Commissioner Francis Suarez
Transcripción
Commissioner Francis Suarez
Please join Commissioner Francis Suarez to celebrate the groundbreaking ceremony for Silver Bluff Drainage Improvements Monday, July 8, 2013 at 6:00 p.m. located at the intersection of SW 24th Street & 25th Avenue more specifically in front of the property at 2483 SW 24 Street The work will consist of storm sewer improvements that include drainage pipes, French drains, drainage wells, inlets, and repairs to damaged curb and gutters and sidewalks, along with minor roadway repairs only associated with the disturbed areas along the following locations: Along SW 25 Avenue from SW 23 Street to SW 24 Terrace Along SW 24 Street from SW 24 Avenue to SW 27 Avenue Along SW 23 Terrace from SW 24 Avenue to the west of SW 25 Avenue For more information call (305) 416-1280 El Comisionado Francis Suarez les invita a participar en la ceremonia oficial de inauguración de la obra Mejorar el sistema de drenaje de Silver Bluff Lunes, 8 de julio, 2013 6:00 p.m. en la intersección de la 24 Calle y la 25 Avenida del SW más específicamente en frente de la propiedad 2483 SW 24 Calle La obra consiste en mejorar el sistema de drenaje que incluyen las tuberías de desagüe, drenaje francés, pozos de drenaje, entradas de los desagües, y reparaciones a las aceras y bordillos de concreto que estén dañados, junto con reparaciones menores a las calles asociadas con las áreas perturbadas en las siguientes carreteras: A lo largo de la 25 avenida desde la 23 calle hasta la 24 terrace del SW A lo largo de la 24 calle entre las avenidas 24 y 27 del SW A lo largo de la 23 terrace desde la 24 avenida hasta el oeste de la 25 avenida del SW Para más información, llamar al (305) 416-1280.