zaruma resources inc.
Transcripción
zaruma resources inc.
ZARUMA RESOURCES INC. LUZ DEL COBRE COPPER MINE (SONORA, MEXICO) To Hermosillo 160 km West June 2008 LOCATION SAN ANTONIO CONCESSIONS Luz del Cobre, located in the San Antonio Concessions 160 Concessions, km East of Hermosillo, Sonora 3 hours drive from Internatl.Airport. Luz del Cobre LUZ DEL COBRE 11,200 hectares Mining friendly State of Sonora, good infrastructure 100% Owned by wholly owned subsidiary Minerales Libertad SA de CV Zaruma Resources Inc. June 2008 LUZ DEL COBRE IN A NUTSHELL Open-pit, heap-leach, solvent extraction (SX), electrowinning (EW) copper operation. November 2006: Independent Technical Report (NI43-101) ( ) by M3 Engineering & Technology (Tucson) and P&E Mining Consultants (Brampton,Toronto). Currrently reserves and open ended resources at 4.3 million tonnes at 1% copper. 15 Million pounds average annual copper cathode output over 5 years US$20 Million average annual cash flow (at US$3.36/lb copper, projected costs at US$ 1.55lb). Capital payy back estimated within 18 months. Fast tracked start-up copper project in large (11,200 hectares) San Antonio concession in a geological environment with very significant additional copper exploration e p o a o po potential. e a Zaruma Resources Inc., June 2008 Luz del Cobre Reserves Zaruma Resources Inc. June 2008 LUZ DEL COBRE GEOLOGICAL SETTING Luz del Cobre Breccia-hosted, supergene “manto-type” copper mineralization in a porphyry driven IOCG (iron-oxide-copper-gold) porphyry-driven (iron oxide copper gold) system. system Zaruma Resources Inc. June 2008 Additional Copper Discoveries at Luz del Cobre Luz del Cobre Open Pit Luz del Cobre Open Pit Calvario “South” Extension Zaruma Resources Inc. June 2008 Luz del Cobre: Summary of Projected Cash Flow Chief Metallurgist Everardo Morga with lab scale copper cathodes from Luz del Cobre ore Zaruma Resources Inc. June 2008 LUZ DEL COBRE: HIGHLIGHTS Construction on the way, estimated first copper cathode production end 2008. Experienced senior staff being engaged, EPCM contract managed by experienced M3 Engineering & Construction Corp. Corp US$22 Million financing commitment by subsidiary of Gl Glencore I t International ti l AG 65% of project capital costs for equipment and materials has been committed to date. Additional copper mineralization and resource expansion near Luz del Cobre Cobre. Zaruma Resources Inc. June 2008 Site of SW-EW Plant LUZ DEL COBRE MORE PROGRESS Ore Haulage Road Valley Leach Pad Preparation Crusher Component Leach Pad Lining Zaruma Resources Inc. June 2008 SAN ANTONIO: SIGNIFICANT EXPLORATION UPSIDE Highly prospective geological setting with features characteristic for an iron-oxide-copper-gold pp g ((IOCG)) system. y Copper: identified copper deposit (Luz del Cobre) and wide spread copper mineralization. Gold: 300,000 ounces of proven and probable gold resources (NI43-101) in open ended mineralized breccias structures. Presence of intrusives (deeper seated porphyry?) and well developed fault systems, structural control. Mineralization in form of and related to hydrothermal breccias breccias, replacement bodies, veins and skarns. Strong Cu-Au-Mo-As (some U) geochemical signature. Zaruma Resources Inc. June 2008 TARGETS AND LAND POSITION Zaruma controls major portion of a SW-NE trending belt of mineralization and of the historic San AntonioSan Javier mining district. A B Current Exploration Targets: A = Trion-Luz del Cobre B = Sapo Sapo-Carrizo Carrizo Zaruma Resources Inc. June 2008 EXAMPLE SAPO CARRIZO AREA C Copper E Exploration l ti T Targets t All O Over: El Salto Target Carrizo El Sapo Norte El Sapo Este El Sapo Sur Zaruma Resources Inc. June Zaruma Corporate Information Listing Issued and Outstanding: Toronto Stock Exchange: TSX TSX-ZMR ZMR Frankfurt ZMR (secondary listing) 116.7 Million common shares 123 Million fully diluted 52 Weeks high/low: CAD0.45/0.11 Shareholding Structure: approx. 3,000 shareholders, (North America, U.K., Germany, Switzerland, Norway and others Largest shareholder: 6 % subsidiary of Glencore International AG Address/Contact: 20 Toronto Street (12th Floor), Toronto ON, M5C 2B8, Tel.: 416 869 0772, 416 777 1781 Fax: 416 367 3638 www. Zaruma.com , service(at)zaruma com service(at)zaruma.com Dr. Thomas F. Utter, Geologist - President & CEO Frank van de Water, B.Comm., C.A.– CFO & Director Prof. Dr. Peter Lorange - Director Mi h l P Michael Power, P P. E Eng. – Director Di t Michael B. Richings, Mining Engineer – Director David Kelly - Director Prof. Dr. Richard Viljoen, Geologist - VP Exploration Mike Carter, Geologist – General Manager Mexico James E Poulter - Senior Geologist Directors/Officers: Zaruma Resources Inc. June 2008