ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
ITC-177A-I
Pág 1 de 11
Edición nº 1
Index
LEAF
1. Sub-frame installation
2
2. Assembly of the clamp profile to the track
4
3. Lower track installation
5
4. Lining installation to the frame
6
5. Upper track installation
7
6. U-lock base installation
8
7. U-Lock installation
8
8. Installation of the strike in U-lock
9
9. Track installation
10
10. Door Leaf installation
10
11. Track cover
11
In order to define the opening sense of the door pay attention to this: If you look at the
door on the side where the upper track is intalled, the opening direction is the one to
which would make the opening of the door.
The photos of these instructions correspond to a left hand opening door. For a rightopening door you must follow all the instructions symmetrically.
1. Sub-frame installation
The sub-frame is supplied with threshold and corners that must be removed when the
work is completely contrived, never before.
Corners
Left hand opening
Sub-Frame
ITC-177A-I
Pág 2 de 11
Edición nº 1
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
Rivet Nut
Thresholds
The bottom of the frame and lower threshold indicates the ground level.
ATTENTION the frame has a sense and it cannot be placed in any position. To install it
in the correct position, look up the door where you will notice the upper track, you should
see the rivet nut in the sub-frame bar.
For doors opening to the left, rivet nuts will be in the bar that it is on our right side(the
observer is always on the side where the upper track, where hang the door leaf).
For doors opening to the right, rivet nuts will be in the bar that is on our left side.
Regulate the sub frame with level and plumb
Sub-Frame level
ITC-177A-I
Pág 3 de 11
Edición nº 1
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
Front view Sub-frame
plumb
Side view Sub-frame
plumb
Receive on-site with open anchors
Open the end of the anchors with pliers. Each height has three anchors.
After setting the work, remove the brackets and braces.
You can finish the wall as you decided, but you have to make sure to leave space for the
installation of the linings.
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
ITC-177A-I
Pág 4 de 11
Edición nº 1
Remove
corners and
threshold
2. Assembly of the clamp profile to the track
Screwed on the wall, plaster previously, the clamp profile of the track, placing it at the
position indicated by the manufacturer regarding the sub-frame (see diagram below for
profile position regarding the sub-frame).
Used 8x40 nylon studs with screws of 6.3 x50.
Level
Camping Profile
Support
Sub-Frame
Position of camping profile
support regarding sub-frame
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
ITC-177A-I
Pág 5 de 11
Edición nº 1
Once you submitted the clamping profile of the track, remove it in order to install the
upper track in the wide, after mounting the liners and the upper track in the width the
clamping profile of the track will be install it again.
3. . Lower track installation
Screwed on the ground, at the height of ground level if it isn’t finished, the lower track,
located at the position indicated by the manufacturer regarding the sub-frame (see
diagram of the lower track position regarding the sub-frame).
Assembly of
lower track
Lower track position regarding the frame
The lower track must be placed on the opposite side to the U-lock of the sliding door.
Used 6x30 nylon studs with screws of 4.2 x38.
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
ITC-177A-I
Pág 6 de 11
Edición nº 1
4. Lining installation to the frame
Insert tips of the inside lining on the outside lining of heights then repeat the operation
with it in the width linings.
Joining
Machine
Outside
linning
Inside linning
Nylon mallet
Linning Installation
Use a joining machine to join the lining, and finally, fold the tips on the inside lining above
the outside lining with a nylon mallet.
5. Upper track Installation
Rememberthat in order to screw the upper track, previously you must remove the
clamping profile of the track.
The upper track is mounted on the side where the track is and it is screwed onto the
outside lining width with four screws of 4.2 x13.
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
ITC-177A-I
Pág 7 de 11
Edición nº 1
Screw 4,2x13
Upper track installation
Now you can permanently install the clamping profile of the track.
Clampling Profile support
definitive installation
6. U-lock base installation
U-lock base is mounted above the sub frame linning in the U-lock side of the door (see
pictures).
U-Lock base
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
Screw M6x15
ITC-177A-I
Pág 8 de 11
Edición nº 1
Tighten the top screw
Hole below the screw of this pair
(screw only presented)
It screws with four pairs of Allen screws M6x15, 8 screws in total. The screws on the top
of each pair are heavily tightened, while the bottom screws of each pair only have to
submit for final tightening after mounting the U-lock(next step).
7. U-lock installation
The U-Lock is mounted on the base of theU-lock, fitting it over the heads of the allen
screws M6x15. Then slide the latch down and tighten the 4 screws in the previous step,
and thus the U-lock is fixed.
U-Lock
Fit the U-lock over the heads of the allen
screws, slide down and tighten the screws
down pairs
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
ITC-177A-I
Pág 9 de 11
Edición nº 1
8. Installation of the strike in U-lock
The strike of the U-lock is mounted on the U-Lock, fitting from the upper part till the lower
part, taking into account the position of the locker housing.
U-lock locker
Fit the U-lock locker,
from up till down
U-lock
9. Track installation
From step number 5 of these instructions, you can mount the track. For a proper
placement, the cap opening, comprising a M6 screw attached to onepart of the track has
to be on the side of opening.
End Stop
track
Camping Profile
support
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
ITC-177A-I
Pág 10 de 11
Edición nº 1
Screw the track on the clamping profile support of the track, leaving it in level.
Position the track on the clamping
profile support of the track holding the
benchmarks of the figure. When leaf
has been hang the track can be reset.
10. Door Leaf installation
First of all the ball bearing hanger has to be installed into the track.
Then fit the door leaf on the lower track.
Next, fit the screws on the door leaf to the ball bearing hanger and tighten.
Finally, check that the door and the lock, open and close properly. If not, it is indicative
that the door needs to regulation by the securing screws to the ball bearing hanger.
Sliding
door leaf
Lower Track
Set screw of the
leaf
Ball bearing hanger
ITC-177A-I
Pág 11 de 11
Edición nº 1
ASSEMBLY INSTRUCTIONS
Office Slide ( With Subframe)
11. Track cover
The track cover is intalled on the clamping profile support of the track, fixing with screws
of 4.2 x13.
Track cover
Screw of 4,2 x 13
If you have been followed all the instructions, door should be fully assembled.
Door Detail