BUILD MARGIN

Transcripción

BUILD MARGIN
Características Principales
PROJECT NAME
POECHOS I PROJECT
INSTALLED CAPACITY
15.2 MW
PARTICIPANTS
SINERSA
Operator
World Bank – CDM Facility (NDCMF),
TECHNICAL DESCRIPTION
THE PROJECT
Project Location
Region / State / Province
Classification of Project Activity
Number of Area of Responsibility
Area of Responsibility
Project Activity
Technology used
Implementation Status
OF
Department of Piura
Department of Piura /Sullana / District of
Lancones
Hydroelectric power production
1
Renewable Power
Generation of Renewable Energy from
Hydropower plant connected to national
grid. Additional energy production from
hydropower
plant,
using
existing
reservoir, without increase of reservoir
volume
Used technology is based on 2 Kaplan
standard turbines and 2 Generators,
connected by vertical shaft.
In operation since April 2004
DESCRIPTION OF METHODOLOGY USED
 Total quantity of tCO2, as a reduction of CO2 emission,
due to hydropower plant operation, has been calculated
using Combined Margin (CM). ACM0002
 CM is simple average of Operational Margin (OM) and
Build Margin (BM), applying the following formula:
CM = 0.5(OM) + 0.5(BM)
 Total Reduction of CO2 emission = CM x PRODUCTION
RESULTADOS OBTENIDOS
AÑO DE
CONTROL
OPERATING
MARGIN
(OM)
BUILD
MARGIN
(BM )
COMBINED
MARGIN
(CM)
2004-2005
0.74259
0.38309
2005-2006
0.73959
2006-2007
MWh
CERs
0.56284
34 072.854
19 178
0.40612
0.57286
56 037.974
32 102
0.73951
0.31932
0.52942
57 822.414
30 612
2007-2008
0.75559
0.35991
0.55775
70 567.290
39 359
2008-2009
0.75828
0.37747
0.56788
101 724.360
57 767
2009-2010
0.55629
0.36014
0.45822
88 811.301
40 695
Comparison of the projection CERs and real CERs April
1st, 2009 – March 31st, 2010
Year
ERs (tCO2e)
Projection in
PDD
ERs(tC02e)
Real to March
31,2010
1st April 2005
31,463
19,178
1st April 2006
31,463
32,102
1st April 2007
31,463
30,612
1st April 2008
31,463
39,359
1st April 2009
31,463
57,767
1st April 2010
31,463
40,695
188,778
219,713
TOTAL
Ingreso aproximado (5 €/tCO2e) : 1 098 565.00 €
CONSIDERACIONES PARA LOS MONITOREOS
ANUALES
 Asesoría para el cálculo de los factores. Revisión y metodología.




Asignar responsables.
Calidad de Medición. Medición con calibración /contrastación
vigente.
Calidad del almacenamiento de la información. Backups.
Calidad del envío de la información fuente. Originales
Compromisos sociales cumplidos y con adecuada evidencia.
 Educación (Becas Universitarias – Capacitación Maestros rurales)
 Mejora de instalaciones domiciliarias internas (2 caseríos de la zona)
 Presentaciones de eficiencia energética.
 Compras locales
 Trabajo personal local
 Cumplimiento de obligaciones medio ambientales.
Referencia
 Reportes del Proyecto Poechos I
 http://cdm.unfccc.int/Projects/DB/TUEV-SUED1123850211.52/view
 Metodología
 http://cdm.unfccc.int/Projects/DB/TUEV-SUED1123850211.52
Mgr. Ing. Redy Risco Ramos
[email protected]
FIN

Documentos relacionados