Commissioner Francis Suarez

Transcripción

Commissioner Francis Suarez
Please join
Commissioner Francis Suarez
to celebrate the
groundbreaking ceremony for
Silver Bluff Drainage Improvements
Monday, July 8, 2013
at 6:00 p.m.
located at the intersection of SW 24th Street & 25th Avenue
more specifically in front of the property at 2483 SW 24 Street
The work will consist of storm sewer improvements that include drainage pipes, French drains, drainage wells, inlets,
and repairs to damaged curb and gutters and sidewalks, along with minor roadway repairs only associated with the
disturbed areas along the following locations:



Along SW 25 Avenue from SW 23 Street to SW 24 Terrace
Along SW 24 Street from SW 24 Avenue to SW 27 Avenue
Along SW 23 Terrace from SW 24 Avenue to the west of SW 25 Avenue
For more information call (305) 416-1280
El Comisionado Francis Suarez
les invita a participar en
la ceremonia oficial de inauguración de la obra
Mejorar el sistema de drenaje de Silver Bluff
Lunes, 8 de julio, 2013
6:00 p.m.
en la intersección de la 24 Calle y la 25 Avenida del SW
más específicamente en frente de la propiedad 2483 SW 24 Calle
La obra consiste en mejorar el sistema de drenaje que incluyen las tuberías de desagüe, drenaje francés, pozos de
drenaje, entradas de los desagües, y reparaciones a las aceras y bordillos de concreto que estén dañados, junto con
reparaciones menores a las calles asociadas con las áreas perturbadas en las siguientes carreteras:



A lo largo de la 25 avenida desde la 23 calle hasta la 24 terrace del SW
A lo largo de la 24 calle entre las avenidas 24 y 27 del SW
A lo largo de la 23 terrace desde la 24 avenida hasta el oeste de la 25 avenida del SW
Para más información, llamar al (305) 416-1280.

Documentos relacionados