and fast. There’s no stopping or slowing down to pay, no waiting in line at a toll booth, and no searching for change on toll roads across Texas. • The thin TxTag sticker goes on the inside of your windshield behind your rearview mirror. An electronic reader above the toll roads sends a signal to the microchip inside the sticker, and tolls are automatically deducted from your prepaid TxTag account. • TxTag works like a prepaid phone card or gift card. With a TxTag account, you prepay your tolls. You can easily check your toll expenses and account balance or make payments to your account online or by phone. • TxTAG customers receive a 25% discount over Pay By Mail rates. • TxTag is accepted on toll roads throughout the state. Toll roads in central Texas also accept toll tags from Dallas (Toll Tag) and Houston (EZ Tag). Twitter @SH71_Express For additional information contact Jenny Paredes, Public Relations Specialist at www.sh71express.com/contact For tolling related questions contact Rick L’Amie at the Central Texas Regional Mobility Authority by calling 512-996-9778 8 Learn More About Visit www.txtag.org to find out more, sign up, or manage your TxTAG Account. IN S I D E R SH Expr Pro Edición 1. Marzo 2015 Área de construcción del Proyecto SH 71 Express Proyecto SH 71 Express Construyendo para el Futuro La Carretera Estatal 71 (SH 71) es una de las carreteras más importantes de Austin, la cual brinda acceso al Aeropuerto Internacional Austin-Bergstrom (ABIA), a la ciudad de Bastrop y a otras comunidades en el centro de Texas. El Projecto SH 71 Express es una autopista de peaje de 3.9 millas de acceso limitado, la cual comienza en Presidential Boulevard, cerca de ABIA, y se extiende hacia el este, terminando en la SH 130, cerca de Onion Creek. El proyecto, cuya construcción empezó a inicios de 2015 y se espera que sea finalizada a fines de 2016, incluirá dos nuevos carriles de peaje, y nuevos puentes a la altura de las carreteras FM 973 y SH 130. El Proyecto SH 71 Express abordará las crecientes necesidades de tráfico y desplazamiento mejorando la seguridad y reduciendo la congestión y tiempo de viaje para los conductores. Este proyecto, de $149 millones de dólares, es una colaboración entre el Departamento de Transporte de Texas, la Autoridad de Movilidad Regional del Centro de Texas y McCarthy Building Companies. Las mejoras incluirán dos nuevos carriles de peaje (uno en cada dirección), puentes sobre las carreteras FM 973 y SH 130, rampas de conexión entre los nuevos carriles de peaje y las pistas principales de las SH 71 y SH 130, ampliación de la SH 71 y mejora del acceso para bicicletas y tránsito peatonal. En esta edición Construyendo para el Futuro....................................1 SH 71 Antes y Después............................................... 2 Conozca al Equipo....................................................... 3 Jornada de Puertas Abiertas.................................... 3 SH 71 Inicia la Construcción ..................................... 5 Comienzo de la Construcción del SH 71 ............... 6 Oportunidades para DBE .......................................... 7 TxTAG .............................................................................. 8 1 Vista actual de la SH 71 Futura FM 973 Vista actual de la FM 973 Carretera Estatal 71 Antes & Después Cubriendo 253 millas desde el sureste hasta el centro de Texas, la carretera estatal (SH) 71, ha servido de conexión entre las comunidades de Texas por décadas. Desde inicios de 1996, la carretera estatal de Austin, conocida por los lugareños como Ben White Boulevard, ha visto grandes mejoras, las cuales serán continuadas por el Proyecto SH 71 Express, el cual proporcionará razonables opciones de viaje al área este de Austin. Es vital que nuestras carreteras continuen creciendo junto con las comunidades de Texas a las que sirven, y la SH 71 es una pieza clave para continuar con el desarrollo económico y con el muy necesario acceso a las diferentes comunidades en el centro de Texas. Por más de 15 años, Austin ha visto grandes mejoras en la SH 71, y el Proyecto SH 71 Express continuará 2 Futuras pistas de peaje al este y oest de la SH 71 este legado, brindando opciones de viaje seguras y continuas. Actualmente, los conductores enfrentan largos períodos de tiempo manejando, además de congestión y múltiples luces rojas en las casi cuatro millas de la carretera 71. El Proyecto SH 71 Express brindará a los conductores una opción que les permita contar con una ruta más corta, al adicionar dos carriles de peaje y puentes sobre las carreteras FM 973 y SH 130. Asimismo, gracias a la construcción de nuevas rampas, los conductores contarán con un fácil acceso a la SH 130 y a las pistas principales de la SH 71. Además de los carriles de peaje, la ampliación de la SH 71 junto con algunas secciones de la FM 973 y del Puente de Onion Creek, brindarán mayor seguridad a las carreteras existentes. Los peatones y ciclistas también se verán beneficiados con las mejoras a realizarse en el área sur de la SH 71, ya que estas les brindarán acceso, de manera más fácil, a las instalaciones y negocios ubicados a lo largo de las carreteras FM 973, SH 130 y SH 71, incluído el Aeropuerto Internacional Austin-Bergstrom. Conozca al Equipo Este proyecto de diseño-construcción de $149 millones de dólares es posible gracias al trabajo de colaboración entre el Departamento de Transporte de Texas, la Autoridad de Movilidad Regional de Centro de Texas y McCarthy Building Companies. Gracias a su dedicación a mejorar Austin y el centro de Texas a través del desarrollo de los sistemas de transporte, estas organizaciones y empresas conforman una sociedad ideal, aportando invaluable conocimiento y experiencia al Proyecto SH 71 Express. Departamento de Transporte de Texas El Departamento de Transporte de Texas (TxDOT) es responsable por el mantenimiento de 80,000 millas de carreteras y el apoyo a las áreas de aviación, ferrocarriles y transposrte público del estado. TxDOT usa fondos federales combinados con ingresos fiscales estatales del gas del estado y otras fuentes de financiamiento para implementar el programa de transporte en todo el estado. TxDOT es responsable del Proyecto SH 71 Express y trabaja en coordinación con la Autoridad de Movilidad Regional del Centro de Texas, quien estará a cargo de la operación y mantenimiento de los carriles de peaje cuando estos estén abiertos al público. Autoridad de Movilidad Regional del Centro de Texas La Autoridad de Movilidad Regional del Centro de Texas (Autoridad de Movilidad) es una agencia gubernamental independiente creada en el 2002 con el fin de mejorar el sistema de transporte en los condados de Williamson y Travis. La misión de la Autoridad de Movilidad es implementar soluciones innovadoras de transporte multimodal que reduzcan la congestión y brinden opciones de transporte que mejoren la calidad de vida y la vitalidad económica. La Autoridad de Movilidad es responsable de las operaciones del sistema de peaje de la SH 71 Express. McCarthy Building Companies, Inc. McCarthy Building Companies, Inc., el noveno contratista general a nivel nacional (Engineering News-Record, Mayo 2014), ha venido trabajando muy de cerca con la compañía LAN, su socio de diseño, para desarrollar la solución de diseño más rentable para el Proyecto SH 71 Express. McCarthy esta usando un enfoque multifase en la construcción del nuevo Proyecto SH 71 Express, poniendo énfasis en la seguridad del tráfico a lo largo de la carretera, y en la minimización del impacto en los negocios adyacentes y en el aeropuerto. Jornada de Puertas Abiertas El Departamento de Transporte de Texas y la Autoridad de Movilidad Regional del Centro de Texas, en colaboración con McCarthy Building Companies, invitan a los residentes locales, dueños de negocios, transeúntes y público en general, a participar en la Jornada de Puertas Abiertas, en la cual podrán informarse sobre el Proyecto SH 71 Express, y conversar con el equipo del proyecto. Martes, 24 de marzo de 2015 4:30 - 7 p.m. Del Valle Opportunity Center 5301-B Ross Rd. Del Valle, TX 78617 Del Valle Opportunity Center Sitio del Evento Del Valle Opportunity Center está ubicado en el lado este (a su mano izquierda) si viene manejando en Ross Rd. desde SH 71, con dirección al sur. La jornada de puertas abiertas permitirá a los particpantes entrar y salir del evento, revisar los materiales disponibles y conversar con el equipo del proyecto de acuerdo a su conveniencia. No se realizará una presentación formal. Las personas que no puedan participar en la reunión, podrán encontrar la información presentada durante el evento en la página de internet del proyecto. 3 El Proyecto SH 71 Express Inicia la Construcción Eddie Rodriguez Representante del Estado de Texas Jim Smith, Director de Aviación ABIA 4 General Retirado Joe Weber Director EjecutivoTxDOT Ray Wilkerson Presidente, Autoridad de Movilidad De izquierda a Derecha: Jim Smith, Director of Aviación, ABIA; Mike Heiligenstein, Director Ejecutivo, Autoridad de Movilidad; Kurt Knebel, Vicepresidente de Operaciones Civiles, McCarthy; Russell Zapalac, CPPO, TxDOT; Ray Wilkerson, Presidente, Autoridad de Movilidad; General Retirado Joe Weber, Director Ejecutivo, TxDOT; David Armbrust, Miembro de la Junta Directiva, Autoridad de Movilidad; James H. Mills, Vicepresidente de la Junta Directiva, Autoridad de Movilidad. E l 27 de enero de 2015, el Departamento de Transporte de Texas (TxDOT), la Autoridad de Movilidad Regional de Centro de Texas y McCarthy Building Companies celebraron el inicio de la construcción del Proyecto SH 71 Express. Invitados del Senado de los Estados Unidos, oficinas representativas del estado, del Ayuntamiento de Austin y del Aeropuerto Internacional Austin-Bergstrom, se reunieron para conmemorar el inicio de las importantes mejoras de tráfico a suceder en Austin. Russell Zapalac, maestro de ceremonias, jefe de planificación y director de proyectos de TxDOT iniciando el evento de incio de la construcción del Proyecto SH 71 Express. El jefe de planifiación y director de proyectos de TxDOT, Russell Zapalac, dio la bienvenida a los invitados y discutió la importancia del proyecto. Entre los oradores invitados estuvieron el representante estatal Eddie Rodriguez, el general retirado Joe Weber, presidente ejecutivo de TxDOT, Ray Wilkerson, presidente de la Autoridad de Movilidad, Jim Smith, director de aviación del Aeropuerto Internacional AustinBergstrom, y Kurt Knebel, vicepresidente de operaciones civiles de McCarthy Building Companies. El tema general del evento fue la colaboración, el desarrollo económico y crecimiento hechos posible gracias al Proyecto SH 71 Express, el cual será una pieza fundamental en el crecimiento económico del centro de Texas, al permitir la creación de una ruta más segura que conectará las comunidades, industrias y empresas del área. Los oradores también hicieron referencia a que, debido al incremento de vuelos aéreos a Austin, cada vez se hace más evidente la necesidad de mejoras en la actual SH 71. De izquierda a derecha: Mike Heiligenstein, Director Ejecutivo de la Autoridad de Movilidad; General Retirado Joe Weber, Director Ejecutivo de TxDOT; Ray Wilkerson, Presidente de la Autoridad de Movilidad; Kurt Knebel, Vicepresidente de Operaciones Civiles de McCarthy Building Companies. “Más de cien personas viajan cada día en el centro de Texas. El Proyecto SH 71 Express brindará un gran beneficio al área y al Aeropuerto Internacional Austin-Bergstrom”. ~ Eddie Rodriguez, Representante Estatal 5 El Proyecto SH 71 Express Inicia la Construcción Oportunidades p El equipo del Proyecto SH 71 Express está muy entusiasmado con el inicio de la construcción del proyecto. Los transeúntes del área pronto empezarán a ver signos de construcción a lo largo de las vías de servicio de la SH 71. Antes de iniciar cualquier construcción visible al público, el equipo desviará el tráfico peatonal, reubicará los servicios públicos y alineará la vía de servicio. Etapas de la Construcción La primer fase de construcción incluye la ampliación del Puente de Onion Creek y la construcción del paso elevado en la SH 130 y de la intersección ubicada en Presidential Boulevard y Spirit of Texas. Esta primera fase juega un papel muy importante en desarrollo del proyecto, el cual está programado para ser finalizado a fines de 2016. Diciembre 2015 Cambio de tráfico en la SH 71 a la nueva vía de servicio con dirección este DIC IEM BR E2 01 6 DIC IEM BR E2 01 6 AB RIL 20 16 JUN IO 20 16 Diciembre 2015 Apertura del paso elevado en la SH 130 Abril 2016 Finalización del puente de la FM 973 Junio 2016 Finalización de la vía de servicio de la SH 71 con dirección oeste Fines 2016 Finalización del proyecto Una de las prioridades del equipo del Proyecto SH 71 Express es brindar a Firmas Comerciales en Desventaja (DBE), oportunidades de trabajo en este proyecto de diseño-construcción de $149 millones de dólares. El equipo implementará una estrategia eficaz y continua que permita incrementar el número de oportunidades disponibles para firmas DBE con sede en Texas. El Programa DBE del Proyecto SH 71 se inició en noviembre 2014 con una reunión informativa. El evento brindó a los contratistas asistentes la oportunidad de establecer contacto con los miembros del equipo, y de conocer más sobre las oportunidades para contratistas y sobre el Programa de Entrenamiento para DBEs. Los asistentes recibieron información sobre el proyecto incluyendo la descripción del trabajo, el cronograma de construcción e ilustraciones de las mejoras a ejecutarse. www.SH71Express.com El Programa DBE continuó en enero con el Taller de Construcción de Carreteras de Transporte Pesado, organizado por TxDOT. Elizabeth Boswell, representante de ESB Consulting, lideró este taller de dos días, el cual brindó información referente a como trabajar con TxDOT. El taller abordó aspectos como la estructura organizacional de TxDOT, establecimiento de precios para ofertas de servicio, costos asociados, obtención de oportunidades de contacto, y las fases de los contratos con TxDOT. En la página web del proyecto también puede registrarse para recibir nuestro boletín electrónico, el cual incluye importante información actualizada sobre construcción y otros temas importantes. Asimismo, puede seguirnos en 6 En abril 2015, el Programa DBE del Proyecto SH 71 Express ofrecerá una gran oportunidad para los contratistas involucrados en carpintería y excavaciones. McCarthy Building Companies brindará entrenamiento profesional FIN ES 20 16 Manténgase Informado! Información actualizada sobre el proyecto esta disponible en: para Firmas DBE a dos contratistas seleccionados como parte de este programa. Los contratistas con sede en Texas que tengan experiencia en los campos de carpinteria y excavaciones serán invitados a presentar sus aplicaciones a partir de abril 2015. El proceso de selección se iniciará en junio de 2015. Las personas intersadas en el programa de entrenamiento para trabajar en el proyecto, pueden contactar a Veronica Murphy, Coordinadora DBE del Proyecto SH 71 Express vía correo electrónico a [email protected], o llamando a la línea directa del proyecto: 1-844-202-7830. Ruben Landa, Administrador DBE, brindando información a los asistentes a la reunión informativa del Proyecto SH 71 Express. Asistentes al Taller de Construcción de Carreteras de Trasnporte Pesado, realizado en enero 2015. Oportunidades de Oferta Asphalt Paving Bridge Bearings Bridge Deck Sealing Bridge Deck Surface Treatment Bridge Equipment Bridge Fencing Bridge Formwork Bridge Grinding Compost Concrete Cure Materials Concrete Mow Strip Concrete Pumping Concrete Ready Mix Construction Supplies Crash Cushions Demolition Design Support Document Shredding Drainage (inlets/RCP) Erosion Control Facilities – Electrical Fiber Expansion Joint Materials Field Office Trailers Field Waste Disposal Frame and Grates Geotechnical Drilling Guard Rail Inspection Jack & Bore Janitorial Maintenance Metal Beam Guard Rail Metal Pipe Metal Railing Milling Miscellaneous Concrete Work Mowing MSE Inlets and Grates Office Interior Construction Office Supplies Painting Pavement Markings Paving Chairs Permanent Attenuators Photography Plotting Supplies Precast Concrete Rail PVC Pipe Railing and Fencing Reinforced Concrete Pipe Reinforcing Steel Safety and Training Saw and Deal Sealed Expansion Joints Security Services Seeding and Sodding Service Equipment Sidewalk and Curb Slipform Barrier Rail Small Tools Soil Nail/Shortcrete Stamped Concrete Structural Field Welding Sweeping Telecommunications Temp Shoring Materials Temporary Yard Fencing Tie Bars Traffic Barrier Traffic Control Supply Traffic Striping Trucking Utility Design Utility Relocation Waterproofing Esta lista de oportunidades está sujeta a cambios Para información adicional sobre Oportunidades para DBE por favor contactar a: Ruben Landa Administrador DBE 1-844-202-7830 - [email protected] Veronica Murphy Coordinadora DBE 1-844-202-7830 - [email protected] 7 ¿Tiene Alguna Pregunta o Comentario? Contáctenos a través de nuestra página web o línea directa para conocer más sobre el Proyecto SH 71 Express, el proyecto de construcción dedicado a mejorar la movilidad en Austin Línea Directa 1-844-202-7830 Página Web www.sh71express.com Twitter @SH71_Express Para obtener información adicional contacte a Jenny Paredes, Especialista de Relaciones Públicas en www.sh71express.com/contact Para preguntas relacionadas con peaje, contacte a Rick L’Amie en la oficina de la Autoridad de Movilidad Regional del Centro de Texas llamando al 512-996-9778 8 Conozca más sobre TxTAG • TxTag hace que el pago de peajes sea más fácil y rápido en las autopistas de Texas, ya que usted no tiene que parar para pagar, hacer cola de la caseta de peaje, ni buscar cambio. • La fina etiqueta adhesiva de TxTaf va en el interior de su parabrisas, detrás de su espejo retrovisor. El lector electrónico, ubicado en las carreteras de peaje, envía una señal al microchip ubicado dentro de la etiqueta adhesiva, y los peajes son deducidos automáticamente de su cuenta TxTAG prepagada. • TxTag funciona como una tarjeta telefónica prepagada o como una tarjeta de regalo. Con una cuenta TxTag, usted paga por adelantado sus peajes, y puede fácilmente comprobar sus gastos y saldo disponible y hacer pagos en línea o por teléfono a su cuenta. • Los clientes TxTAG reciben 25% de descuento sobre las tarifas de pago por correo. • TxTag es aceptado en las autopistas de todo el estado. Las autopistas en el centro de Texas tambián aceptan etiquetas de peaje de Dallas (Toll Tag) y de Houston (EZ Tag). Visite www.txtag.org para obtener más información, crear o administrar su cuenta TxTag. Project Flier SH Expr Project Overview Pro SH 71 Express Project State Highway 71 is one of Austin’s most important roadways connecting drivers to the Austin-Bergstrom International Airport (ABIA), the city of Bastrop, and other central Texas communities. The purpose of the SH 71 Express Project is to enhance safety and reduce congestion and travel time along this corridor. Mobility improvements to SH 71 have been studied by the Texas Department of Transportation, in cooperation with the Central Texas Regional Mobility Authority. In compliance with the National Environmental Policy Act, TxDOT conducted an environmental study for the project. The Final Environmental Assessment was completed in May 2014 and the project received a Finding of No Significant Impact for the proposed build alternative on May 9, 2014. The same number of taxpayer-funded, non-tolled travel lanes that are available today will remain so in the future in accordance with state law. Drivers would have a choice whether or not to use the SH 71 tolled or non-tolled travel lanes. Project Map Project Limits The SH 71 Express Project is a 3.9-mile limitedaccess toll road beginning near Presidential Boulevard at Austin-Bergstrom International Airport and extending east, ending at SH 130 near Onion Creek. The project will include two new toll lanes, new bridges over FM 973 and SH 130, and ramps between toll lanes and the mainlanes of SH 71 and SH 130. In addition, Presidential Boulevard and FM 973 will be widened. Contact Us To learn more about the SH 71 Express Project, the construction project dedicated to improving long term mobility in Austin, please contact us through our website or hotline. Project Website www.sh71express.com Project Hotline 1-844-202-7830 For additional information contact: Jenny Paredes Public Relations Manager www.sh71express.com/contact/ For tolling related questions, please contact Rick L’Amie at 512-996-9778. SH Expr Pro Project Overview Roadway Improvements Project Timeline Enhancement of mobility in a safe and efficient manner. Addition of two new toll lanes (one in each direction) from Presidential Boulevard to SH 130. Improvement of bicycle and pedestrian access. Construction activities on the SH 71 Express Project have started in early 2015 with the SH 130 bridge substructure, and are expected to be completed by late 2016. Construction of bridges over FM 973 and SH 130. Construction of connecting ramps between the new toll lanes and the mainlanes of SH 71 and SH 130. Widening of SH 71 between Presidential Boulevard and FM 973. The same number of taxpayer-funded, non-tolled travel lanes that are available today will remain so in the future in accordance with state law. Drivers would have a choice whether or not to use the SH 71 tolled or non-tolled travel lanes. Project Details Construction for the SH 71 Express Project has started in early 2015 and is scheduled to reach completion by late 2016. The project includes a 3.9-mile limited-access toll road. SH 71 Express Project is expected to reduce travel time by 16 percent in 2016 and 54 percent by 2026.* SH 71 Express Project is expected to reduce costs associated with driving in traffic from approximately $15 million per year to $10 million per year.* *TxDOT 2013 Preliminary Project Benefit Assessment During constuction, traffic will be detoured under the SH 130 bridge and a traffic control plan will be implemented. Project Timeline* Winter 2015 Start construction of the new SH 130 flyover Spring 2015 Utility relocations Summer 2015 Presidential Boulevard widening Fall 2015 Traffic switch to new SH 71 general purpose lanes Summer 2016 New toll lanes open Late 2016 Full project completion and open to traffic *Project timeline is subject to change SH Expr Sinopsis del Proyecto Pro Proyecto SH 71 Express El State Highway 71 es una de las carreteras más importantes en Austin, la cual brinda acceso al Aeropuerto Internacional Austin-Bergstrom (ABIA), a la ciudad de Bastrop y a otras comunidades en el centro de Texas. El objetivo del Proyecto SH 71 Express es mejorar la seguridad y reducir tanto la congestión como el tiempo de viaje a lo largo de esta carretera. Las mejoras en movilidad para el SH 71 han sido estudiadas por el Departamento de Transporte de Texas, en cooperación con la Autoridad de Movilidad Regional del Centro de Texas. De acuerdo con la Ley Nacional de Política Ambiental, el TxDOT ha realizado un estudio de impacto ambiental para el proyecto. La Evaluación Ambiental Final fue completada en mayo de 2014, y el 9 de mayo de 2014 fue recibido un dictamen de Impacto No Significativo para la propuesta de construcción. De acuerdo con la ley estatal, el mismo número de carriles libres de peaje financiados por los contribuyentes, disponibles hoy en día, serán mantenidos en el futuro. Los conductores podrán elegir si desean usar los carriles de peaje o los carriles libres de peaje al transitar por la SH 71. Mapa del Proyecto 130 183 N 71 TE WHI BEN TOLL 973 El Proyecto SH 71 Express es una autopista de peaje con 3.9 millas de acceso limitado, la cual comienza en Presidential Boulevard, cerca del Aeropuerto Internacional Austin-Bergstrom, y se extiende hacia el este, terminando en el SH 130, cerca de Onion Creek. PRESIDENTIAL BLVD. LIS ETROPO M BU RL 183 Austin-Bergstrom International Airport ES ON SH 71 Project LImits 973 LEGEND Non-Tolled Roads SH 71 Project Limits Tolled Expressway Open to Traffic PE 130 Límites del Proyecto AR CE El proyecto incluye dos nuevos carriles de peaje, nuevos puentes sobre las carreteras FM 973 y SH 130, y rampas entre las pistas de peaje y las pistas principales del SH 71 y SH 130. Además, Presidential Boulevard y FM 973 serán ampliadas. TOLL Contáctenos Para conocer más sobre el Proyecto SH 71 Express, el proyecto de construcción dedicado a mejorar la movilidad en Austin, contáctenos a través de nuestra página web o nuestra línea directa. Página Web www.sh71express.com Línea Directa 1-844-202-7830 Para información adicional contacte a: Jenny Paredes Gerente de Relaciones Públicas www.sh71express.com/contact/ Para preguntas sobre peaje, contacte a Rick L’Amie llamando al 512-996-9778. SH Expr Pro Sinopsis del Proyecto Mejoras en las Vías Mejoras en movilidad, de manera segura y eficiente. Adición de dos nuevos carriles de peaje (uno en cada dirección) desde Presidential Boulevard hasta el SH 130. Mejora del acceso para bicicletas y peatones. Construcción de puentes sobre las carreteras FM 973 y SH 130. Construcción de rampas de conexión entre las nuevas pistas de peaje y las pistas principales del SH 71 y SH 130. Ampliación del SH 71 entre Presidential Boulevard y FM 973. El mismo número de carriles libres de peaje, financiados por los contribuyentes, disponibles hoy en día, serán mantenidos en el futuro de acuerdo con la ley estatal. Los conductores podrán elegir si desean usar los carriles de peaje o los carriles libres de peaje al transitar por la SH 71. Detalles del Proyecto Cronograma del Proyecto Las actividades de construcción del Proyecto SH 71 Express comenzaron a principios del 2015, con la construcción de los cimientos del puente sobre el SH 130. Se espera que la construcción del proyecto sea finalizada a fines de 2016. Durante la construcción del proyecto, el tráfico será desviado por debajo del puente en el SH 130 y se implementará un plan de control de tráfico. Cronograma del Proyecto* Invierno 2015 Inicio de la construcción del nuevo paso a desnivel en el SH 130 Primavera2015 Reubicación de servicios públicos La construcción del Proyecto SH 71 Express comenzó a principios del 2015 y se espera que sea completada a fines del 2016. Verano2015 Ampliación de Presidential Boulevard El proyecto incluye una autopista de peaje de 3.9 millas de acceso limitado. Otoño 2015 Cambio de tráfico a los nuevos carriles generales en el SH 71 El tráfico en el área del proyecto se ha incrementado en un 158 por ciento desde 1990. Se espera que el Proyecto SH 71 Express reduzca el tiempo de viaje en un 16 por ciento en 2016, y en un 54 por ciento en 2026.* El costo estimado de mantenimiento de vehículos transitando por el SH 71 es de $15 millones por año. La sección del SH 71 ubicada a la altura del FM 973 produce demoras de cerca de 2,500 vehículos por hora diariamente. Se espera que el Proyecto SH 71 Express reduzca los costos asociados con manejar en tráfico de $15 a $10 millones por año aproximadamente.* *Evaluación Preliminar de Beneficios del Proyecto TxDOT 2013. Verano 2016 Apertura de carriles de peaje Fines 2016 Finalización del proyecto. Abierto al tráfico. *El cronograma del proyecto está sujeto a cambios. Frequently Asked Questions Frequently Asked Questions 1. What is the SH 71 Express Project? The SH 71 Express Project is one of several improvements intended to complete a highway upgrade to SH 71. The project is dedicated to improving mobility along SH 71 in a safe, efficient, and reliable manner. This project also includes improvements to make the area more bicycle and pedestrian friendly. Ultimately, the SH 71 Express Project would help alleviate congestion and reduce travel time for drivers. 2. Where are the project limits? The SH 71 Express Project begins at Presidential Boulevard near ABIA and extends east for 3.9 miles, ending at SH 130 near Onion Creek. The project will include overpasses at FM 973 and SH 130. 3. Why does the project not extend past Ross Road? The traffic evaluations and analysis indicate that the eastbound merging areas on SH 71 east of SH 130 have sufficient merging distances for the design year traffic. They also indicate the proposed changes do not increase congestion at Ross Road and SH 71 for the design year traffic. In addition, traffic evaluations using traffic forecasts beyond the design year are being conducted to plan future improvements along the SH 71 corridor, including potential intersection improvements at Ross Road and additional lanes between SH 130 and Ross Road. 4. What will the SH 71 Express Project look like? SH 71 Express will be a 3.9-‐mile limited-‐access toll road stretching from Presidential Boulevard to SH 130 near Onion Creek. Two new toll lanes will be added (one in each direction), and new bridges over FM 973 and SH 130, as well as ramps between toll lanes and the mainlanes of SH 71 and SH 130 will be constructed. In addition, the existing SH 71 roadway between Presidential Boulevard and FM 973 will be widened and the same number of existing non-‐toll lanes will be maintained. 5. When will construction begin, and how long will it last? Construction has started in early 2015 and is expected to reach completion by late 2016. 6. Why is the SH 71 Express Project being built? Anyone who commutes or has traveled on SH 71 in the Austin area knows this is a very congested roadway. The SH 71 Express Project will help address growing congestion along SH 71, reduce costs associated with driving in traffic, and improve travel times for all drivers. Specifically, mobility enhancements are expected to result in an estimated cumulative savings of approximately half a billion dollars over a 20-‐year period from reductions in emissions, fuel consumption, vehicle wear and tear, and the value of travel time. Preliminary estimates indicate that the project would reduce travel time by 16 percent in 2016 and 54 percent in 2026.* *TxDOT 2013 Preliminary Project Benefit Assessment 7. What is a design-‐build project? Design-‐Build is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It is now commonly used in many countries. Design-‐build projects are used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project. 8. Who is building the SH 71 Express Project? McCarthy Building Companies, Inc. was hired by TxDOT to develop, design and construct the SH 71 Express Project. 9. What is the cost of the SH71 Express Project? The cost for this design-‐build project is $149 million. The funding for this project is a combination of federal and state funds. 10. What improvements are included in the SH71 Express Project? • Enhancement of mobility in a safe and efficient manner • Addition of two new toll lanes (one in each direction) from Presidential Boulevard to SH 130 • Improvement of bicycle and pedestrian access • Construction bridges over FM 973 and SH 130 • Construct connecting ramps between the new toll lanes and the mainlanes of SH 71 and SH 130 • Widening of SH 71 between Presidential Boulevard and FM 973 • The same number of taxpayer-‐funded, non-‐tolled travel lanes that are available today will remain so in the future in accordance with state law. Drivers would have a choice whether or not to use the SH 71 tolled or non-‐tolled travel lanes. 11. What kind of construction and lane closures can I expect from this project? The improvements consist of widening and reconstructing the existing roadway and building new toll lanes from Presidential Boulevard to SH 130. All closures, except for emergencies, are planned for nighttime and off-‐peak hours to minimize the impact to traffic. Holidays and major events have been considered during the planning of lane closures to minimize delays when traffic is the heaviest. 12. How will the SH 71 Express Project construction activities affect transit in and out the airport? The expansion of SH 71 at Presidential Boulevard will require periodic lane closures to allow construction crews and equipment to conduct their work. The lane closures will be scheduled for off-‐peak hours in order to minimize the impact to travelers entering and exiting the airport. Information about construction activities relating to ABIA is available at http://www.austintexas.gov/department/improvements-‐are-‐underway. 13. How can I stay updated on construction and lane closures? To receive updated information on construction and lane closures, visit our website www.sh71express.com, call the project hotline at 1-‐844-‐202-‐7830, or sign up to receive periodic project e-‐blasts through the “contact us” page on the project website. 14. How much will tolls cost for the SH 71 Express Project? The Mobility Authority is in charge of tolling operations for the project. For specific tolling questions, please call 512-‐996-‐9778 or submit your question through the “contact us” form on the project website. 15. I would like someone to speak to my group about the SH71 Express Project. How do I request a speaker? Our project team would be happy to speak to your group about the SH 71 Express Project. To request a speaker, complete the “Request a Speaker” form on the “contact us” page on our website, www.SH71express.com, or you can call the project hotline at 1-‐844-‐202-‐7830. 16. Who can I contact for more information? For general project information and inquiries, you can sign up to receive our regular e-‐blast updates, call our project hotline at 1-‐844-‐202-‐7830, or contact our public information manager Jenny Paredes through the “contact us” page on the project website, http://www.sh71express.com/contact/. Preguntas Frecuentes 1. ¿Qué es el Proyecto SH 71 Express? El Proyecto SH 71 Express es parte de una serie de mejoras orientadas a completar la renovación de la carretera SH 71. El proyecto tiene como objetivo el mejorar la movilidad a lo largo del SH 71 de manera segura, eficiente y confiable. Este proyecto también incluye mejoras para brindar fácil acceso a bicicletas y peatones en la zona. Básicamente, el Proyecto SH 71 Express ayudará a aliviar la congestión en el área y a reducir el tiempo de desplazamiento para los conductores. 2. ¿Cuáles son los límites del proyecto? El Proyecto SH 71 Express comienza en Presidential Boulevard, cerca de ABIA, y se extiende hacia el este por aproximadamente 3.9 millas, terminando a la altura del SH 130 cerca de Onion Creek. El proyecto incluirá pasos a desnivel a la altura del FM 973 y SH 130. 3. ¿Por qué el proyecto no se extiende más allá de Ross Road? Las evaluaciones y análisis de tráfico indican que la fusión de áreas ubicada en la SH 71, al este de la SH 130, incluye suficiente espacio para fusionarse en el trafico futuro. Estas evaluaciones también indican que los cambios propuestos no aumentarán la congestión en la intersección de Ross Road y la SH 71 en el futuro. Asimismo, a fin de planificar las futuras mejoras a lo largo de la carretera 71, están siendo conducidas evaluaciones de trafico que utilizan predicciones que van mas allá del horizonte, incluyendo mejoras potenciales en la intersección de Ross Road y líneas adicionales entre la SH 130 y Ross Road. 4. ¿Cómo se va a ver el Proyecto SH 71 Express? El SH 71 Express será una autopista de peaje con 3.9 millas de acceso limitado, la cual se extenderá desde Presidential Boulevard hasta el SH 130 cerca de Onion Creek. Serán construidas dos nuevas pistas de peaje (una en cada dirección), nuevos puentes sobre las carreteras FM 973 y SH 130, y rampas entre las pistas de peaje y las pistas principales de las carreteras SH 71 y SH 130. Además, la vía existente entre Presidential Boulevard y FM 973 será ampliada, manteniéndose el mismo número de carriles libres de peaje. 5. ¿Cuándo comenzará la construcción, y cuánto tiempo durará? La construcción comenzó a principios de 2015 y se espera que sea terminada a fines de 2016. 6. ¿Por qué está siendo construido el Proyecto SH 71 Express? Cualquier persona que viaje o ha viajado en el SH 71, en el área de Austin, sabe que ésta es una carretera muy congestionada. El Proyecto SH 71 Express ayudará a resolver la creciente congestión de tráfico a lo largo del SH 71, a reducir los gastos asociados con manejar en tráfico, y a mejorar los tiempos de traslado para los conductores. Específicamente, se espera que las mejoras en movilidad den lugar a un ahorro acumulado estimado en aproximadamente mil quinientos millones de dólares durante un periodo de 20 años a partir de la reducción de emisiones, consumo de combustible, desgaste de vehículos y valor del tiempo de viaje. Los cálculos preliminares indican que el proyecto reduciría el tiempo de viaje en un 16 por ciento en 2016 y en 54 por ciento en 2026.* *Evaluación Preliminar de Beneficios del Proyecto TxDOT 2013 7. ¿Qué es un proyecto de diseño-‐construcción? Diseño-‐Construcción es un método para desarrollar un proyecto en el que una sola entidad, conocida como el diseño-‐constructor o contratista del diseño-‐construcción, brinda servicios tanto de diseño como de construcción. Actualmente, en muchos países, es muy común el uso de este método. Los proyectos de diseño-‐construcción se usan con el fin de minimizar riesgos por parte del dueño del proyecto y reducir los plazos de entrega mediante el desarrollo paralelo de las fases del diseño y de construcción de un proyecto. 8. ¿Quién está construyendo el Proyecto SH 71 Express? McCarthy Building Companies, Inc. fue contratado por TxDOT para desarrollar, diseñar y construir el Proyecto SH 71 Express. 9. ¿Cuál es el costo del Proyecto SH 71 Express? El costo de este proyecto de diseño-‐construcción es $149 millones de dólares. El financiamiento del proyecto es una combinación de fondos federales y estatales. 10. ¿Cuáles son las mejoras incluidas en el Proyecto SH 17 Express? • Mejorar la movilidad de manera segura y eficiente. • • • • Añadir dos nuevas pistas de peaje (uno en cada dirección) desde Presidential Boulevard hasta el SH 130. Mejorar el acceso parapara bicicletas y peatones. Construir puentes sobre las carreteras FM 973 y SH 130. Construir rampas de conexión entre las nuevas pistas de peaje y las pistas principales del SH 71 y del SH 130. Ampliar el SH 71 entre Presidential Boulevard y FM 973. Mantener el mismo número de pistas libres de peaje existentes. • • 11. ¿Qué tipo de construcción y de cierre de carriles debo esperar durante la construcción de este proyecto? Las mejoras consisten en la ampliación y reconstrucción de la vía existente y en la construcción de nuevas pistas de peaje desde Presidential Boulevard hasta el SH 130. A fin de minimizar el impacto en el tráfico, todos los cierres de carriles, con excepción los cierres en caso de emergencia, han sido previstos para ser realizados durante la noche y fuera de las horas punta. Los feriados y grandes eventos han sido considerados durante la planificación de los cierres de carriles a fin de minimizar retrasos cuando el tráfico es más pesado. 12. ¿Cómo afectarán las actividades de construcción el tráfico de entrada y salida del aeropuerto? La expansión del SH 71 a la altura de Presidential Boulevard requerirá cierres periódicos de carriles que permitan a los equipos de construcción y sus maquinarias llevar a cabo su trabajo. A fin de minimizar el impacto en los conductores entrando y saliendo del aeropuerto, los cierres de carriles serán programados para realizarse en horas de poca actividad. Información sobre las actividades de construcción relacionadas con ABIA se encuentra disponible en: http://www.austintexas.gov/department/improvements-‐are-‐underway. 13. ¿Cómo puedo mantenerme informado de las actividades de construcción y cierres de carriles? Para recibir información actualizada sobre la construcción y cierre de carriles, visite nuestra página web www.sh71express.com, llame a la línea directa del proyecto al 1-‐844-‐202-‐7830, o regístrese para recibir información periódica vía correo electrónico, ingresando su información en el formulario de contacto disponible en la página web del proyecto. 14. ¿Cuál será el costo del peaje para el Proyecto SH 71 Express? Debido a que la Autoridad de Movilidad estará a cargo de la operación y mantenimiento de los carriles del SH 71 Express, es esta entidad quien se encargará de responder todas las preguntas relacionadas con peaje. Para preguntas específicas sobre peaje, por favor llame al 512-‐996-‐9778 o envíe sus preguntas a través del formulario de contacto disponible en la página web del proyecto. 15. Me gustará que un representante del proyecto hiciera una presentación a mi grupo sobre el Proyecto SH 71 Express. ¿Cómo puedo solicitarlo? El equipo del proyecto estará feliz de hacer una presentación sobre el Proyecto SH 71 Express a su grupo. Para solicitar un representante, complete el formulario “Request a Speaker” disponible en la página de contacto de nuestra página web www.SH71express.com, o llame a la línea directa del proyecto 1-‐844-‐202-‐7830. 16. ¿A quién puedo contactar para obtener más información? Para obtener información general del proyecto y absolver consultas, usted puede registrarse para recibir información actualizada vía correo electrónico, puede llamar a la línea directa del proyecto 1-‐844-‐202-‐7830, o puede contactar a Jenny Paredes, nuestra gerente de información pública, a través del formulario de contacto disponible en la página web del proyecto, http://www.sh71express.com/contact/. Para preguntas relacionadas con la Autoridad de Movilidad y peaje, por favor contacte a Rick L’Amie llamando al 512-‐996-‐9778. Presentation 4/6/15 Open House March 24, 2015 Introduc/on About SH 71 • One of the most important roadways in Aus>n • Traffic increased by 158% over the last 25 years • Connects travelers to central Texas communi>es and Aus>n-‐Bergstrom Interna>onal Airport (ABIA) About the SH 71 Express Project • 3.9 mile corridor from Presiden>al Boulevard to State Highway 130 • Goal is to enhance safety and reduce conges>on and travel >me in the area • $149 million project 1 1 4/6/15 Project Corridor 2 Project Overview Improvements include: • Two new toll lanes (one in each direc>on) • Four lane, tolled overpasses over SH 130 and FM 973 • Access ramps on and off the new toll lanes and SH 130 • Maintaining and widening exis>ng SH 71 non-‐tolled mainlanes • Widening FM 973 at SH 71 • Widening Onion Creek Bridge • Improving pedestrian and bicycle facili>es 3 2 4/6/15 Meet the Team • Maintains 80,000 miles of road www.TxDOT.gov • Supports highway, ferry opera/ons, avia/on, rail and public transporta/on across the state • Works with others to provide safe and reliable transporta/on • Uses federal funds, along with state gas tax revenue and other sources to implement statewide programs TxDOT is responsible for the SH 71 Express Project and is in coordina>on with the Central Texas Mobility Authority, who will operate and maintain the toll lanes when they are open 4 Meet the Team • Independent government agency • Created in 2002 • Improves transporta>on in Williamson and Travis Coun/es • Mission: implement innova>ve, mul>-‐modal transporta>on solu>ons that reduce conges>on and create transporta>on choices that enhance quality of life and economic vitality. • Responsible for tolling opera>ons of SH 71 Express www.MobilityAuthority.com 5 3 4/6/15 Meet the Team • Design-‐builder of the SH 71 Express Project • 9th largest domes>c general contractor in the na>on (Engineering News-‐Record, May 2014) with more than 150 years experience. • Works closely with its design partner LAN, Inc. to develop the most cost-‐effec>ve design solu>ons • Uses a mul>-‐phased approach with emphasis on maintaining safe traffic flow in the corridor and minimizing impact to adjacent businesses and ABIA www.McCarthy.com 6 SH 71 Before & APer Before Current SH 71 at FM 973. There are two separate traffic lights at FM 973 north and south, which play a major role in conges/on during peak travel /mes APer SH 71 Express at the conclusion of construc/on. The overpass at FM 973 will reduce conges/on and allow through traffic to travel with ease over these new toll lanes. 7 4 4/6/15 SH 71 Before & APer Before Current SH 71 near FM 973. SH 71 current eastbound and westbound mainlanes near the FM 973 intersec/on APer SH 71 Express at the conclusion of construc/on. The rendering shows tolling equipment, non-‐tolled SH 71 mainlanes, as well as pedestrian and bicycle access 8 Road Detours As road detours, closures, and changes occur, the public will be no>fied by: E-‐Blasts E-‐NewsleYer Project Website TwiYer Visit www.sh71express.com to sign up for detour and project no>fica>ons via email 9 5 4/6/15 Minimizing Noise & Dust The SH 71 Project team will strive to keep a clean construc>on zone with minimal noise and dust. To do this, McCarthy Building Companies will: • U>lize onsite water trucks • Perform the loud construc>on work during normal business hours Complaints about dust and noise may be directed to the project hotline: 1-‐844-‐202-‐7830 10 Environmental Protec/on A Comprehensive Environmental Protec/on Plan (CEPP) was created including the following components: • Environmental Management System • Environmental Compliance and Mi>ga>on Plan • Environmental Protec>on Training Program • Hazardous Materials Management Plan • Communica>on Plan • Construc>on Monitoring Plan 11 6 4/6/15 Disadvantaged Business Enterprise (DBE) Program The SH 71 Express Project team is dedicated to providing opportuni/es for Disadvantaged Business Enterprises (DBE) The DBE program includes: • Bid opportuni>es • Kick-‐off Mee>ng and Networker (held November 2014) • Heavy-‐Highway Capacity Building Workshop (held January 2015) • Job Training (to begin spring 2015) To learn more about the SH 71 Express Project DBE Program, contact Ruben Landa, DBE Administrator [email protected] or 1-‐844-‐202-‐7830 12 Stay Connected Website Hotline 1-‐844-‐202-‐7830 www.SH71Express.com TwiYer @SH71_Express 13 7 4/6/15 Stay Connected Sign up to receive e-‐blasts and the project newsleler including traffic updates and project informa>on: www.SH71Express.com/contact 14 8 4/6/15 Jornada de Puertas Abiertas 24 de marzo de 2015 Introducción Sobre SH 71 • Una de las carreteras más importantes de Aus;n • Durante los úl;mos 25 años, el volumen de tráfico se ha incrementado en 158 • Brinda conexiones a las comunidades del centro de Texas y al Aeropuerto Internacional Aus;n-‐ Bergstrom (ABIA) Sobre el Proyecto SH 71 Express • Autopista de 3.9 millas que va desde Presiden;al Boulevard hasta SH 130 • Tiene como obje;vo mejorar la seguridad y reducir la conges;ón y ;empo de viaje en la zona. • El costo de este proyecto es de $149 millones de dólares. 1 1 4/6/15 Mapa del Proyecto 2 Sinópsis del Proyecto Las mejoras incluyen: • Dos nuevos carriles de peaje (uno en cada dirección) • Cuatro carriles de peaje sobre las carreteras SH 130 y FM 973 • Rampas de conexión de entrada y salida entre los nuevos carriles de peaje y la SH 130 • Mantenimiento y ampliación de los carriles principales • libres de peaje de la SH 71 • Ampliación de la carretera FM 973 a la altura de la SH 71 • Ampliación del Puente de Onion Creek • Mejoras de las instalaciones para peatones y ciclistas 3 2 4/6/15 Conozca al Equipo www.TxDOT.gov • Responsible por el mantenimiento de 80,000 millas de carretera • Brinda apooyo a las áreas de aviación, ferrocarriles y transporte público en todo el estado • Trabaja con otras en;dades para brindar seguridad y transporte de confianza • Usa fondos federales combinados con ingresos fiscales del gas del estado y otras fuentes de financiamiento para implementar el programa de transporte en todo el estado. TxDOT es responsible del Proeycto SH 71 Express Project y trabaja en coordinación con la Autoridad de Movilidad Regional de Texas, quién estará a cargo de la operación y mantenimiento de los carriles de peaje cuando estos estén abiertos al público 4 Conozca al Equipo • Agencia gubernamental independiente • Creada en 2002 • Mejora el sistema de transporte en los Condados de Williamson y Travis • Misión: implementar soluciones innovadoras de transporte mul;modal que reduzcan la conges;ón y brinden opciones de transporte que mejoren la calidad de vida y vitalidad económica • Responsable de las operaciones del sistema de peaje de la SH 71 Express www.MobilityAuthority.com 5 3 4/6/15 Conozca al Equipo www.McCarthy.com • Diseño-‐Constructor del Proyecto SH 71 Express • Noveno contra;sta general a nivel nacional (Engineering News-‐Record, May 2014) con más de 150 años de experiencia. • Trabaja muy de cerca con LAN, su socio de diseño, para desarrollar la solución de diseño más rentable para el proyecto. • Usa un enfoque mul;fase en la construcción del Proyecto SH 71 Express, poniendo énfasis en la seguridad del tráfico a lo largo de la carretera, y en la minimización del impacto en los negocios adyacentes y del aeropuerto. 6 SH 71 Antes & Después Antes Intersección de las carreteras SH 71 y FM 973 hoy en día . Existen dos semáforos en la FM 973 con dirección norte y sur, los cuales juegan un papel muy importante durante las horas punta. Después Vista de la SH 71 al final de la construcción. El paso elevado en la FM 973 reducirá la conges\ón y permi\rá que el tráfico fluya sin problema a lo largo de los carriles de peaje. 7 4 4/6/15 SH 71 Antes & Después Antes Vista de los carriles principales, con dirección este y oeste, de la carretera SH 71, cerca de FM 973 Después SH 71 al final de la construcción. La ilustración muestra el equipo de peaje, los carriles libres de peaje, y las áreas de acceso para peatones y bicicletas 8 Desvíos en Carreteras Cuando ocurran desvíos, cierres de carriles, y otros cambios en tráfico el público será informado a través de: Comunicaciónes Electrónicas Bole_n Informa\vo Página web del proyecto Twi`er Visite www.sh71express.com y regístrese para recibir no;ficaciones sobre el proyecto vía correo electrónico 9 5 4/6/15 Minimizando Ruido & Polvo El equipo del Proyecto SH 71 Express hará lo posible por mantener el área de construcción limpia, con la mínima can;dad de ruido y polvo Para ello, McCarthy Building Companies: • U;lizará camiones de agua in situ • Realizará los trabajos de construcción ruidosos durante horas regulares de trabajo Los reclamos sobre polvo y ruido deben ser dirigidos a la línea directa del proyecto: 1-‐844-‐202-‐7830 10 Protección Ambiental Ha sido creado un Plan Integral de Protección Ambiental (CEPP), el cual incluye los siguientes componentes: • Sistema de Administración Ambiental • Norma;va Ambiental y Plan de Mi;gación • Programa de Entrenamiento para Protección Ambiental • Plan de Manejo de Materiales Peligrosos • Plan de Comunicaciones • Plan de Monitoreo de Construcción 11 6 4/6/15 Programa para Firmas Comerciales en Desventaja El equipo del Proyecto SH 71 Express \ene como una de sus prioridades el brindar oportunidades de trabajo a Firmas Comerciales en Desventaja (DBE) El Programa DBE incluye: • Oportunidades para ofertas de servicio • Reunión Informa;va y para • establecer contactos (realizada en noviembre 2014) • Taller de Construcción de Carreteras de Transporte Pesado (realizada en 2015) • Capacitación Laboral (a realizarse en la primavera de 2015) Para conocer más sobre el Programa DBE del Proyecto SH 71 Express, contacte a Ruben Landa, Administrador DBE [email protected] ó 1-‐844-‐202-‐7830 12 Conéctese Twi`er Página Web Línea Directa @SH71_Express 1-‐844-‐202-‐7830 www.SH71Express.com 13 7 4/6/15 Conéctese Regístrese en nuestra página web para recibir información de tráfico y no;cias sobre el proyecto vía correo : www.SH71Express.com/contact 14 8 Display Boards Project Overview The purpose of the SH 71 Express Project is to enhance safety and reduce congestion and travel time along the corridor. The same number of taxpayer-funded, non-tolled travel lanes that are available today will remain. Drivers will have a choice whether or not to use the SH 71 tolled or non-tolled lanes. The SH 71 Express Project is one of several improvements intended to complete a highway upgrade to SH 71. This project is dedicated to enhancing mobility along SH 71 in a safe, efficient and reliable manner. Improvements will help alleviate congestion from travelers, as well as bring improvements to the bicycle and pedestrian facilities. Project Details Two new toll lanes (one in each direction) from Presidential Boulevard to SH 130 Improve bicycle and pedestrian access Construct bridges over FM 973 and SH 130 Construct connecting ramps between the new toll lanes and the mainlanes of SH 71 and SH 130 Widen SH 71 between Presidential Boulevard and FM 973 Drivers will have a choice whether or not to use the SH 71 tolled or non-tolled travel lanes as SH 71 will continue to provide motorists with a non-tolled option for travel. Project Map 130 183 N 71 HITE W BEN PRESIDENTIAL BLVD. POLIS METRO BU 183 RL TOLL 973 Austin-Bergstrom International Airport ES ON SH 71 Project Limits 973 LEGEND Non-Tolled Roads SH 71 Project Limits Tolled Expressway Open to Traffic PE 130 TOLL AR CE Project Details Two new toll lanes (one in each direction) from Presidential Boulevard to SH 130 Improve bicycle and pedestrian access Construct bridges over FM 973 and SH 130 Construct connecting ramps between the new toll lanes and the mainlanes of SH 71 and SH 130 Widen SH 71 between Presidential Boulevard and FM 973 Drivers will have a choice whether or not to use the SH 71 tolled or non-tolled travel lanes as SH 71 will continue to provide motorists with a non-tolled option for travel. Construction Milestones Dec. 2015 Traffic switch on SH 71 to new eastbound frontage road DEC Dec. 2015 . 20 15 DEC April 2016 . 20 15 APR IL 2 016 JUN E2 LAT Opening of SH 130 Overpass 016 E2 016 Completion of FM 973 Bridge June 2016 Completion of SH 71 westbound frontage road Late 2016 Project Completion Before After Current SH 71 at FM 973. There are two seperate traffic lights at FM 973 north and south, which play a major role in congestion during peak travel times. SH 71 Express at the conclusion of construction. The overpass at FM 973 will reduce congestion and allow through traffic to travel with ease. Before Current SH 71 near FM 973. SH 71 current eastbound and westbound mainlanes near the FM 973 intersection. After SH 71 Express at the conclusion of construction. The rendering shows tolling equipment, non-tolled SH 71 mainlanes, as well as the pedestrian and bicycle access. Have a Question or Comment? Contact us through our website or hotline to learn more about the SH 71 Express Project, the construction project dedicated to improving mobility in Austin Project Hotline 1-844-202-7830 Project Website www.sh71express.com Twitter @SH71_Express Proposed State Highway 71 Between Presidential Blvd. and FM 130 Appendix C Distribution List – Open House Invitation SH 71 Express Project Open House Flyer Distribution March 2015 Street Address Organization Type Del Valle Child Development Center Del Valle Elementary School Del Valle High School Del Valle ISD Del Valle Middle School Del Valle Opportunity Center Del Valle Post Office Montopolis Recreation Center Popham Elementary School South Rural Community Center School School School School -‐ district office School School Post Office Community Center School Community Center 5301 G Ross Road 5400 Ross Road 5201 Ross Road 5301 Ross Road 5500 Ross Road 5301 B Ross Road 2883 Highway 71 East 1200 Montopolis Drive 7014 Elroy Road 3518 FM 973 South City State Zip Phone Del Valle Del Valle Del Valle Del Valle Del Valle Del Valle Del Valle Austin Del Valle Del Valle TX TX TX TX TX TX TX TX TX TX 512-‐386-‐3727 512-‐386-‐3350 512-‐386-‐3200 512-‐386-‐3000 512-‐386-‐3400 512-‐386-‐3300 512-‐385-‐7902 512-‐978-‐2300 512-‐386-‐3750 512-‐247-‐4407 78617 78617 78617 78617 78617 78617 78617 78741 78617 78617 Appendix D Event Photos